Summary of workshop work in 2019


In the midst of busy work, the 2010 year is coming to an end, and it has ushered in the annual annual summary. In the past year, with the care and support of the workshop leaders and colleagues, through their own efforts, I have achieved certain results in my work, but there are also many shortcomings. Looking back over the past year, I have been actively pursuing the work of workshop leadership and team arrangement in line with the goal of “responsibility is more important than ability”. The task is summarized as follows:

First, the main work done and the completion of the indicator tasks

1. Since I was transferred to the maintenance workshop in January this year, I have earnestly studied and constantly strengthened my own hands-on and brain-braining ability, and paid attention to the accumulation of some detailed knowledge. For example, the splitting of the previous time was often impossible to cut when cutting the thick plate. Occurred, which brought a big impact to the production. After the analysis of the relevant personnel, it was found that when the splitting knife and the lower knife were cut, there was no overlap between the upper and lower blades, which led to the cutting of the thick split plate. There is a phenomenon that can't be opened, so the splitting shear is arranged in the assembly process of the blade, and the height of the 2mm spacer is increased on the basis of the height of the original upper knife to increase the overlap of the upper and lower blades when cutting. After a period of production observation, there has never been a situation in which the split plate cannot be opened.

2. Carefully arrange each of the daily repairs, Zhou Xiu, Yue Xiu and other maintenance tasks, and implement the confirmation of the various equipment problems for the production class feedback, and make good use of the system of one class and three inspections every day. The equipment in the production area understands the operation of the equipment, arranges the maintenance and repair of the equipment with hidden dangers in time, and prompts the rectification and rectification. Through the efforts of the monthly failure time, the inspection time has not broken through the regulations issued by the workshop, and the quality of the inspection The completion rate is 100% every month. At the same time of repairing and repairing, we also actively organize all the tongs to grasp the management of civilized hygiene in the area where the package is located, so that the roads on the production site are clean and smooth, and the equipment body is clean. Oil pollution, there is no dead angle on the corner of the basement hydraulic station, and the monthly health flag rating has not been evaluated once.

3. Carry out the implementation and implementation of the auxiliary work. In the third quarter, due to the production needs, the maintenance site of the 7# door should be relocated to the spare room after the 5# electrical room, and it needs to be based on the original site. Laying refractory bricks and adding additional material cutting sites for steel pipe plants. In the face of large workload and small number of tasks, the staff are reasonably arranged to carry out some overtime work and complete the task of workshop layout in advance within the prescribed time. At the same time as the work is carried out, the relevant regulations on free research issues issued by the general factory are communicated, and the relevant personnel are carefully organized to report on the topics in the free research projects in September and October, and also participate in related topics. Some of the research work.

4. Prepare for overhaul. As the overhaul work is carried out in December of this year, although there is still a period of time from overhaul, it must not be underestimated this year's overhaul. This year's overhaul and finishing of ground machinery and equipment has totaled 92 items. Items, including 2#3# cold bed project 22, 1# repairing table project 9 items, fire cutting machine project 9 items, cutting head shearing item 12 items, combined cutting project item 20 items, fixed length cutting item 11 items, cold There are 9 items in the project, among which there are many projects that need to formulate the construction plan for the overhaul project. After organizing the division of relevant personnel, I participated in the formulation of the construction plan for the overhaul project of the cut line. Among them, 5 construction plans have been formulated, respectively. Ruler shearing arm expansion sleeve replacement construction scheme 2 Bilateral shearing width adjustment gearbox replacement construction scheme 3 Bilateral shearing outlet up and down feeding roller replacement construction scheme 4 cutting head shearing swinging roller first bevel gearbox bearing replacement construction scheme 5 The construction plan for the replacement of the double-cutter fixed side turret back-cylinder bearing, while doing the above preparations for overhaul, also strengthen the finishing work of overhaul spare parts, some on the scene The spare parts materials and screw nuts are used for inventory estimation. It is sufficient to count some existing spare parts materials. For some spare parts, it is necessary to take the time to use the remaining time to make plans and make up, in short, overhaul work. All the previous situations should be considered as much as possible.

two. What are the problems and deficiencies?

1. There are still some shortcomings in the management of the team. For example, in the number of performance appraisal questions of the team leader in the second quarter, the general factory found that the team had violated labor discipline and violations, but the number of performance evaluation questions of the team leader in the second quarter. Failure to complete performance appraisal problems

2, for some high-standard maintenance is not enough attention, such as some parts removed during maintenance need to be cleaned with cleaning agent, did not clean according to the standard requirements, just use the cloth to get it done, not enough attention, and in the disassembly Some oily parts need to be temporarily placed on the ground, not covered with colored strips or plastic paper, and the paint on the floor of the workshop is all oily.

3. The dynamic understanding of the personnel's mind is not timely enough. Since this year, the group has left 6 people, and most of them are college graduates. Their departure also has a certain impact on the work schedule.

4. In the troubleshooting of some equipment, in order to communicate with the leader in time, there is confidence in yourself that the overtime phenomenon sometimes occurs in the maintenance.

three. The direction, goals and improvement measures for the next step of improvement

1. Seriously play a good role in the management of the team, and seriously deal with all kinds of problems that violate the labor discipline and violations exposed by the team.

2. In the future maintenance work, we must pay attention to the standard requirements for maintenance, and resolutely use high standards and high requirements to demand ourselves, so that we can constantly improve ourselves in our work.

3. Be familiar with the ideological dynamics and special strengths of the team members at all times. It is necessary to set up a long-term collective goal for the team members to transform some of the resistance of the team members. For those who have special skills, they should actively give them room for development.

4. If you can't solve it yourself, you should communicate with the leader in time. Don't trust yourself and bring some passive effects to the maintenance.

5. Further refinement of the annual overhaul work, as well as the procurement of procurement parts, fully prepared for overhaul work

6. The new year means new starting points, new opportunities and new challenges. In the next work, I will continue to work hard, study hard, constantly improve my work standards, and strive to complete various tasks efficiently. To make your ideological consciousness and work efficiency fully enter a new level, open up a new situation, and make greater contributions to the workshop for the team.