Contract (including transportation)
Enter into the contract:
Contractor: ____, hereinafter referred to as Party A;
The owner: ____, hereinafter referred to as Party B.
In order to ensure the full implementation of their respective obligations, both parties will sign this contract and jointly abide by it.
Article 1 The name, specification, quality, quantity, processing fee, etc. of the fixed crops processed by Party A.
┌──────┬───┬───┬─────┬────┬───┬─────┐
│定作物名│ Model │ Specifications │ Quality Requirements │Unit of Measure │ Quantity │ Processing Fee │
│ │ │ │ ││ ├──┬──┤
│ │ │ │ ││ │Unit│Total price│
├──────┼───┼───┼─────┼────┼───┼──┼──┤
│ │ │ │ ││ │││
├──────┼───┼───┼─────┼────┼───┼──┼──┤
│ │ │ │ ││ │││
├──────┼───┼───┼─────┼────┼───┼──┼──┤
│ │ │ │ ││ │││
└──────┴───┴───┴─────┴────┴───┴──┴──┘
The second completion time, inspection standards and methods, packaging standards and cost commitments of finished products.
┌──────┬────┬──────┬──────┬────┬────┐
│定作物名称│Completion time│Inspection time and place│Inspection standard and party│Packaging standard│Packaging fee │
│ │││法││ │
├──────┼────┼──────┼──────┼────┼────┤
│ ││││││
├──────┼────┼──────┼──────┼────┼────┤
│ ││││││
└──────┴────┴──────┴──────┴────┴────┘
Article 3 The delivery time, location, transportation method and freight commitment of the finished product.
┌──────┬─────┬──────┬──────┬───────┐
│ Fixed crop name │ Delivery time │ Delivery location │ Transportation method │ Transportation price commitment │
├──────┼─────┼──────┼──────┼───────┤
││ │││ │
├──────┼─────┼──────┼──────┼───────┤
││ │││ │
├──────┼─────┼──────┼──────┼───────┤
││ │││ │
└──────┴─────┴──────┴──────┴───────┘
Article 4 Party B shall provide the name, specification, quality, quantity, price, etc. of the raw materials, as well as drawings and technical materials.
┌────┬──┬──┬────┬────┬──┬──┬──┬────┐
│Material Name│Model│Specification│Quality Requirements│Unit of Measurement│Quantity│Unit Price│Total Price│Drawing, Technology│
││││││││││Surgical information and │
││││││││││ Delivery time │
├────┼──┼──┼────┼────┼──┼──┼──┼────┤
││││││││││
├────┼──┼──┼────┼────┼──┼──┼──┼────┤
││││││││││
└────┴──┴──┴────┴────┴──┴──┴──┴────┘
Article 5 Time, place, packaging, inspection methods and transportation of raw materials.
┌────┬────┬────┬────┬────┬────┬────┐
│Material Name│Delivery Time│Delivery Location│Delivery Quantity│Packaging Requirements│Test Method│Transport Method│
│││││││ and shipping │
│││││││ │
├────┼────┼────┼────┼────┼────┼────┤
││││││││
├────┼────┼────┼────┼────┼────┼────┤
││││││││
└────┴────┴────┴────┴────┴────┴────┘
Article 6 Processing fee settlement method and time __________________.
Article 7 Party B shall deliver a deposit of ____ yuan to Party A before the ____ __ date; Party B shall deliver a prepayment of ____ yuan to Party A before _________. If Party B fails to perform the contract, Party B has no right to request a refund of the deposit. If Party A fails to perform the contract, in addition to the liability for breach of contract, the advance payment must be returned in full. If Party B fails to perform the contract, the advance payment may be used as a liquidated damages and compensation, and the balance may be refunded.
Article 8 Party A’s liability for breach of contract
1. If Party A fails to deliver the fixed crop according to the quality stipulated in the contract, and Party B agrees to use it, it shall be subject to price negotiation; if it disagrees with the use, Party A shall be responsible for repair or exchange, and shall bear the responsibility for overdue delivery; after trimming or adjustment, If the contract is not in compliance with the contract, the right to refuse, the damage caused by Party A shall be compensated.
