Decoration contract demonstration text
[Renovation contract] Demonstration text of decoration contract, decoration application: The interior decoration of the owner's user must apply in writing to the business department of the building property management company 15 days before the decoration and submit the decoration plan. The renovation plan includes the following information:
1. The property management of the _________ building includes renovation management, which is undertaken by the ____________ property management company.
Second, the decoration application: The interior decoration of the owner's user must apply in writing to the business department of the building property management company 15 days before the decoration and submit the decoration plan. The renovation plan includes the following information:
Floor plan for decoration;
Decoration materials, such as ceiling, partition, floor and other materials;
Lighting system and power wiring diagram;
Water supply and drainage system requirements;
A central equipment system that requires new or changed;
Maintenance inspection of the location of the exit;
Ceiling plan design;
Elevated maps;
The design of the window and the signboard.
Third, approve the renovation plan
The property management company will reply within 7 days after receiving the decoration plan of the owner's user. For substandard or incomplete information, the owner's user shall modify it as required and resubmit it for approval.
Fourth, the decoration deposit is to ensure the cleaning of waste during the decoration, does not damage the building's shared equipment and facilities, does not violate the decoration management regulations, the owner's user's decoration must pay a certain amount of deposit, according to the gold standard according to the size of the renovation project, but each The minimum number of rooms is not less than _________ yuan. After the renovation project, the management company will confirm that there is no penalty, and the deposit will be refunded in full. If there is a penalty for compensation in the decoration project, the remainder of the claim shall be refunded to the owner of the owner; if the deposit is insufficient to cover all expenses, the management company has the right to recover the insufficient amount.
V. Decoration supervision fee and water and electricity fee
The owner of the building shall pay the decoration supervision fee to the management company for the fire safety, the protection of the site and equipment, the use of the elevator, public safety, site cleaning, construction supervision and other aspects. The standard of decoration supervision fee is equivalent to 5% of the total project cost of the final plan, and at least not less than 10 yuan square meter of building area. The cost of water and electricity incurred during the renovation period is paid by the owner.
Insurance
In order to prevent accidents caused by construction during the renovation period, the management company may require the owner to purchase insurance for the renovation project, including fire insurance and public liability insurance, depending on the renovation project.
7. Fire prevention person in charge
The owner of the owner shall designate the person in charge of the renovation and construction unit as the person responsible for the fire prevention and sign the fire safety responsibility letter.
Eight, decoration construction responsibility commitment
The owner's user must sign the decoration commitment letter of commitment before the decoration application is approved, and promise to abide by all the provisions listed in this decoration guide.
Nine, renovation and construction permit
According to the civil construction regulations, the owner of the owner will submit the renovation plan and pay the renovation fee. After signing the letter of commitment, the management company will issue a decoration permit to the owner.
10. After the decoration work begins, the owner user can apply for the construction personnel's entry permit, materials transportation, etc. after receiving the decoration permit, and the renovation project can begin.
XI, decoration acceptance
After the renovation project is completed, the owner of the owner shall notify the management company in writing of the acceptance. The management company checks whether the renovation project meets the requirements of the renovation plan, whether there is any violation of the decoration code during the construction, whether the fees have been paid, and so on. If there is no problem, the acceptance will be passed and the decoration deposit will be refunded.
Twelve, decoration code
The interior decoration of the owner's user must comply with the following regulations:
All fire, air conditioning, water supply and drainage and gas construction must be carried out by the construction unit designated by the management company. Please contact the management company to obtain a list of designated construction units.
The sprinkler system is generally not modified. In case of special circumstances, it must comply with the current fire protection design specifications. The management company collects the management fee for the construction work and requires it to be completed within a limited time.
All electrical appliances should be installed in accordance with the relevant regulations of the Municipal Power Supply Bureau. All wires must be protected in the galvanized pipe. Without the consent of the management company, the wires must not be directly embedded in any part of the building.
Except for the position of the light box provided by the building, the store logo or signage may not be installed at other locations. The design of the signboard must be approved by the management company.
Do not install speakers that are facing public corridors or that can cause harassment or impact to other merchants or customers.
All doors must not be opened and extended into general public areas, including corridors or elevator halls.
All renovations do not affect the appearance of the building, and the decoration does not protrude from the public corridor.
If you change the room, such as partitions, you can not affect the air conditioning return air.
Except for the approval of the management company, all internal partition walls shall be light weight and of the structure, and fireproof materials shall be used as far as possible to meet the fire protection requirements.
You cannot change any fire shutters.
All renovations or furniture cannot be placed above or below the fire shutter or block the fire shutter switch box or rail.
Fire passages, fire doors, emergency exit light boxes, fire hydrants cannot be blocked.
Can not block the return air of the air-conditioned room and the access and maintenance space into and out of the air-conditioned room.
The function and position of the smoke door and the glass door cannot be changed.
If the ceiling is not a ceiling, it should be inspected under each wind, every coil fan, every water pipe, every fire shutter motor and power box.
