County Water Affairs Bureau's first quarter work summary


In XX, the county's water work will thoroughly implement the No. 1 archives of the central government, accelerate the reform and development of water resources, focus on implementing the most stringent water resources management system, strengthen the construction and operation management of water infrastructure, pay attention to scientific water control, water control according to law, and strengthen We will build weak links and vigorously develop people's livelihood water services to provide water resources for the construction of the “Green Beijing Demonstration Zone”. First report the first quarter work summary and the next work schedule as follows.
I. Undertake the implementation of the key work of the county party committee and county government
In the task of the project work of the county party committee and the county government in XX, there were 14 projects led by the county water bureau, 12 of which went well and 2 had certain difficulties. Details are as follows:
Smooth project
1. Water consumption per 10,000 yuan of GDP fell by 5%. We will strive to reduce water consumption by strengthening public opinion propaganda, social water supervision, agricultural water conservation, construction of rain collection projects, and water-saving creation activities. From January to March, the total water consumption of the county was 7,386,500 cubic meters, down 5.1% year-on-year. Among them, industrial and domestic water is 5,303,800 cubic meters, and agricultural water is 2.0827 million cubic meters.
2. Mainly relying on agricultural drip irrigation and basic farmland water source facilities in towns and villages such as Dabanshu and Kangzhuang, and developing 10,000 mu of agricultural water-saving irrigation. The project started on March 15 and has completed 3,249 mu of agricultural water-saving irrigation area in 16 villages and towns. The land area of ​​Kangzhuang Town and Jingzhuang Town, which is being implemented, covers an area of ​​1,357 mu.
3. Implement the post-grant resettlement support project. Completed the verification registration and subsidy distribution of 35,000 rural immigrants and non-immigrants. The XX Immigrant Receiving Village Support Project involves 94 projects in 85 villages in 10 townships. Four projects have been started in the first quarter, involving 2 farmland water conservancy projects, including 900 mu of water-saving irrigation, 1 well, and 1 cultural center. Most of the projects are under construction review and on-site reconnaissance; the verification and registration of rural reservoir immigrants is underway, and the verification registration work is completed before the end of April; the non-immigrant verification registration has not started.
4. Implementation of five clean small watershed construction projects in Dazhuangke, Sanbao, Badaling, Nanwan and Liuxi. The two ecologically clean small watersheds in Liuxi and Badaling have been approved by the Municipal Water Affairs Bureau. The project was implemented in April XX; the implementation plans of the three ecological clean small watersheds in Xidazhuang, Sanbao and Nanwan have been reported to the Municipal Development and Reform Commission. Waiting for the approval. The preliminary design is also being reported, and it can be started after the approval.
5. Implement 5 rural rainwater utilization projects. An implementation plan is being prepared.
6. Carry out the first water census work in the county. The organization of the organization, the deployment of personnel and the 7 special trainings have been completed. The division of census tasks has been clearly defined and the responsibilities have been implemented. The preparation of the overall census plan and 8 special programs has been completed. The rivers and lakes special conditions, irrigation district special projects, economic and social water special projects, water conservancy projects, industry capacity special list check has been completed, river and lake governance protection special, irrigation district special, economy The social water special project is under construction. It is planned to carry out an inventory work in April.
7. Create one water-saving community and three water-saving units. The preliminary mapping work of 1 community and 3 water-saving units has been completed.
8. Promote the first phase of surface water supply in the plain area. The project feasibility study has been completed and the water resources demonstration has been approved by the Municipal Water Affairs Bureau. Initially solicited opinions from various departments such as planning, land, and environmental protection, and the planning plan has been reported to the Municipal Planning Commission. The EIA of the first quarter program has been completed and a water conservation plan is being prepared. Recently, the land pre-examination, the EIA approval, and the plan of the Municipal Planning Commission were reviewed.
