Gas pipeline engineering installation contract
Contract number: _________
Party A: _________
Party B: _________
In accordance with the "Contract Law of the People's Republic of China", "Construction Law of the People's Republic of China" and relevant legal counsel, administrative regulations, and in accordance with the principles of equality, voluntariness, fairness and good faith, both parties have reached this agreement on the construction of this construction project. .
The first project overview
Project Name: _________ City _________ Street _________ Gasification Station and Pipeline Gas Supply Project.
Project location: _________ City _________ Street.
Project scope and content: _________ Gasification station: _________ Street kitchen pipes, pressure regulators, flow and other materials.
The project cost is: _________ yuan.
Second project deadline
Contract period: According to the quota of the period of time promulgated by the state, the date of commencement and completion of the contract project is agreed.
Both parties have agreed to complete the work from _________ years _________ months _________ days to _________ years _________ months _________ days.
Article 3 Material Supply
1. The raw materials required for this installation project shall be supplied by Party B as listed in the project budget.
2. The installation materials provided by Party B shall comply with national standards.
Article 4 Project settlement method
1. After Party A and Party B formally sign the contract, Party A shall pay Party _________% of the total project cost to Party B within _________ days. If Party A fails to pay according to the contract, the construction period will naturally be postponed.
2. When Party B receives the advance payment from Party A, it will officially enter the installation site within _________ days.
3. After completion, Party A shall pay the remaining _________% to Party B on _________ days, and the remaining _________% shall be paid in _________ months after the project is used. If the project has not foreseen the project or the change, the project cost settlement will be calculated according to the actual amount and paid in one lump sum.
4. Payment method: payment by bank transfer, money order or cash.
Article 5 Project Acceptance
1. After Party B is completed, Party B shall be responsible for the testing and debugging of the entire project system. The trial period is _________ days, and Party A and Party B shall check the results of the project trial test.
2. After the project is delivered for use, Party A shall use _________ days normally and shall be deemed to be accepted by Party A.
Article 6 Warranty Maintenance
Party B shall provide maintenance and maintenance services for the gas supply system. The warranty period shall be implemented in accordance with the relevant provisions of the State Council Decree No. 279 “Regulations on Construction Project Management”. Namely: the maintenance of non-human damage of equipment and materials within two years, Party B provides free and free service; after two years, it is paid service.
Article 7 The files that make up the contract
The files of the group cost contract include: drawings, engineering materials tables, budget books, written agreements or simple changes between the two parties, and written agreements are considered as part of this contract.
Article 8 Party A's Commitment and Guarantee
1. It is a limited liability company established and validly existing in accordance with the law;
2. It has the right to conduct transactions under this Agreement and has taken all necessary corporate actions to authorize the signing and performance of this Agreement;
Third, it guarantees the completion of the three-way and one-level work of the project, ensuring that the water source and power supply will reach the master list of the agreed site at the construction site, and bear the water and electricity costs caused by the construction;
4. This Agreement shall constitute a binding obligation on the date of its signature.
Article 9 Party B's Commitment and Guarantee
1. It is a limited liability company established and validly existing in accordance with the law;
2. It has the right to conduct transactions under this Agreement and has taken all necessary corporate and legal actions to authorize the performance and performance of this Agreement;
Third, to ensure that in the construction process, in line with the purpose of safety first, if there is a safety accident and a work-related accident that jeopardizes itself and others due to Party B, Party B shall bear all expenses and responsibilities;
4. Commit to carry out construction and completion according to the contract, and assume the responsibility of engineering quality warranty during the quality warranty period;
5. This Agreement shall constitute a binding obligation on the date of its signature.
Article 10 Liability for breach of contract
1. Party A shall pay the money on time. If the time limit is exceeded, Party A shall pay _________% of the liquidated damages. And Party B has the right to terminate the system operation.
2. If Party B fails to deliver the goods within the time limit stipulated in the contract, it shall be compensated for the double of the payment made by Party A.
Third, due to Party A's reasons for the suspension of construction or slow construction, measures should be taken to make up or reduce losses. At the same time, the compensation for Party B caused the actual loss of work stoppage, work, rework, personnel and mechanical equipment transfer, material and component backlog.
Article 11 Confidentiality
One party shall be obliged to keep confidential the business secrets of the other party that is known as a result of this agreement, and shall not disclose it to other relevant third parties, except as otherwise provided by current Chinese laws and regulations or with the written consent of the other party.
Article 12 Supplements and Changes
This Agreement may be modified or supplemented in writing in accordance with the opinions of the parties, and the resulting supplemental agreement shall have the same legal effect as the Agreement.
Article 13 Force Majeure
In the event that any party fails to perform this Agreement in whole or in part due to force majeure, or delays in the performance of this Agreement, the event shall be notified to the other party in writing within three days from the date of the event of force majeure, and within 30 days from the date of the event. Submit to the other party a certificate that causes all or part of it to be unfulfilled or delayed.
Article 14: Settlement of disputes
In the event of a dispute between the parties to this Agreement concerning the interpretation or performance of the relevant provisions of this Agreement, they shall be settled through friendly negotiation. If no written agreement is reached through negotiation, either party has the right to file a lawsuit in a people's court with jurisdiction.
Article 15 Priority
In order to facilitate the maintenance after the completion of the project, Party B will become the preferred gas supplier after the completion of the project.
Article 16 Others
1. This Agreement shall enter into force on the date on which the legal representatives of the parties or their authorized agents sign and affix their official seals.
2. The contract shall be in duplicate, and Party A and Party B shall each hold one copy and have the same legal effect.
person A person B:_________
Legal representative: _________ Legal representative: ______
_________ year ____ month _ day _________ year ____ month ____ day
Place of signing: _________ Signing location: _________
recommended article
- Computer maintenance agreement
- Mud painting contract
- Lighter processing installation contract
- Contract
- Jingmen City residential decoration and construction project construction contract
- Parking contract
- Maintenance contract
- Contract (including transportation)
- Car maintenance contract
- International tanker charter contract
- LOGO Design Registration Agreement
- House demolition entrustment contract
popular articles
- 2014 is very touching words
- Strong words
- Pump repair contract
- About building a ship contract
- I want to say something to the teacher.
- Deaf people jingle 2019
- Repair repair contract
- Sample of the processing agreement (light industry)
- Korean swear words
- College entrance examination inspirational quotes
- Injured sentence
- Taizai’s famous sayings
- Qq space mood phrase
- Processing contract model
- Thanks to the friend's words 2019
- Construction and installation engineering construction contract
- Tao Xingzhi's famous sayings
- Bing Xin’s famous words
- Print production contract
- Commissioned production contract model
- a good saying that loves labor
- Describe the fast time sentence 2019
- Sad love sentence 2019
- Decoration contract demonstration text
- Contract
- Du Yuexi's famous sayings
- Teacher's famous saying
- Classical life motto
- The latest high school inspirational maxim
- English famous words