Work Summary > Unit Work Summary

Construction Environmental Protection Bureau work summary


1. Strive to complete urban regional planning and further improve the urban taste of the development zone:

Only by rationally planning and constructing the existing areas of the development zone, and integrating with the urban planning, can the urban function and urban taste of the development zone be further improved. At the beginning of the year, the bureau led the relevant personnel to conduct a detailed investigation and study on the existing urban areas of the development zone, and put forward preliminary planning opinions. The Shanxi Provincial Planning and Design Institute has been commissioned to compile the detailed control plan for the Zhangzhou Development Zone, which has been basically completed. After further approval, the construction of specific projects for infrastructure construction and investment promotion will be implemented in accordance with the plan.

Second, strive to complete the regional environmental assessment, and provide timely information for the construction of investment-inviting cities:

At the beginning of the year, the head of the regional environmental assessment team of the development zone was formed by the director, and a large amount of informative materials were collected through hard work, and several consultations with the Shanxi Provincial Environmental Protection Research Institute were conducted to complete the regional environmental assessment with economic permission. .

Third, further improve the infrastructure construction of the development zone and create an excellent development environment.

1. From budget design to completion acceptance and settlement, the office building of the development zone has been reconstructed, and the renovation project has been used normally.

2. The pipeline has been completed in 70% of the pipelines in the thermal pipeline.

3. The natural gas entering the district has basically completed the final household pipeline.

4. According to the phenomenon of parking chaos in the compound of the development zone, a parking lot has been added in the backyard. It is now ready for use. After the operation, the phenomenon of parking disorder in the hospital can be basically eliminated.

5. The Wangzi-shaped main road of the development zone was opened. Through the hard work of all the staff, it has already possessed the data of measurement, budget and other information. After the economic conditions are mature, the plan can be implemented.

6. The hardened paving of the sidewalk of Wuyuan East Street has not started construction due to the laying of pipelines in the area of ​​the heat company.

7. The two schemes of tap water expansion, renting wells and drilling wells have been completed and will be implemented after the research decision of the management committee.

Fourth, strengthen environmental pollution control in the region and implement the “three simultaneous” approval system.

In the past year, the bureau has fulfilled the “three simultaneous” approvals for the construction and approval projects for the past year, and implemented the renovation and dismantling of the tea bath furnaces that are not in compliance with environmental protection regulations, and forced the implementation of Miyang School and Xinyuan Entertainment City Small Boiler. Demolition and renovation of the boiler of Tongli Paint Factory. Eliminating the source of pollution to the atmospheric environment of the development zone has been recognized by the society.

V. Strengthen the construction project management and standardize the project to report the issuance and bidding procedures for the “two books and one certificate”.

At the beginning of this year, the Bureau re-standardized the bidding work program for the construction project construction planning in light of the actual conditions of the construction project of the development zone and the relevant provisions of the Construction Law of the People's Republic of China and the Bidding Law of the People's Republic of China. The construction projects such as “Jiadi Huayuan”, “Zitan Jiayuan” and “Jianyuan Community” developed by Yanmen Real Estate Co., Ltd. have implemented bidding, and the bidding rate has reached 100%. This year, the eight projects under construction in the development zone have a total area of ​​177,465 m2 and a total investment of 223.14 million yuan. All of them have implemented project quality supervision. During the supervision process, the division of labor and cooperation, personal accountability system, and the experience of each part of the project were all qualified. The two engineering experiences of the “Environmental Protection Bureau Environmental Monitoring Building” and “Golden Eagle Electronics Company Staff Residential Building” completed this year were all qualified. Safety production and civilized construction are our unremitting efforts throughout the year. At the beginning of the year, after short-term training on the safety production of the relevant personnel of various construction enterprises, the bureau signed a civilized construction safety production responsibility with each construction and construction unit. After two large-scale comprehensive inspections of safe production and civilized construction, the level of safe and civilized construction of various construction units has been greatly promoted. The construction in progress of the development zone from the safe and civilized construction materials to the measures and equipment are basically in line with the requirements of the "Standards for Construction, Construction, Safety and Civilization Construction Standards". This year, a total of 2,846,400 yuan of infrastructure fees and engineering quality supervision and management fees were collected, and the charging rate reached 100%.

6. Take corresponding measures to monitor the construction project in the area.

This year, the bureau took the lead in organizing the establishment of four engineering quality monitoring and evaluation leading groups, respectively, the “quality of the project management project renovation project”, the “real estate company staff dormitory project budget”, and the “Environmental Protection Bureau Environmental Monitoring Building completion acceptance”. "The completion and acceptance of the staff dormitory of Golden Eagle Electronics Co., Ltd." was monitored and reviewed. The problems in the monitored projects were corrected in a timely manner by issuing rectification notices and proposing rectification measures.

