Work Summary > Unit Work Summary

Summary of the work of township water station


Over the past year, under the leadership of the township party committee and government, under the guidance and support of the higher authorities, and in the spirit of serving the people, we have carefully organized and emancipated the mind, deepened reform, expanded openness, and scientific development. "The big discussion activities, the implementation of the party's policies, guidelines, lines and the spirit of the party's xx conference, resolutely implement the "Water Law", "Water and Soil Conservation Law", "Poverty Protection Law" and other laws and regulations, and increase the publicity work, Seriously study the level of theoretical and cultural, constantly improve their moral quality and business level, adhere to the people-oriented, and firmly establish a scientific development concept. The water work of the township has a plan to carry out key and orderly development. With the continuous increase of the construction of farmland water conservancy infrastructure, the degree of water conservancy in our township has been continuously improved, and the production and living conditions of agriculture and rural areas have been continuously improved, and rural drinking water has been solved year by year. Safety issues, the solution to the problem of rural drinking water safety and drought and flood control in the first place in water work, closely surrounding the development ideas of socialist economic and social development and the objectives and tasks of water conservancy construction pointed out by the "xxx" plan, implementing various work measures, work performance With a certain improvement, the work of my station throughout the year is briefly described as follows:
First, the main project construction
1. After more than one year, the car sand dam, which invested more than 600,000 yuan, was completed and accepted in May and delivered to our hometown. On September 20 this year, the water storage test run was approved by the competent department of higher authorities. After the flooding, the spillway has been drained, and all economic and social benefits will be exerted next year.
2. After the implementation of the second batch of national debt drinking water safety projects in XX, 10 project sites in 2 administrative villages in the township, the project invested more than 500,000 yuan to solve the problem of drinking water difficulties for 2,621 large livestock.
3. Completed the risk-reduction work of the Xixiang Canal of the Naxian Reservoir with an investment of more than 200,000 yuan and a length of 2.45 kilometers. This project solved the irrigation water for farmland irrigation and economic crops of the seven villager groups in Naxian Village.
4. The first batch of drinking water safety projects in XX was launched, namely 5 project sites in Xintang Village. The drinking water project of Gaocun Group, one of the five project sites, has been basically completed, and the other four project sites are under construction.
5. The implementation of the Banjiatan Tanjiazhai and Xujiazhai human and animal drinking water projects was completed. The main line of the erection was 450 meters, the branch line was 4225 meters, and the total supply pool was 2 40 cubic meters. The settlement of 2 village groups was 75 households, 396 , 258 large livestock husbands have difficulty drinking water.
6. Organize the implementation of the human and animal drinking project of Jingping Village Haoyi Group I and Group II with an investment of 50,000 yuan.
7. Completed the replacement and maintenance of the hoistway reservoir's lifting and closing equipment and steel ropes.
Second, the main work situation
1. Seriously publicize the laws and regulations such as the Water Law, the Soil and Water Conservation Law, and the Flood Control Law, and adjust various water disputes.
2. Plan the reporting of all kinds of “five small” water conservancy projects and reserve projects, and do a good job in reporting statistics on various statistical data.
3. Assisting the township party committee and government to do well in the water conservancy planning of the tobacco area, and successfully completed the tasks assigned by the township party committee government and the higher authorities.
4. Grasp the work of safety production. The work of safety production is related to the safety of life and property of the country and the people, the safety management of construction in progress, the improvement of various safety systems and measures, and the awareness of safety concerns throughout the work and production.
5. Increase the propaganda of the reform of the water pipe system, and take the opportunity of setting up WUAs to accelerate the pace of reform of the water property rights system.
III. Basic construction of farmland water conservancy In the spring and spring, our town plans to start 110 water conservancy projects, including 70 water damage repairs and 70 new ones, which have been completed according to the plan, with an additional irrigated area of ​​0.06 million mu. , transforming medium and low-yield fields by 0.02 million mu. It solved 2,557 people's drinking water difficulties and 750 large livestock, completed the construction of the car sand dam, and delivered it to our hometown through acceptance; completed the 2.45-kilometer reinforcement project of the Xixiang Canal of the Xianxian Reservoir, adding that The irrigated area of ​​the Xian Reservoir has improved the utilization efficiency of the reservoir.
4. Since the flood prevention work has been in its flood season, our township has set up a flood prevention leading group and an emergency rescue team in time to clarify the administrative leadership responsible for each reservoir dam pond, technical responsibility and post responsibility, and reported the naval reservoir and the kiln reservoir. The plan for the planning of the ferry, the preparation of a rescue emergency plan for a warehouse, the organization of training emergency teams, the implementation of emergency measures and materials, the implementation of the 24-hour duty system and the mobile phone on duty for 24 hours in communication, and the reservoir After the establishment of the flood prevention leadership team, the organization organized personnel to conduct regular or irregular comprehensive inspections of the water project facilities of the township and the dam body, culvert and spillway opening and closing facilities of the reservoir, eliminating various hidden dangers. It has ensured that all types of water projects will be safely transported during the flood season, and at the same time, the water storage tasks issued by the competent departments of superiors have been completed, so that flood control and water storage can be ensured, and irrigation water for farmland downstream of the reservoir will be ensured next year.
Township Water Station November 29, 2008