Sample of the processing agreement (light industry)
Date: ________ years ______ months ______ days in ________
In order to develop friendly cooperation between the two sides in the production of ____________, and to enhance the friendship between the two peoples, ____________________ factory, address: ________ city ________ and ______ country ______________, address: __________________; ____________; Telex ____________, in China Light Industrial Products Import and Export Corporation _____ provincial branch, the complete set of equipment is divided into new and old parts, is brand new, its performance is international advanced level; belongs to semi-old equipment, its main Parts must be completely renewed and fully overhauled. The performance is the same as that of new models of similar models. The price of equipment and parts is a preferential price.
The production capacity of the complete set of equipment must reach an annual output of ____________ tons or more. It is the responsibility of Party B to ensure the normal operation of the mechanical performance. If the mechanical failure or non-operational error occurs within ______ years after the equipment is put into production. Party B shall be responsible for dispatching engineering and technical personnel for repairs and free supply of spare parts. Party B shall be responsible for compensation for the losses caused by the suspension of production and shutdown. A mechanical failure will occur one and a half years later, and the reasons shall be ascertained. solve.
After the signing of the agreement, Party B shall proceed to prepare according to the above requirements. Party A shall send personnel to Party B's factory to visit the equipment and equipment performance, and the acceptance shall be subject to the acceptance of the ________ factory. Mechanical patents and technical materials are provided free of charge by Party B.
2. Party B is responsible for providing sufficient raw materials and auxiliary materials for the complete set of equipment for the ______ Taiwan ______ machine to be temporarily stored in Party A, commissioning processing, and ensuring a balanced supply on a monthly basis.
3. Party A is responsible for providing the corresponding plant, water, electricity, labor and packaging materials, and is responsible for processing according to the specifications, quantity and quality required by Party B. ____________, processing fees are charged, and all products are sold to Party B.
4. Both parties agree that the equipment price and processing fee are settled in Japanese Yen.
Second processing quantity and processing fee
Party B guarantees that the processing quantity of ____________ is ______ton or more per year, and the annual processing fee income is not less than ____________. Party A guarantees to process more than ______ tons per year or equivalent to processing income ____________ yuan or more _____ _ productivity. ______ months from the normal operation of the complete equipment as the trial production and worker training period, the processing fee during this period is based on the processing price in the tentative product plan agreed by both parties, and the first month is increased ______ %, ______% increase in the second month, ______% increase in the third month, and ______% increase in the fourth month. The above-mentioned increased processing fee shall be borne by Party B.
After the expiration of the trial production training, according to the actual specifications of the different specifications and production, the product plan and processing price initially agreed by the two parties shall be referred to. The two parties shall separately negotiate the processing fee and agree once in the next six months. The adjustment range is limited to no more than 10%.
Three payment methods
1. The price of steel, pipes and trucks required for the installation of equipment, spare parts and expansion plants is: ____________ yuan. The payment method of the payment shall be made by Party A through the credit guarantee of Guangzhou Bank of China, and ______% of the processing fee collected by Party A shall be repaid in arrears until the end of the repayment. The bank interest of the above-mentioned price shall be borne by Party A, and the annual interest rate shall be ____________ %, interest starts from the date of shipment of the last batch of equipment.
2. The payment of processing fee shall be opened by Party B to Party A within 15 days prior to the shipment of the first batch of fishing nets.
3. Processing fee is based on the settlement of the bill of lading.
Four transports, premiums
Party B shall bear the freight and insurance premiums for the delivery of raw materials and auxiliary materials to Shantou; Party A shall be responsible for the delivery of the manufactured goods to ____________ or ______, and the transportation premium shall be borne by Party B. Party A shall be responsible for the insurance premiums for the storage of equipment, raw and auxiliary materials, semi-finished products and finished products during the period of storage.
Five delivery date
In order for Party A to produce normally, Party B shall reserve the original and auxiliary materials for two months in Party A, and the raw and auxiliary materials required for normal production shall be subject to the actual acceptance of Party A. In order to make the supply normal, Party A shall notify Party B at the beginning of the second month of the quantity received, used and the stock at the end of the month. In order to enable Party B to conduct its business normally, Party A shall receive the date of the original auxiliary materials provided by Party B. The product will be delivered to Party B on time, by quality and by quantity within one month. If problems occur during the implementation, they will be resolved through friendly negotiation between the two parties.
Under no circumstances shall the contractor retain the results of the completed work.
Six-times processing and loss rate
Both the product loss rate and the defective rate should be reduced. ____________ is tentatively set as the ______%, ____________ loss rate. After the trial production period is practiced, the two parties will negotiate separately.
After the trial production period expires, if Party A suffers from operational errors, and the defective products and losses exceed a reasonable range, Party A shall be responsible for compensation for Party B's losses. If the quality of raw materials is not satisfactory, the loss will be caused by excessive quality. Party B bears.
The original and auxiliary materials required for the test machine shall be borne by Party B.
Seven technical exchanges
After the equipment arrives at the ____________ factory, Party B shall send engineers and technicians to install the machine, adjust the machinery and test machine to start until the machine is running normally, and the product is qualified. The expenses of the above-mentioned engineers and technicians in China shall be borne by Party B. Party B shall be responsible for keeping secrets on production and technology.
After Party A and Party B agreed to formally put into production, Party B dispatched technical engineering personnel to the factory to provide guidance on technical, production management and quality inspection. The specific measures will be agreed upon separately. Party B agrees that Party A shall send engineering and technical personnel to Party B for technical exchange when necessary.
Eight agreement period
This Agreement shall be valid for ________ years. During the term of the Agreement, Party A and Party B shall not reach the same or similar agreement with a third party. After the expiration of the agreement, if Party B requests it, it may be extended by ________ years with the consent of both parties. Party B has expressed its willingness to cooperate with Party A for a long time. Party A expressed its appreciation and hoped that Party B will submit a proposal as soon as possible to facilitate further negotiations.
The original of this Agreement, four copies of the Party A and the witnesses, and the Chinese witness shall prevail.
Party A: __________________________
China __________________________ factory
China Light Industrial Products Import and Export Corporation: ______
Party B: __________________________
recommended article
- Lighter processing installation contract
- Mud painting contract
- LOGO Design Registration Agreement
- Contract (including transportation)
- Computer maintenance agreement
- International tanker charter contract
- Contract
- Jingmen City residential decoration and construction project construction contract
- Parking contract
- Car maintenance contract
- House demolition entrustment contract
- Maintenance contract
popular articles
- College entrance examination inspirational quotes
- Contract
- Tao Xingzhi's famous sayings
- Print production contract
- Korean swear words
- a good saying that loves labor
- Deaf people jingle 2019
- Describe the fast time sentence 2019
- The latest high school inspirational maxim
- Repair repair contract
- Processing contract model
- Construction and installation engineering construction contract
- About building a ship contract
- Classical life motto
- Bing Xin’s famous words
- Injured sentence
- Qq space mood phrase
- Thanks to the friend's words 2019
- Du Yuexi's famous sayings
- Sample of the processing agreement (light industry)
- Strong words
- Commissioned production contract model
- Pump repair contract
- I want to say something to the teacher.
- English famous words
- Decoration contract demonstration text
- Teacher's famous saying
- Taizai’s famous sayings
- Sad love sentence 2019
- 2014 is very touching words