7. Optimize the development environment and carry out greening work in an all-round way.

Since the establishment of the landscaping team, the SIPO has fully mobilized the enthusiasm of all the members, investing 1951.4 yuan to clear the weeds and paint the trunks of the trees on both sides of the three main roads of Wuyuan East Street, West Street and Wutaishan North Road. It has played an active role in protecting fires and trees in the area, preventing pests and diseases, and safely overwintering. Under the leadership of the in charge of the director, he went to Hebei twice and invested more than 100,000 yuan to buy water wax, red leaf sea bream, eucalyptus edulis, and Japanese cherry blossoms, which were planted in the main roads of Wuyuan East Street, Wutaishan North Road and Wuyuan Street. Within the green belt. Through careful planting and reasonable maintenance, the survival rate has reached more than 90%, which has made the appearance of the development zone significantly improved. In order to be able to pruning, finishing and maintaining the flowers and trees hedges in the area in time, the company invested more than 20,000 yuan to purchase the necessary landscaping machinery such as lawn mowers, hedge trimmers, fight drugs, brush cutters, etc., according to the flowers and trees in the area. The growth situation has been carried out for dozens of maintenance, such as pruning, cutting, and spraying. Investing 35,000 yuan in 15 cars and purchasing 2,500 m2 of lawn from the provincial capital, planted in the courtyard of the management committee, so that the greening environment of the compound has been significantly improved. In order to reduce expenses, 148 strains of juniper were transplanted in the South Third, Fourth and Fifth Lanes. From the human, financial, and material resources, 12 points were used to complete the greening tasks in the district formulated by the management committee at the beginning of the year.

8. Do a good job in environmental sanitation in the district and add new highlights to the development zone.

According to the sanitation work, regardless of the spring, summer, autumn and winter, without the special nature of the holidays, under the correct decision of the leadership of the management committee, the number of sanitation workers and personal wages were increased at the beginning of the year. Re-divided the responsibility area, signed the responsibility system, invested more than 30,000 yuan, purchased and installed 50 garbage bins, 5 garbage houses, 5 garbage bins, and invested 10,000 yuan twice, and cleared the original temporary garbage dump. On the garbage, the construction waste of the heating company was over 3,000 yuan, and 18 units and shops signed the “five packages in front of the door” responsibility. In the past year, both parties have fulfilled the system promised by the responsibility. The above work has made a significant improvement in the environmental appearance of the development zone, and has been well received during the city's patriotic health inspection.

9. Strengthen supervision and management in the district and effectively improve the district environment.

In the past year, the bureau has taken the lead in the operation of the Urban Management Supervision Brigade to improve the regional environment and standardize the order of the construction business market. The phenomenon of occupying the road construction and randomly dumping materials was cleared five times, and the business hours and operating booths of the mobile traders were standardized, so that the order of the construction operation market of the development zone was basically orderly. At the beginning of the year, in conjunction with the establishment of the Fujian-Taiwan line civilization corridor, convening 21 related units, issued 71 excellent development environments, established the rectification task of the civilized corridor, and signed environmental comprehensive remediation responsibilities with the heads of various units. shape. During the remediation, 210 cubic meters of dead corner garbage, more than 80 small advertisements for psoriasis, 180 meters of new wall, 210 meters of illegal railings, 2 illegal houses, 15 discarded poles, and a lot of work to make the development zone The construction market and the operating market order have been upgraded to a new grade. This year, the urban management supervision unit has collected a total of 30,227 yuan for the road tolls, health expenses, and road fees, and the charging rate is 100%.

10. Strengthen the management and maintenance of municipal facilities to ensure unimpeded discharge pipelines.

This spring, we organized a large number of manpower, more than 900 meters of pipelines outside the transmission area, 2400 meters of pipelines in the district, 284 clear water wells, 2 sedimentation tanks, 18 panel inspection wells in the repair area, 34 well covers, guaranteed The sewage discharge in the district has been unimpeded for one year.

XI. Initial plans for the future

In order to establish a civilized, harmonious and fast-developing development zone, according to the “xxx” planning and construction content, do the following work:

1. Further standardize the approval planning program for construction projects.

2. Do a good job in monitoring, monitoring and charging infrastructure fees for various projects in the district.

3. In order to further improve the urban taste of the development zone, it is necessary to strengthen the sound construction and maintenance of the basic implementation of the development zone.

4. Further regulate the management order of the construction market and the operating market.

5. Chuangyou Development Zone attracts investment environment, do a good job in environmental sanitation in the district, eliminate pollution sources that have an impact on the environment of the development zone, and further improve the greening, lighting and beautification of the development zone.

6. Accelerate the construction of infrastructure in accordance with the concept of operating a city, especially the expansion project of the North-South Road, and strive to complete the construction next year.

We have confidence, determination and hope.

The future of the development zone is even better!

recommended article

popular articles