Do not punch or affix any type of facility to the glass curtain wall structure. All devices must not touch the structural components or any part of the curtain wall system. The interval between shops close to the curtain wall shall not be fixed on the curtain wall system.
The structural floor and the partition wall common to the adjacent shop shall not be dug, cut, cut or carved without the written approval of the management company.
The owner of the owner should obtain all relevant approvals from all local government departments before the construction, especially the relevant approval of the fire department.
The approval of any management company does not in any way represent the recognition of the technical parameters in the solution, and the management company does not guarantee the specification performance and effect of the equipment materials selected in the solution. The owner and the user are responsible for any consequences arising out of problems with the equipment and materials.
The owner of the owner shall be responsible for the situation after the completion of the wall covering. Even if the room is found to have air-conditioning ventilation or other systems affecting the operation of others or the overall system after completion of the approval plan, the management company may still order it to make corresponding amendments.
Before starting any construction, all the construction personnel's name, address and ID number must be submitted to the management company, and the changes must be added at any time to ensure accuracy.
All construction must be completed in strict accordance with the approved drawings and instructions, and the satisfaction of the management company shall prevail. The selected construction unit must be approved by the management company.
The owner of the owner shall ensure that the contractor does not cause any damage to the equipment, facilities and decoration of the building. Any damage, whether accident or not, will be managed by the management company, and the cost of the repair will be paid by the owner.
Before and during the construction, the approval notice issued by the management company must be posted outside the house to manage the company personnel inspection.
The owner's shanty shall be responsible for the preservation in the wall covering during the construction period.
When the construction needs to be fired or burned, it is necessary to go to the management public to apply for the fire certificate in advance, and follow the fire management system. The use of electrical equipment should also be operated according to the regulations.
Whenever construction is required in a public facility, it must be approved in writing by the management company. Also, provide and install good, solid precautions to prevent injury.
During the construction process, all materials, tools and wastes must be confined to the room at all times and must not block public corridors or any public places.
All works that emit noise, vibration or unpleasant smell, and the transportation of materials. The transportation of waste must be carried out at the time scheduled by the management company and must not disturb other owners of the building.
Waste from all premises must be cleared every night for a specified period of time.
Only freight elevators can be used to transport materials and waste. Under no circumstances shall workers use any escalators without the consent of the management company; metal yokes shall not be used.
During the renovation, all return air nozzles must be closed and the room door must be closed.
All loaded furniture should be prefabricated and painted outside the building. All paint work or other construction in the room, such as the management company believes that it may affect other room wall shops, must be completed outside the company's normal business hours or on a date specified by the management company.
The owner of the owner is responsible for and constrains the behavior of the employed construction personnel.
Construction workers must dress neatly, not barefoot, do not wear vests, slippers, do not stay in non-work areas, do not spit, do not smoke and throw cigarette butts in public places, do not scream loudly, do not play, do not listen to any Sound equipment, gambling and alcoholism are absolutely forbidden.
After the renovation is completed, the owner of the owner must notify the management company in writing to arrange for a final inspection.
If the decoration is not constructed according to the approved drawings or fails to meet the requirements of the management company, the owner user will be notified and responsible for the change.
If the decoration project of the owner's shanty is approved by the management company, the certificate of completion of the renovation project will be issued.
Thirteen, decoration program summary
Receive "Renovation Guide", questionnaires, drawings, etc.
If necessary, the management company personnel may be asked to meet with the designer/contractor of the owner's user.
The drawings and technical materials of the decoration plan, the completed commitment letter and questionnaire, the payment fee and the decoration deposit are handed over to the management company.
The approval agreement for the decoration plan is charged.
The list of construction workers is handed over to the management company.
The renovation project began.
The management company shall be notified in writing after the completion of the renovation project.
Final inspection by the management company personnel. If the renovation project meets the requirements of the management company, it may be notified to recover the remainder of the renovation deposit.
recommended article
- Parking contract
- LOGO Design Registration Agreement
- Computer maintenance agreement
- Jingmen City residential decoration and construction project construction contract
- International tanker charter contract
- Contract (including transportation)
- Maintenance contract
- House demolition entrustment contract
- Car maintenance contract
- Mud painting contract
- Contract
- Lighter processing installation contract
popular articles
- Save your boyfriend's words
- Contract
- Processing contract model
- Repair repair contract
- Construction and installation engineering construction contract
- Lincoln's famous sayings
- MacArthur's famous sayings
- Pump repair contract
- a famous saying that overcomes setbacks
- Putin's famous sayings
- 2014 encourages the words of a lost person
- Dedicated good words
- The latest topic of chatting with girls
- Sample of the processing agreement (light industry)
- Commissioned production contract model
- Sad sentence
- Mandela’s famous words
- Missing childhood sentences
- Print production contract
- Funny quotes
- About building a ship contract
- Boasting words 2019
- Say goodbye
- Decoration contract demonstration text
- a good sentence for the motherland
- Philosophical words 2019
- Blessing Dad’s words
- Common English sentences
- Trusted quotes
- English inspirational maxim