Work Summary > Unit Work Summary

Unit work summary


Article 1:

I. Stand in a clear political

People say that personnel is also a real power position. Of course, he probably refers to other industries. I think my work experience is that I am engaged in a relatively policy-oriented work. The face is "Yes is 'Yes'" There is no ambiguous answer to the question of 'not'. For specific problems, once a decision is made, it is not the case for this type of person. In the face of that type of person, it can be "not the case", and it is not possible to carry out selfish distractions and affection. Therefore, the work of the personnel department should be a very serious work with a principled and guaranteed party spirit. I have done this in my past work, and I have the loyalty to the party and the responsibility to others.

Positioning

The working position of the school personnel is to contact the higher authorities. There are fewer jobs associated with the teachers in the school. Many things are taken from the higher authorities to collect the management data of the school, including fund management and personnel management. Work management and school development management, etc., so a lot of time is a person who is working hard, not being discovered, not being understood by the hard work of my work, and the importance of the work I am doing. .

1. In order to facilitate the access to information, this summer I have made great efforts to organize all the relevant personnel information of the school teachers into a single material. As my work materials, when many projects need to be consulted in the future, I can be the school in the fastest time. The leader provides information. Many teachers want to know some of their own situations. I will know when I check them out. The teachers read this information. I said with emotion: To sort out this thing, is it a big project? Yes. In order to sort out this thing, I didn't know how many plans were designed, made a waste, and then did it again. It took nearly 20 days to complete the big project.

2. Processing capital has been carried out three times this year, followed by salary adjustments, one in the summer and one in New Year's Day. When the heat is cold and cold, when others are reunited with their loved ones in the air-conditioner to enjoy the family fun, I braved the hot sun and braved the cold wind, and went to the school to work for the teachers' salary and salary. In the summer, I burned 38.8 degrees because of Time is tight, can't stop, can only take medicine while working, New Year's Day, cold weather is terrible, in order to complete the work in time, I have a cold and cough until the evening often sit up and can not stand the chest, but I can not stop because Time is tight. I’m going to have a winter vacation soon. The teachers are all working hard for a semester, waiting for a good holiday and a grand festival. I’m working on the third time for the teachers, and I’m promoted to the salary level and year-end for two years. The one-time bonus issuance is the so-called thirteenth month wage effort. The processing capital is a happy event for the teacher. It is a happy event for me, and it is even more difficult. Of course, this is my job. No matter how hard I am, I will finish my work meticulously. I have always asked myself, I can't be the best, but I will work hard for each of the "better".

Third, civilization and solidarity are good to cultivate, and lead by example.

The teacher is the engineer of the human soul. To mold the soul of mankind, first of all, there must be a good machine that can mold the human soul. What is a good machine? I think this machine should have any bad conditions, no matter what the external conditions, no matter what others If you want to damage you, you can accept it with a broad mind and influence him. I think I have done this. I am a teacher and should be a role model for students. I am also a role model for middle-level cadres and ordinary teachers. To this end, I strictly demand myself everywhere, so that I will not be late for early class, no class, no classroom, no badge, no standing. Dressed in a simple and generous dress, it is neither sensational nor eccentric. Let the students serve me and not respect me, respect me not far away from me. Let colleagues get along with me, both easygoing and rest assured.

I care about my colleagues' lives, actively help colleagues who have difficulties, open my mind, accommodate my colleagues' misunderstandings, tolerate my colleagues' unreasonable words and deeds, and reduce misunderstandings with colleagues. Sometimes I feel very sad when I am not at ease. Pain, why can others misunderstand me, I am afraid to hurt others? But think carefully, after all, I am a middle-level cadre. For the stability of the school, for the convenience of the manager, I should cooperate with the school leaders to reduce the number of colleagues with them, especially The contradiction between teachers who have "psychological hatred" for middle-level cadres. There is a saying that "justice will defeat evil-evil in the end"

Fourth, the work is diligent and hard-working, and the ability to study the business is strong, and the duties are in place.