9. Implement the county town safe water supply renovation project, newly open water source wells with 6 eyes, expand the current water plant, and increase the water supply capacity by 0.9 million cubic meters per day. The project feasibility study was approved on June 17. The preliminary design was approved on December 1, and some tenders were completed. The 6-hole water source well has been completed and the Daqin railway pipeline has been pre-buried.
10. Establish a long-term mechanism for safe drinking water and sewage treatment projects in new rural areas. Investigate and study the post-operation management of the new rural water supply and sewage treatment project, and initially prepare operational management rules.
11. Ensure the effective operation of the sewage treatment plant in the county. The operation supervision of the county sewage treatment plant was strengthened, and the operation fee guarantee mechanism was investigated with the county finance bureau. The operation of the rural sewage treatment plant, the Water Affairs Bureau has drawn up a preliminary plan for social management, and will report it to the government for approval and implementation after further improvement.
12. Strengthen flood control and drought relief work. The XX drought prevention plan was revised, and it has been approved by the county government and reported to the Municipal Flood Control Office for record; the maintenance inspection of 22 stations of the automatic monitoring system was completed; and the three fields in Sichuan were completed on March 9, 19, and 29 The average water content of 0-30 cm soil was 8.4%, 12.1% and 13.9%, which was the same as last year.
There are certain difficult projects
1. Implement ecological construction of important surface water source areas on both sides of the Qinshui River. The feasibility study report of the project was submitted to the Municipal Development and Reform Commission for approval after being reviewed by the county-level departments in September. The problem is that the project is a project designated in the Beijing Surface Water Conservation Project planned by the Municipal Development and Reform Commission and the Municipal Finance Bureau. However, due to the adjustment of municipal funds, the municipal review has not been initiated in the first quarter. It is recommended that the County Development and Reform Commission coordinate the Municipal Development and Reform Commission to start the review as soon as possible. The County Water Affairs Bureau will pay close attention to refining and improving the construction plan.
2. Promote the construction of the second sewage treatment plant in the county. The feasibility study of the county second sewage treatment plant project has been completed, and the opinions of the planning, land, environmental protection and other departments have been solicited and submitted to the county development and reform commission for preparation. The planning plan has been submitted to the Municipal Planning Commission. The environmental assessment of the original plan in the first quarter has been completed, and the water conservation plan is being prepared. The land pre-examination, environmental impact assessment and municipal planning plan review are recently carried out. The problem is that the south side of the construction area has the status quo Xinyanong Road and the west side secondary road. The green land and red line of the planned road need to be considered for the project construction area. It is recommended to further improve the project plan and investment.
Second, the performance of the county's economic and social development in the situation since the end of last year to step up the XX year planning and planning work in an orderly manner, combined with the county party committee, county government and municipal water work priorities, the development of the project, determine the new city water supply network transformation, The first task of the first water census and other work. In the first quarter, the deployment and implementation were intensified according to work tasks. First, the implementation plan for new rural construction and various water projects was completed. The flood control project of Fokoukou Reservoir started on March 2, and the county town safety water supply renovation project has completed bidding and started construction on April 1. Second, the first water census was launched on March 3. It is planned to complete the census registration of rivers and lakes, water conservancy projects, water conservancy institutions and key social and economic water users in the county during the year. Third, on March 9th, the first test of the Daejeon in Sichuan District was completed, and the development of drought conditions was closely monitored, and scientific drought prevention guidance was provided. Fourth, the Baihebao Reservoir began to deliver water to the Miyun Reservoir on March 10, with an estimated water supply of 45 million cubic meters. The fifth is to take the 19th "World Water Day" and the 24th "China Water Week" as an opportunity to carry out propaganda and water conservation and water conservation. In the legal market of the Japanese market, 10 cases were used in the form of case-speaking to publicize the water law violation cases and increase the publicity effect. On March 22nd, a large-scale publicity campaign was organized to carry out various kinds of publicity activities with various water supply units and township water stations. In the first quarter, six illegal water cases were filed and reported. Sixth, the water-saving management work was done under the guidance of three red lines, and the water consumption index of the county was completed in XX. The seventh is to strictly implement the water resources argumentation, water permit, and sinking permit approval procedures. In the first quarter, a total of 6 wells for six wells were approved. Eighth was to carry out water law enforcement inspections, and investigated and dealt with 2 illegally drilled machine wells, 2 smuggled sand and gravel, and handled 2 fish ponds within the scope of river protection.
