Construction Contract of Jingmen City Residential Decoration Project (2008 Edition)
Contract number: _________
Employer: _____________________ ID number: ______________
contact address:_______________________________________________
Phone: 1_______________2____________ Mobile: ____________________
Contractor:_________________________________________________
Company headquarters address: ___________________________________________________
Legal representative: _________________________ Phone: ____________________
Legal person business license number: ________________________ Qualification number: ________________
Branch address: ________________________________________________
Business license number: ____________________________ Phone: ____________________
Person in charge: _____________ Title: _________ Phone: ____________________
Signing agent: _________________________ Phone: ____________________
Engineering representative: ___________ Phone: ____________________
In accordance with the "Contract Law of the People's Republic of China", "Building Law of the People's Republic of China", "Regulations on the Quality Management of Construction Projects", "Regulations on the Supervision of the Contract of Hubei Province", Decree No. 110 of the Ministry of Construction, "Administrative Measures for Residential Interior Decoration" and other relevant laws The regulations, combined with the characteristics of the construction of the home improvement project, have been signed by the two parties.
I. Project Overview
1. Project address:________________________________________________.
2. construction area:_______________.
3. Unit type: ______ room ______ hall ______wei, flat level □, or split level □, or double □, or villa □.
4. Contracting method: Both parties agree to use the following ______ methods to contract:
1 Party B's contract work, package auxiliary construction materials, package all main materials □ or part of the main materials □.
2 Party B shall provide labor and package auxiliary construction materials, and Party A shall provide the main materials.
3 other ways ______________________________.
5. Construction content:
6. Construction date: ________ years _____ months _____ days to ____ years ____ months _____ days.
7. The contract amount: ______________________ yuan. After completion, it will be settled according to the actual settlement □;
8. Payment method: After the contract is signed, Party A shall prepay ________ yuan in the first phase according to the contract _____%; concealed works such as hydropower and mid-term acceptance shall pay _________ yuan according to the contract _____%; within _____ days after the completion of project acceptance Pay the final payment __________ yuan.
9. When Party A pays the deposit, prepayment, construction cost and other funds to Party B, Party B shall be required to provide the receipt or invoice with Party B's “Finance Special Chapter”.
Second, the construction drawings
The two parties agreed to submit the construction drawings in the following _____ ways
1. Party A shall design and provide construction drawings, and the drawings shall be in duplicate, one for each party.
2. Party A entrusts Party B to design the construction drawings. The drawings are in duplicate and one for each party. Design fee _______________ yuan. .
Third, Party A's work
1. If Party A designs it by itself, it shall provide Party B with the confirmed construction drawings and construction instructions before the commencement of construction, and conduct on-site delivery.
2. Review and determine the construction drawings, construction instructions and project quotations designed by Party B, signed and approved by both parties.
3. Before the start of construction, the conditions for the construction of Party B's entrance will be created, including moving the indoor furniture and furnishings, and returning them to cover and covering them, so as not to affect the construction.
4. Provide water and electricity required for construction; handle the relevant formalities involved in the construction.
5. Responsible for coordinating the relationship between the construction team and the neighborhood.
6. Timely supply of self-contained materials and equipment that meet the design requirements, have a certificate of conformity, and are produced by regular manufacturers.
7. Organize the quality of the project, the supervision of the construction schedule and the quality inspection of the concealed project, the medium-term and the completion phase.
Fourth, Party B's work
1. Strict implementation of construction regulations, safe operating procedures, fire protection and environmental protection regulations. The construction shall be carried out in strict accordance with the design drawings and construction instructions determined by both parties, and the renovation works shall be completed on schedule.
2. If it is designed by Party B, the construction drawings and construction instructions determined by both parties shall be provided to Party A before the commencement of construction, and the site shall be delivered.
3. During construction, the main body of the building or the load-bearing structure, HVAC and gas facilities shall not be demolished. If it is necessary to be demolished, Party A shall go through the relevant examination and approval procedures with the relevant departments.
4. Ensure the quality of the decoration, especially the quality of concealed works such as water and electricity, and prevent leakage and blockage. During the decoration period and during the warranty period, if there is any quality problem caused by the construction, it is responsible for the rework and repair, and Party B is responsible for the expenses.
5. Comply with the regulations of the relevant departments on the construction site management, do a good job of on-site safety and enclosing work, handle the problem of construction disturbance and the relationship with the four neighbors.
6. Protect the furniture and furnishings in the original living room, ensure the cleanliness of the construction site, and be responsible for stacking the garbage.
7. Organize the self-inspection of project quality, and cooperate with Party A to do the acceptance of concealed works, medium-term and completion stages.
V. Engineering supervision
The project is supervised by the project. Party A entrusts _______________ the supervision company to supervise the project, and Party A pays the supervision fee by itself.
Sixth, construction period
1. Party B shall complete the entire project according to the contract period, and shall not delay the construction period without reason. Except for Party A's change of design plan and the reason of shutdown due to power outage, water stoppage and force majeure factors, etc., the construction period shall be delayed by one day, and Party B shall reduce the contract amount. _______% of the proportion pays Party A liquidated damages.
2. Due to the reason of Party A’s stoppage, the construction period will be postponed. And for each day of work stoppage, Party A shall compensate Party B for the lost work fee according to the proportion of _________% of the contract amount.
3. If Party A increases the content of the project, after the written approval of both parties, the project will be extended according to the newly added project volume, and the expenses shall be negotiated and paid by Party A and Party B.
Seven, material supply
1. The materials and equipment purchased by Party A of this project shall be qualified products that meet the design requirements and regular manufacturers, and shall be supplied to the construction site on time. If it is caused by quality problems, differences in specifications or “three no” products, Party A shall bear the responsibility.