4. The work of this semester From the big aspect, I completed the August and September: 1) talent introduction work 2) school statistics law enforcement inspection 3) non-editing personnel employment system 4) part contract work contract signing work 5) Statistics on deductions for deductions statistics 6) Co-insurance personnel contract 7) Employment of migrant workers 8) Statistical adjustment of wages and standards 9) Adjustment of salary, registration, and review of one person and one table 10) Fill in the three types of forms to fill out the work 11) Annual assessment and statistics work 12) Annual assessment of one person and one form

October: 1) Compilation of teachers and staff establishment 2) Cataloging of teaching staff rosters 3) Correction of teacher personnel information including A, basic personnel table B, academic qualifications and degree table C, professional and technical qualifications D salary table and other information 4) transfer procedures for transfer of personnel 5) intermediate and senior teacher ratio forecast work 6) contract work for imported personnel 7) medical insurance subsidy wage statistics and calculation work 8) medical supplement one person one form fill, Audit, stamping, numbering work 9) Registration of social security card

November: 1) Blood donation work 2) Retirement teacher's teacher qualification certificate application 3) Primary job title declaration and approval work 4) Junior title personnel promotion salary work 5) Primary job title staff post adjustment work 6) Basic situation of faculty and staff Summary Table 15 sets of forms 7) Attendance statistics deduction statistics work

October: 1) Talent introduction and recruitment work 2) Year-end report total 30 sets of table statistics work 3) Labor welfare statistics work 4) Labor situation 104 table statistics work 5) First salary standard adjustment work 6) Salary adjustment one person one Table filling, review, stamping, file adjustment number filling work 7) Retirement personnel increase pension work 8) Insurance benefits composition statistics work 11) Attendance statistics deduction statistics work 12) Annual assessment summary table, personal form review, seal Work 13) Social security card issuance work

January 2002: 1) Retirement pension for the pensioner 2) The third salary is the normal promotion of the salary grade 3) The year-end one-time bonus distribution work 4) Talent introduction and handling work 5) Ye Mingyu retirement procedures 6) Attendance statistics deduction statistics work 7) Supplementary conditions for the processing of teacher qualification certificates 8) Archiving of personnel information

V. Be brave in research and innovation

Exploring and innovating is the responsibility of young people and the only way for society to develop at a high level. I am in line with the historical responsibility given to us by the times, participating in personnel computer operation training, courageously using modern weapons in personnel work, constantly looking for the scientific and normative nature of personnel work, and striving to find a point in the field of personnel work. Something of value.

In short, I am worthy of the glorious title of a people's teacher, a Communist-party member, and worthy of the heavy responsibility entrusted by the school leadership.

Article 2:

Internship for more than two months. This is a precious experience in my life. During this time, the leaders at all levels have given me great help in my work and have given me great care in my life. The leaders’ hard work and seriousness in the work deeply shocked me and made me understand what it means to be “Bao Jianfeng’s grinding out”. While awe-inspiring to the leadership, I am also embarrassed by my arrogance and quick success.

During these two months, under the careful care and guidance of the leaders and colleagues, I have been able to do some work under my own efforts. I will summarize my internship work during this time as follows:

First, through the accumulation of learning and daily work, I have a certain understanding of data sorting and sending and receiving.

Collect and save the archives and conference files issued by the headquarters and relevant departments, and organize the files that have not been specifically organized into categories.

Do a good job in the issuance, circulation and transmission of all kinds of files and drawings and archive the original files. According to the regulations of the project department, the archives shall be issued, circulated and transmitted by the relevant departments, and the receiving department shall sign and confirm the original files and archive the original files. The project materials should be filled out carefully, the word performance should be neat, the binding should be neat and tidy, and it can be seen at a glance, so that it can be easily checked and archived later.

