Work Summary > Unit Work Summary

Environmental Protection Bureau Urbanization Summary


Summary of urbanization work in this district Since the beginning of this year, the district has guided the scientific development concept, promoted industrialization in accordance with the park, promoted urbanization, accelerated one integration, two dockings, implemented three strategic steps, and four strategic measures to build a new industrialized river. The development ideas of Bincheng District have increased the intensity of urban management and investment in urban infrastructure, and the city's attractiveness, cohesiveness and carrier functions have been continuously enhanced, and the urbanization process has been further promoted.
First, increase urban management efforts and further improve the city management level. We take the comprehensive improvement of urban environment as the overall starting point and increase the city management. First, in order to further promote the relatively centralized administrative punishment power, the Urban Management Administrative Law Enforcement Bureau was established, the Urban Management Comprehensive Law Enforcement Brigade was renamed the Urban Management Administrative Law Enforcement Brigade, and the law enforcement team was strengthened, and law enforcement equipment was added to improve the comprehensive law enforcement level of urban management. strengthen. In order to standardize law enforcement behaviors, we have also established strict assessment methods, step by step, step by step, set the posts and responsibilities, and strictly enforce the rewards and punishments, so that the responsibility of law enforcement members will be strengthened, and the urban ills that seriously affect the urban appearance of the city will be regulated and contained. The order has clearly improved. Secondly, in accordance with the principle of “separation of fostering and separation, separation of powers of affairs”, the gardens and sanitation departments were reformed in operation methods, and the tasks of sanitation and road cleaning and garden maintenance management were brought to the market, and public bidding was implemented to promote the management of municipal public facilities. The transformation of the mode of enterprise management, market-oriented operation and industrialization operation. The Sanitation Department has carried out a section bidding for the road cleaning of a total of 10,000 square meters of new roads. The Garden Office conducted a public bidding for the green management of the 10,000-square-meter section of the old and industrial areas. Through market-oriented operation, the organization has been streamlined, efficiency has been improved, staff sense of responsibility and sense of crisis have been stimulated, and road cleaning quality and garden maintenance management level have been improved.
Second, accelerate the pace of urban infrastructure construction, strengthen the city's carrier functional area and increase investment in urban construction funds, and the carrying capacity of urban infrastructure has been significantly improved. This year, we mainly invested in the following projects: First, urban road construction projects. Road renovation project. Designed by the design institute, the total length of meters, wide meters, a total of culverts, the total investment of 10,000 yuan. At present, the culvert refurbishment project has been completed. The pavement construction works will be carried out immediately after the Spring Festival. Road renovation project. The Urban Construction Design Institute is designed according to the overall plan for the overall renovation of the road and the road on both sides of Tsinghua University. The road works are full-length meters, the main road is wide meters, two-way eight-lane, and the sidewalks are wide and wide, all of which are paved with granite. The street lamps on both sides adopt domestic advanced lighting facilities. All the pipelines are all in the ground, with a total investment of 10,000 yuan. At present, the project has been basically completed. The second is the landscaping project. Square and green belt project. The total area of ​​the square and the north-south extension green belt is 10,000 square meters, with a total investment of 10,000 yuan, designed by the garden design institute. At present, the construction of greening and green belts in the square has been completed, and the hardening, paving and landscaping of the square and the landscape and management rooms in the green space have been basically completed. The main sculpture, lawn lamp and fountain are being designed and constructed. Greening projects in the industrial areas in the north and south. Greening in the district is the focus of this year's greening project. The roads in the district were highly greened, and various types of trees and shrubs were planted. The green area was 10,000 square meters and the investment was 10,000 yuan. At the same time, the broken trees in the starting area, the lack of soil and less seedlings, backfilling, replanting evergreen trees, spreading grass species, further consolidating the greening effect. The third is infrastructure supporting projects. Thermal power plants and heating projects. The thermal power plant is invested and constructed, with a total investment of RMB and annual power generation, providing 10,000 square meters of heating heat. At present, the civil construction investment has been completed by 10,000 yuan, of which the main plant investment is 10,000 yuan. The main works of the water workshop, pressurized pump station, water tower, chimney, crushing workshop and dry coal shed have been completed. The heating project is designed by the design institute. The design project has a heating