Summary of post-disaster reconstruction work of County Tourism Bureau
According to the overall arrangement of the county party committee and the government, the Tourism Bureau is responsible for part of the post-disaster reconstruction work in the township. Since the start of the post-disaster reconstruction project, the bureau has attached great importance to it, and timely invested human and material resources to fully support the reconstruction work. The leading employees took turns to help the site and participate in the reconstruction of the victims' homes. The summary of the reconstruction work is now as follows:
I. Reconstruction points and basic conditions of the households According to the overall arrangement of the ** township government, the SIPO and other insurance departments are responsible for the post-disaster reconstruction of Hongkou Village.
** Hongkou is 25 kilometers away from the original government township. It is located in an alpine mountainous area with a bad climate, inconvenient transportation, lack of water, power shortage, and poor communication. There are 54 villagers in the village, all of which are Miao nationality. Due to the influence of climate and altitude, local farmers are widely harvested and eaten by the sky. There is no fixed economic income and life is very difficult.
The basic situation of the five villagers covered by our bureau:
***: 5 people, 2 laborers, 1 migrant worker.
***: 6 people, 2 laborers, 1 migrant worker.
***: 5 people, 3 laborers, 2 migrant workers.
***: 5 people, 2 laborers.
***: 5 people, 2 laborers.
Second, the situation of the construction of our bureau initially started the post-disaster reconstruction, the task that the township gave us arranged in the old house of Xinglong Village. The staff of our bureau went to the township in mid-July to carry out preparatory work for post-disaster recovery and reconstruction. Our bureau has inspected the topography of the old housing estates, learned about the local disaster situation, mastered the basic situation of several disaster victims in our bureau, and formulated a feasible reconstruction plan. The unit workers donated 1,200 yuan to the disaster-stricken people of the old housing estates to start the funds in advance, so that they can prepare sandstone materials, bricks and other building materials in advance.
Two weeks later, the reconstruction of the old housing base was basically completed. According to the needs of the work, the township government transferred the bureau to Hongkou and other supporting departments to take charge of the reconstruction work of Hongkou. Our bureau obeyed the arrangement and transferred to the Hongkou line.
After arriving at Hongkou, the staff of the bureau visited the location of the Hongkou reconstruction point and learned the basic situation of the villagers. The climate was harsh for Hongkou and the traffic was inconvenient. The villagers are very poor and the labor force is seriously insufficient. The reconstruction plan has been formulated: the Tourism Bureau cooperates with other insurance departments and the local government, and coordinates the relationship in a small and indifferent manner, striving to be on August 10th. On the 15th, the 54 households in Hongkou were rebuilt to rebuild most of the reconstructed materials in the farm. From August 15th to 31st, the technicians and labor force were rationally arranged to overcome all difficulties and complete the main project of the 54 houses. September 1st - 25th , to complete the interior and exterior decoration and capping work of the house. From the 25th to the 30th, we will meet the superiors' acceptance and organize the victims to move.
The farmers in Hongkou are very poor and have insufficient labor. They are unable to provide sufficient labor and solve the costs associated with secondary transportation. In order to ensure the smooth progress of the project, the Tourism Bureau and other package departments have raised funds from various channels to solve the difficulties in the village of Hongkou. The employees of our bureau donated another 1,000 yuan, and the unit invested 10,000 yuan, of which 6,000 yuan was used for the local two-base work, and 4,000 yuan was used for the local villagers to solve the practical difficulties in the reconstruction work.
3. The bureau attaches great importance to the post-disaster reconstruction and reconstruction project. Since the launch of the post-disaster reconstruction work, the deputy director of the Bureau has visited the Hongkou line and has been on the scene to supervise and participate in this work. Deputy Director Chen has been in Hongkou from the beginning of August to August 26. The villagers tried their best to find ways to overcome the difficulties of bad weather and inconvenient transportation. They contacted the villagers to buy sand-blasting machines, diesel, brick and sand, sand and gravel materials, asked the villagers to work, find horsemen, and Liu Xiangxiang, the township government. Together, they used their own private cars to transport materials to the public. On the 26th, the materials needed for the reconstruction of 54 households in Hongkou were basically in place, and the wall support was basically over. After 26 days, due to the needs of the new rural construction, Deputy Director Chen Bo was drawn to Huanghua, and another staff member Hu Yong and Yang Taihua went to Hongkou to continue the task of assisting the unit.
Director Gao Li and deputy director Xie Dan led the staff to the reconstruction site to urge the inspection twice a week to send care and love to the victims. The leaders of the bureau lead the overall workforce, coordinate the relations between the parties, and solve the practical difficulties in the post-disaster reconstruction work through multiple channels, and provide comprehensive services for the reconstruction work.