Third, the future work arrangements to implement the Central No. 1 archives, accelerate the reform and development of water affairs, strengthen the publicity and implementation of the No. 1 archives of the central government, and formulate the opinions of the county's implementation of the No. 1 archives in conjunction with the arrangement of the city's water work, and set off a new upsurge in water reform in the county. Resolutely implement the three control red lines of “total water consumption, water use efficiency and water function area limit”, rationally allocate existing water resources, strictly review water resources demonstration and water permit approval management, and implement water conservation through technological innovation and new technology application. Pollution control and reuse of reclaimed water; strengthen investigation and research, implement pilots of bargaining water, break the current situation of “big pot water” in rural areas, gradually implement water charges and cascade water prices, and promote the creation of water-saving society. The water consumption per 10,000 gdp drops by 5 percentage points. .
Strengthen industry management, improve service level, continue to strengthen water supply and drainage management; improve flood prevention and drought prevention work plans and measures; strictly implement safety production responsibility system; strengthen water project quality supervision; implement 100-day rectification action work to promote water regulation according to law; further standardize water Administrative licensing; strengthening rural grassroots water management; achieving “six security” in water affairs.
Accelerate the construction of key projects, improve the water supply security capacity of the people's livelihood, optimize the urban and rural water supply pattern, do a good job in the implementation of the new city's safe water supply transformation, improve the water supply security capacity of the new city; improve the intensive water supply unit of the village and town, and complete the construction of the new rural wading project in XX; To guide the operation management of Fuyang Water Industry and Reclaimed Water Plant; accelerate the construction of surface water supply project in Yanqing County Plain. Continue to increase the construction of ecological governance projects. Complete the task of small watershed management project; complete the water-related construction of Binhe Wanmu Forest Park and the collapse treatment of Guanting Reservoir; accelerate the ecological construction of important surface water source areas on both sides of the Qinshui River, implement the upgrading of some township sewage treatment plants, and further Improve the pipe network and related facilities of the built sewage plant. Do a good job in the annual reservoir resettlement verification registration and fund issuance, and complete the implementation of 94 support projects. Completed 13,000 mu of agricultural water-saving irrigation projects; and built 5 rainwater utilization projects.
IV. Work Highlights in the Second Quarter I. Continue to organize and carry out the “Creating the First to Fight for Excellence” activities, combining various tasks with the implementation of the Central No. 1 Archives, the spirit of the municipal and county conferences, and the wading administrative licensing, administrative approval, etc. In terms of improving the overall work agency system, the public service is reflected in improving work efficiency and work level. We must do a good job in the system-wide clean government and discipline supervision work, and do a good job in the supervision and implementation of the county government and the bureau's subcontracting project in accordance with the requirements of the county party inspection team.
2. Collecting drought from the beginning of April, continuing to monitor the 16 points of the county, organizing townships and towns to inspect and repair the wells and water stations in the county, and timely guiding drought relief work.
Third, organize the deployment of the work, improve the emergency plan, do a good job in the maintenance of flood control and drought relief information system, complete the maintenance and repair work of artificial rainfall stations and telemetry stations. The dangerous villages in the main rivers, ponds and mountainous areas of the county threatened by floods and landslides were inspected one by one. Complete the safety hazard investigation of the reservoir and dam before June 1, complete the emergency crossing project of the ancient city and Fokoukou Reservoir, and prepare for the wedding.