In order not to make my work less and miss items, I have summarized a file filling process: 1. Read the file and understand the general content. 2. Fill in the corresponding text in the corresponding folder. 3. Print, fill in the form and write a valid list. 4. Please ask Cui Sister to complete the order. 5. Submit to the leader to read, wait for the reply 6. Fill in the corresponding directory within the file box, and store the original. 7. Deliver the file according to the leadership requirements, and fill in the text carefully. There is a certain interval between the completion of the whole process. During the period, you must know where the files are going and ensure the recovery of the originals.

Second, abide by various rules and regulations, work hard, and continuously improve their literacy.

The professional ethics of dedication and dedication is the guarantee for the smooth development of each job and the ultimate success. During these two months, I have complied with the company's rules and regulations, worked hard to do my professional work, and carefully completed every task of leadership, earnestly performed my duties, and constantly improved my team during my work. Cooperative spirit, and business quality.

Third, earnestly study the functional knowledge of the post, and study diligently.

When I first came out of school, my understanding of work was narrow. There is a lot of work that I have never touched before. I need to continue to learn and hone, and also to quickly adapt to the work style and work pace of the project department. If you don't understand what you are asking and what you can't do, you must be diligent, diligent, and get to know the relevant knowledge and standards as soon as possible.

Fourth, carefully listen to the lack of guidance and improvement.

"There is a glimpse of the end of the paper, I know that this matter must be carried out." When I first read this sentence, I understood it literally. However, after this internship, I not only really understood its meaning, but also deeply understood it. To its connotation. Although I came to the project department for nearly two months, my understanding of the whole project was still not thorough. There were not many opportunities at the construction site, and there was no systematic and complete understanding of the division of labor. With the further familiarity with the project department and work, I also hope that the leadership will assign more work to me in the future. I feel that doing more work can better reflect the value of my life. "Industry is good at diligence and absurdity." In the future work, I will continue to learn business knowledge, and constantly improve my business skills through more reading, more questions, more learning, and more practice. There is no end to learning, the development of the times is changing rapidly, and the knowledge of various disciplines is changing with each passing day. I will work tirelessly to learn all kinds of knowledge and use it to guide practice.

Thanks and the leaders of the project department gave me this internship opportunity. Through this internship, my theoretical knowledge and practice are combined, and the comprehensive quality is fundamentally improved. It is no longer a piece of paper. At the same time, my outlook on life and values ​​have undergone some changes and gradually matured. Thanks to the leadership for my care and love, I have better integrated into the big family of the project department, and adapted to work faster. Thanks to all my colleagues, your dedication and seriousness are examples of my study. It is a great honour for me to work with you! In the future work, we must work hard to be the leader of the right arm and make our work more solid. , contribute to the development of their own strength

Article 3:

Time flies, spring goes to winter, 2019 is about to pass, and a new 2011 is coming. Looking back over the past six months, under the care of the leaders of all levels of the project department, under the concerted efforts of the supervisory owners, design units and various departments, we have overcome all the unfavorable factors and ensured the smooth construction of the C1 project of Wulonglong Hydropower Station. .

First, a brief introduction to the completion of the various project images for the current year.

structural work

1. Diversion tunnel entrance slope engineering

The excavation of the inlet slope of the diversion tunnel is completed above EL.1981.0, and the support of EL.1921.0 or above is completed;

2. Construction branch hole and diversion tunnel project

11# Construction main hole excavation and support is completed, the cumulative support hole footage is 126m; 1# construction support hole upper excavation hole excavation and support is completed, the cumulative branch hole footage is 146m; 1# construction support hole lower excavation hole excavation support is completed 64m The cumulative branch hole footage is 64m;

22# Construction main hole excavation and support is completed, the accumulated support hole footage is 15m; 2# construction support hole upper excavation and excavation support is completed, the accumulated support hole footage is 106m; 2# construction support hole lower excavation hole excavation support is completed 119m The cumulative support hole footage is 119m;

31# Diversion tunnel excavation completed support 334m;

42# diversion tunnel excavation completed support 427m;