Due to the high priority of the leaders, the effective measures and the effective performance of the front-line personnel, the task of the household package and the reconstruction of the entire Hongkou house have completed the main project on August 31. At present, three of the five households in charge of the bureau have completed interior and exterior renovations and leveling the ground, and are nailing the donkeys. The other two are nailing the donkeys. The progress of the entire Hongkou is consistent. It is expected that all the procedures for rebuilding the house after the disaster will be completed by the 25th, which will ensure that the victims will move into the new home by the 30th.
IV. Difficulties in Reconstruction The Hongkou is restricted by climate, transportation, communication, electricity, etc., and the villagers are very poor. There are many difficulties:
1. The road is clear and rainy.
2. The second transportation cost and labor cost are quite high, and the villagers cannot afford it, causing the progress to be affected;
3. The two reconstruction points of Xiahongkou are nearly 1 km apart, 29 households share the technicians at two points, and the technicians are both at the same time, and they are also unable to do so;
4. Due to lack of electricity in Hongkou, it can only work during the day, and it is impossible to work overtime at night. In addition, it has entered the rainy season, and sometimes it can't work for several days, and the progress cannot be accelerated.
V. The next step is to ensure the smooth completion of the post-disaster recovery and reconstruction tasks arranged by the county party committee and the government. The bureau held a general home-worker meeting today. At the meeting, Director Gao Li informed the completion of the work of the household and the difficulties encountered in the reconstruction work. The Secretary stressed that as always, the post-disaster reconstruction work should be taken as the top priority of the overall work in the overall situation, and the whole situation should work together to rebuild the final battle of the post-disaster reconstruction. Agree on the overall situation, pay close attention to the situation of the reconstruction point, and go all out to do the rear support and logistics work. If due to lack of weather and technical strength, etc., the task of rebuilding the package of our bureau cannot be completed according to the plan. The staff of the bureau will pay for the money, and all the staff will be dispatched to help the victims complete the unfinished construction tasks and do everything possible to complete the work by the 25th. Housing construction.
I. Reconstruction points and basic conditions of the households According to the overall arrangement of the ** township government, the SIPO and other insurance departments are responsible for the post-disaster reconstruction of Hongkou Village.
** Hongkou is 25 kilometers away from the original government township. It is located in an alpine mountainous area with a bad climate, inconvenient transportation, lack of water, power shortage, and poor communication. There are 54 villagers in the village, all of which are Miao nationality. Due to the influence of climate and altitude, local farmers are widely harvested and eaten by the sky. There is no fixed economic income and life is very difficult.
The basic situation of the five villagers covered by our bureau:
***: 5 people, 2 laborers, 1 migrant worker.
***: 6 people, 2 laborers, 1 migrant worker.
***: 5 people, 3 laborers, 2 migrant workers.
***: 5 people, 2 laborers.
***: 5 people, 2 laborers.
Second, the situation of the construction of our bureau initially started the post-disaster reconstruction, the task that the township gave us arranged in the old house of Xinglong Village. The staff of our bureau went to the township in mid-July to carry out preparatory work for post-disaster recovery and reconstruction. Our bureau has inspected the topography of the old housing estates, learned about the local disaster situation, mastered the basic situation of several disaster victims in our bureau, and formulated a feasible reconstruction plan. The unit workers donated 1,200 yuan to the disaster-stricken people of the old housing estates to start the funds in advance, so that they can prepare sandstone materials, bricks and other building materials in advance.
Two weeks later, the reconstruction of the old housing base was basically completed. According to the needs of the work, the township government transferred the bureau to Hongkou and other supporting departments to take charge of the reconstruction work of Hongkou. Our bureau obeyed the arrangement and transferred to the Hongkou line.
After arriving at Hongkou, the staff of the bureau visited the location of the Hongkou reconstruction point and learned the basic situation of the villagers. The climate was harsh for Hongkou and the traffic was inconvenient. The villagers are very poor and the labor force is seriously insufficient. The reconstruction plan has been formulated: the Tourism Bureau cooperates with other insurance departments and the local government, and coordinates the relationship in a small and indifferent manner, striving to be on August 10th. On the 15th, the 54 households in Hongkou were rebuilt to rebuild most of the reconstructed materials in the farm. From August 15th to 31st, the technicians and labor force were rationally arranged to overcome all difficulties and complete the main project of the 54 houses. September 1st - 25th , to complete the interior and exterior decoration and capping work of the house. From the 25th to the 30th, we will meet the superiors' acceptance and organize the victims to move.
The farmers in Hongkou are very poor and have insufficient labor. They are unable to provide sufficient labor and solve the costs associated with secondary transportation. In order to ensure the smooth progress of the project, the Tourism Bureau and other package departments have raised funds from various channels to solve the difficulties in the village of Hongkou. The employees of our bureau donated another 1,000 yuan, and the unit invested 10,000 yuan, of which 6,000 yuan was used for the local two-base work, and 4,000 yuan was used for the local villagers to solve the practical difficulties in the reconstruction work.