capacity of 10,000 square meters and a total investment of 10,000 yuan. It is necessary to lay the main pipeline kilometers and build a distribution station. At present, the main line has been laid, the main construction of the first station of the land has been completed, the transformation of the secondary pipeline has basically ended; the distribution station has been completed, the boiler room of each distribution station has been confirmed, and the renovation of the indoor facilities of the residents is underway. in. Natural gas pipeline network engineering. The natural gas project is a key project of the municipal government. The municipal government shall uniformly invest, and the district shall be responsible for planning, design, construction and construction, and coordinate the compensation and demolition work of the attachments on the ground. The total investment of my section project is 10,000 yuan. It is necessary to lay the main pipeline kilometers. It is necessary to excavate and fill the earthwork square meters. It has been basically completed. The fourth is the laying of industrial and domestic sewage pipe network. Development area sewage project. The project has been completed from the north to the north side of the plant, to the east through the green belt of the high-pressure corridor, and then to the main sewage pipe in the access area. Riverbed sewage interception project in the river section. The project will be laid from the river to the east end of the river with a long-meter, 500-800cm diameter cement pipe. All the sewage outlets that have been discharged into the river for a long time will be connected to the main pipe to the main sewage pipe network, completely ending the old The history of rainwater pollution and sewage discharge to the river. The project has been completed. The second phase of the southern section of the full-length rice project. The project has been started along the road to the north of the river along the river to the north.
Third, speed up the transformation of the old city and the pace of real estate development and construction, and effectively improve the living conditions of the residents. In order to create a good production, living environment and convenient travel conditions for the residents, in order to thoroughly improve the living conditions of the residents, the year, the main area of ​​our district I have done the following work: First, the overall renovation project of the village. On the basis of the overall demolition of Zhiyang Village in the year, we carried out an overall transformation. The construction of a relocation house of 10,000 square meters was mainly focused on the resettlement households involved in the resettlement of the resettlement village and the reconstruction of Liancheng Road. At present, the 10,000 square meters of relocated houses have been basically completed. The second is to attract foreign investment, carry out real estate development, and build a residential community with complete facilities and complete functions with high standards. In the year, our district mainly carried out development and construction of residential areas, with a total development area of ​​10,000 square meters and a total investment of 10,000 yuan. Through the transformation of the old city and the development of real estate, the urban residential grades have been greatly improved, and the urban residential conditions have been greatly improved.
Fourth, actively strengthen the construction of small towns. In order to build small towns into an important carrier for economic development in the region, we will improve functions as soon as possible, gather populations, and play the role of rural regional economic and cultural centers. We adhere to the principle of unified planning and rational distribution, actively explore various modes of development of small towns, adapt to local conditions, and highlight characteristics to do a good job in building small towns. First, take the role of point and face, give full play to the typical driving role of the central town, conscientiously implement the "four ones" activities of the central town, and mainly focus on infrastructure construction such as roads, greening, water supply and drainage, power supply, and communications. This year, the two offices in the four districts invested a total of 10,000 yuan, hardened roads of 10,000 square meters; investment yuan to transform tap water to improve rural farmers' water problems; invest 10,000 yuan to build bridges; invest 10,000 yuan, green area 10,000 square meters . The second is to increase the construction of the park. Promote the scale and grade of small towns. This year, a total of industrial parks have implemented projects with an investment of 100 million yuan and a built-up area of ​​10,000 square meters. The third is to seriously plan the outline, adhere to the first planning and post-construction, and implement the system without planning and not approving the project. According to the strategic thinking of developing a modern ecological riverside city in our district, the planning of the office towns and towns was comprehensively adjusted, and the planning was re-planned according to the overall planning idea of ​​the district, and the planning of some towns and offices was revised and improved. In short, through the joint efforts of all levels and departments in the district, the city's appearance in our district has been renewed and the level of urbanization has been improved. Although we have achieved certain results, but the requirements of the provinces and cities, compared with the brothers and cities, there is a certain gap, we will continue to work hard to improve the urbanization of our district.

recommended article

popular articles