3. Diversion tunnel exit slope project

The downstream side of the Ramm ditch on the exit slope of the diversion tunnel is excavated to EL.1827, and the support construction starts; the excavation of the EL.1865.0m above the left revetment excavation area is completed;

4, diversion tunnel import and export dry period cofferdam project

The diversion tunnel entrance door is completed during the dry period of the cofferdam;

Main construction project

1. The construction of the approach road and the construction of the leveling of the slag yard of Jieyi Village are completed;

2. The construction of the temporary camp in Jieyi Village was initially completed, and the corresponding supporting living facilities were basically completed;

3. The construction and completion of the approach road of the temporary sand and gravel system and temporary mixing system of Wulonglong, the temporary installation system and the installation and commissioning of the temporary mixing system equipment have been completed, and the production capacity has been completed;

4. The construction of the entrance road of Wulonglong Permanent Mixing System is completed, and the slag portion of the field is partially completed;

5. The treatment of the dangerous source of Ram Valley was initially completed, and the water treatment of Ram Valley was partially completed;

6. The extension of the Fengshui Power Line and the follow-up construction of each construction operation surface are completed;

Looking back at the work done by the Production Management Department in safety production this year, there are mainly the following aspects:

First, in accordance with the overall construction schedule requirements, combined with the production planning requirements of the month, decompose and formulate the weekly production plan, actively analyze the factors affecting the production schedule, and formulate feasible solutions, while urging the coordination of various production plans to be successfully completed;

Second, presided over the weekly production meeting to coordinate and solve problems in the production process. Seriously complete the work of sporadic machinery and sporadic employment visas in the week;

Third, coordinate the management, use and deployment of public resources. Coordinate the direction of resource allocation according to the actual needs of the site, and prioritize key construction for key line key project projects to ensure the smooth completion of the overall construction period;

Fourth, conscientiously complete the construction log recording, collection and sorting, record and archive the construction memorabilia in detail, complete the collection and filing of construction affected materials, and provide production basis for the preparation of subsequent completion materials;

V. Do a good job in on-site civilized construction in accordance with the relevant provisions of the project department, assist the safety supervision department to complete the safety management work, assist the material department to complete the materials allocation and receiving work, and organize the comprehensive team to complete the auxiliary projects such as on-site Fengshui and other power projects;

6. Seriously complete other tasks arranged by the leadership of the project department;

The coming year is a crucial year for the C1 standard project of Wulonglong Hydropower Station, which is a challenging year for the entire Wulonglong Project Department. At present, the boundary conditions of the entire work area are extremely complicated, the construction environment has yet to be perfected, the interference factors are still many, the construction tasks are very heavy, and the overall construction period is quite tight. Faced with such a severe form, the next year's production management department will continue to fulfill the department's job responsibilities and focus on the following points:

First, increase the optimization of the overall construction period, and rationally arrange the weekly planning of the construction resources to be successfully completed;

2. According to the arrangement and completion of the sub-project, the critical degree of the line and the arrangement of the sub-factory team, the progress assessment method for the C1 standard project of Wulonglong Hydropower Station will be carried out, and the corresponding factory team will be rewarded and punished in this way. Promote production management;

Third, the key construction sites for the next year are: permanent mixing system construction, diversion tunnel import and export cofferdam project, diversion tunnel inlet excavation support, diversion tunnel body pouring, water intake tower concrete pouring, left bank abutment opening Excavation works, right bank abutment excavation works. In this regard, the production management department will focus resources on the key construction of the above key lines to ensure the smooth completion of key lines, and to ensure the normal over-flow of the diversion holes at the end of next year;

Fourth, continue to optimize the allocation of personnel in the department, continue to improve the ability of the department members to work, and continue to enhance the sense of responsibility of the department and collective cohesion;

The new year is coming, let us cheer up, strengthen our confidence, and strive for a good spirit and a solid work style. Overcoming many problems and difficulties faced in the early stage of the project, clarifying work ideas, promoting project construction, strengthening cost management, improving management system, and striving for the comprehensive and excellent completion of the 2019 work goal.