3. The bureau attaches great importance to the post-disaster reconstruction and reconstruction project. Since the launch of the post-disaster reconstruction work, the deputy director of the Bureau has visited the Hongkou line and has been on the scene to supervise and participate in this work. Deputy Director Chen has been in Hongkou from the beginning of August to August 26. The villagers tried their best to find ways to overcome the difficulties of bad weather and inconvenient transportation. They contacted the villagers to buy sand-blasting machines, diesel, brick and sand, sand and gravel materials, asked the villagers to work, find horsemen, and Liu Xiangxiang, the township government. Together, they used their own private cars to transport materials to the public. On the 26th, the materials needed for the reconstruction of 54 households in Hongkou were basically in place, and the wall support was basically over. After 26 days, due to the needs of the new rural construction, Deputy Director Chen Bo was drawn to Huanghua, and another staff member Hu Yong and Yang Taihua went to Hongkou to continue the task of assisting the unit.
Director Gao Li and deputy director Xie Dan led the staff to the reconstruction site to urge the inspection twice a week to send care and love to the victims. The leaders of the bureau lead the overall workforce, coordinate the relations between the parties, and solve the practical difficulties in the post-disaster reconstruction work through multiple channels, and provide comprehensive services for the reconstruction work.
Due to the high priority of the leaders, the effective measures and the effective performance of the front-line personnel, the task of the household package and the reconstruction of the entire Hongkou house have completed the main project on August 31. At present, three of the five households in charge of the bureau have completed interior and exterior renovations and leveling the ground, and are nailing the donkeys. The other two are nailing the donkeys. The progress of the entire Hongkou is consistent. It is expected that all the procedures for rebuilding the house after the disaster will be completed by the 25th, which will ensure that the victims will move into the new home by the 30th.
IV. Difficulties in Reconstruction The Hongkou is restricted by climate, transportation, communication, electricity, etc., and the villagers are very poor. There are many difficulties:
1. The road is clear and rainy.
2. The second transportation cost and labor cost are quite high, and the villagers cannot afford it, causing the progress to be affected;
3. The two reconstruction points of Xiahongkou are nearly 1 km apart, 29 households share the technicians at two points, and the technicians are both at the same time, and they are also unable to do so;
4. Due to lack of electricity in Hongkou, it can only work during the day, and it is impossible to work overtime at night. In addition, it has entered the rainy season, and sometimes it can't work for several days, and the progress cannot be accelerated.
V. The next step is to ensure the smooth completion of the post-disaster recovery and reconstruction tasks arranged by the county party committee and the government. The bureau held a general home-worker meeting today. At the meeting, Director Gao Li informed the completion of the work of the household and the difficulties encountered in the reconstruction work. The Secretary stressed that as always, the post-disaster reconstruction work should be taken as the top priority of the overall work in the overall situation, and the whole situation should work together to rebuild the final battle of the post-disaster reconstruction. Agree on the overall situation, pay close attention to the situation of the reconstruction point, and go all out to do the rear support and logistics work. If due to lack of weather and technical strength, etc., the task of rebuilding the package of our bureau cannot be completed according to the plan. The staff of the bureau will pay for the money, and all the staff will be dispatched to help the victims complete the unfinished construction tasks and do everything possible to complete the work by the 25th. Housing construction.
recommended article
- County Bureau of Commerce in-depth study and practice of scientific development concept
- Summary of the work of leading cadres of the legal system
- Summary of the annual work of law enforcement according to law
- Construction Environmental Protection Bureau work summary
- Summary of the work of the deputy chief of the street and work in 2019
- Summary of the special rectification work of county fertilizer quality
- Create a safe production demonstration township summary report
- 2019 township economic affairs service center work
- Summary of the work of the State-owned Assets Supervision and Administration Commission
- Food and Drug Administration Medical Device Special
- City Statistics Bureau study practice activities analysis check order
- Summary of the development work of credit unions in 2019
popular articles
- Taizai’s famous sayings
- Summary of personal work of the post office in 2019
- Korean swear words
- The latest high school inspirational maxim
- 2014 is very touching words
- English famous words
- Summary of new rural construction work
- Tao Xingzhi's famous sayings
- Injured sentence
- 2014 civilized unit creation summary
- Sad love sentence 2019
- Summary of the Party's Work Style and Clean Government Construction in 2019
- Summary of the work of letters and visits in 2019
- College entrance examination inspirational quotes
- Bing Xin’s famous words
- Summary of the comprehensive management work in 2019
- Report on the Democratic Life of Party Members in October 2019
- Summary of county discipline inspection work in 2019
- Summary of discipline inspection and supervision work in 2019
- Teacher's famous saying
- Qq space mood phrase
- Strong words
- Summary of the work of the Association for Science and Technology in 2019
- Classical life motto
- I want to say something to the teacher.
- Describe the fast time sentence 2019
- Thanks to the friend's words 2019
- a good saying that loves labor
- Deaf people jingle 2019
- Du Yuexi's famous sayings