2. All materials and equipment supplied by Party B shall be provided to Party A with its brand, specifications, unit price, place of origin and product certification, and shall be used only after Party A's inspection. Otherwise, Party B shall be responsible for the losses caused.
Eight, engineering changes
1. If the project and construction method need to be changed, both parties shall agree to sign a written change agreement and adjust relevant project costs and schedule change orders);
2. If the project payment is not paid on time without any reason, the construction period will be postponed accordingly.
3. If Party A requests to change the design in the middle, affecting the materials purchased by Party B, the finished products or semi-finished products that have been customized, and the normal construction, and cannot be adjusted, the losses shall be borne by Party A.
Nine, project quality acceptance and warranty
1. The project is based on the construction drawings, construction instructions and design changes confirmed by both parties, and the quality acceptance criteria for the “Building Decoration Engineering Quality Acceptance Code” and “Residential Decoration Engineering Construction Specifications” are used as the standard for quality assessment; The Pollution Control Code is the standard for indoor environment compliance.
2. After the completion of concealed works such as water and electricity, Party A and Party B shall jointly conduct mid-term acceptance.
3. After the completion of the project, Party B shall notify Party A of the acceptance. Party A shall, after receiving the acceptance notice, participate in the acceptance and acceptance according to the notice time, and go through the formalities of acceptance and handover. .
4. In the concealed project and the mid-term acceptance process, Party B shall be responsible for the repair and bear the cost and construction period for the quality problems confirmed by Party A and Party B; Party B shall be responsible for the repair and bearment of the quality problems confirmed in the completion acceptance and re-appoint the repair period.
5. If the acceptance and delivery procedures are not completed, Party A shall use the house as the quality acceptance, and Party A shall be responsible for the consequences.
6. After the completion of the project, Party B shall be responsible for the warranty of the construction project and issue the “Engineering Warranty”. The warranty period shall be implemented in accordance with the relevant provisions of the “Regulations on the Quality Management of Construction Projects”.
X. Liability for breach of contract
1. Party A has not gone through the relevant procedures and has decided to demolish the structure of the house or the main pipe of gas meter, heating, water supply and drainage, and the losses and liabilities caused by Party A shall be borne by Party A.
2. Without the approval of the relevant departments, the relevant procedures have not been completed, and Party B has dismantled the house structure or the gas meter pipe, heating, water supply and drainage main pipelines without authorization, and the losses and liabilities caused by Party B shall be borne by Party B.
3. During the construction process, Party A did not negotiate with the principal responsible person of Party B, and asked the workers to change the construction contents without permission. Party A shall be responsible for the quality problems caused.
4. If the construction party violates the construction regulations, safety operation procedures, fire protection regulations, environmental protection regulations and other agreements between the two parties, Party B shall bear the responsibility for the losses caused by Party B itself and Party A.
5. If, for one reason, the contract cannot be performed and continues to be performed, the other party shall be notified in time to complete the contract termination procedure and compensate the other party for the economic losses caused thereby. If the contract termination procedure is not completed and the performance is suspended without authorization, the defaulting party shall bear the liquidated damages and compensate the other party for the economic losses caused. The liquidated damages shall be paid ______% of the contract amount.
XI. Dispute or dispute resolution
During the performance of this contract, disputes between the two parties shall be resolved through consultation and negotiation; if the parties fail to negotiate, Party A and Party B shall agree to resolve the issue by the _____ method:
1__________ Arbitration Commission Arbitration;
2 File a lawsuit in the people's court.
Twelve, other ___________________
XIII. Supplementary provisions
1. This contract is made in two copies, each party holds one copy and takes effect after being signed and sealed by both parties.
2. After the signing of this contract, the project may not be subcontracted, otherwise the contract will be invalid, and all losses caused by the contract shall be borne by the subcontractor.
3. The subordinated file of the contract is an effective part of the contract.
Subsidiary File 1: Supplementary Agreement;
Attached file 2: design, construction drawings, construction instructions;
Subsidiary File 3: Engineering Quotation;
Attachment File 4: Design Change Order;
Attachment File 5: Acceptance Form;
Attachment File 6: Party A provides a list of decoration materials;
Subsidiary File 7: Project Statement;
Subsidiary File 8: Engineering Warranty.
person A person B:_______________
Legal representative: _______________ Signing agent: _________________
Date of contract signing: _______________ year __________ month __________ day
recommended article
- Contract (including transportation)
- Computer maintenance agreement
- Contract
- LOGO Design Registration Agreement
- Maintenance contract
- Mud painting contract
- Jingmen City residential decoration and construction project construction contract
- International tanker charter contract
- Car maintenance contract
- Lighter processing installation contract
- House demolition entrustment contract
- Parking contract
popular articles
- The latest topic of chatting with girls
- Repair repair contract
- Philosophical words 2019
- Dedicated good words
- Sad sentence
- Boasting words 2019
- a famous saying that overcomes setbacks
- MacArthur's famous sayings
- Save your boyfriend's words
- 2014 encourages the words of a lost person
- English inspirational maxim
- Putin's famous sayings
- Common English sentences
- Decoration contract demonstration text
- Trusted quotes
- Lincoln's famous sayings
- Missing childhood sentences
- Contract
- Blessing Dad’s words
- About building a ship contract
- Say goodbye
- Print production contract
- Sample of the processing agreement (light industry)
- Construction and installation engineering construction contract
- Mandela’s famous words
- Pump repair contract
- Commissioned production contract model
- a good sentence for the motherland
- Processing contract model
- Funny quotes