2. If the quantity of fixed crops delivered by Party A is less than the contractual provisions, and Party B still needs it, Party A shall make up the amount according to the number, and the supplementary part shall be delivered according to the overdue payment; if Party B no longer needs it, it shall have the right to cancel the contract, so the losses caused by Party A compensates.
3. If the fixed crop is damaged due to poor packaging of Party A, Party A shall compensate for the loss.
4. If Party A fails to deliver the fixed crops, Party B shall repay the liquidated damages to Party B. For each day overdue, the liquidated damages shall be repaid in accordance with the total amount of the overdue delivery.
5. If Party A fails to deliver the fixed crop, Party B shall pay Party B a penalty for the inability to deliver the total value of the fixed portion of the crop ___%.
6. If Party A is responsible for delivery, if the fixed crop is damaged during transportation, Party A shall be responsible for repair and meet the quality requirements stipulated in the contract. Otherwise, Party B has the right to reject it.
Article 9 Party B's liability for breach of contract
1. If Party B changes the quantity, specification, quality or design of the fixed crops in the middle, it shall compensate Party A for the losses caused by Party A.
2. If Party B abolishes the contract midway, Party B shall reimburse Party A for failing to perform part of the fixed crop price of ___%.
3. If Party B fails to provide drawings and other technical materials to Party A at the time specified in the contract, Party B shall reimburse Party A for the loss due to the suspension of work, except for the date of delivery of the fixed crop.
4. If Party B pays more than the date specified in the contract, Party B shall pay Party A the liquidated damages in accordance with the provisions of the People's Bank of China regarding deferred payment.
5. If Party B refuses to accept the fixed crop without reason, it shall compensate Party A for the losses caused by Party A.
6. If Party B changes the delivery of the fixed crop location, it shall bear the expenses incurred as a result.
Article 10 Force Majeure
During the period of performance of the contract, if the crop or raw materials are damaged or lost due to force majeure, Party A may be exempted from liability for breach of contract after being proved by the relevant department. However, Party A shall take active measures to minimize losses. If the loss of force majeure occurs outside the performance period specified in the contract, Party A shall not be exempted from Party A's liability; Party B shall bear the responsibility for the occurrence of Party B's late acceptance or unreasonable rejection. And compensate for the losses caused by Party A.
Article 11 When a dispute arises in this contract, the two parties shall settle the dispute through consultation; if the negotiation fails, they may file a suit in the people's court.
This contract is effective on the date of __________, and the contract will be invalid upon completion.
This contract is a ___ share, one for each party, and one for each of the notary office, the price bureau, and the construction bank.
Contractor: _____ fixed party: ______
Address: ______ Address: _______
Legal representative: ___ Legal representative: ____
Signing date: ____ years __ month __ day
Contractor: ____, hereinafter referred to as Party A;
The owner: ____, hereinafter referred to as Party B.
In order to ensure the full implementation of their respective obligations, both parties will sign this contract and jointly abide by it.
Article 1 The name, specification, quality, quantity, processing fee, etc. of the fixed crops processed by Party A.
┌──────┬───┬───┬─────┬────┬───┬─────┐
│定作物名│ Model │ Specifications │ Quality Requirements │Unit of Measure │ Quantity │ Processing Fee │
│ │ │ │ ││ ├──┬──┤
│ │ │ │ ││ │Unit│Total price│
├──────┼───┼───┼─────┼────┼───┼──┼──┤
│ │ │ │ ││ │││
├──────┼───┼───┼─────┼────┼───┼──┼──┤
│ │ │ │ ││ │││
├──────┼───┼───┼─────┼────┼───┼──┼──┤
│ │ │ │ ││ │││
└──────┴───┴───┴─────┴────┴───┴──┴──┘
The second completion time, inspection standards and methods, packaging standards and cost commitments of finished products.
┌──────┬────┬──────┬──────┬────┬────┐
│定作物名称│Completion time│Inspection time and place│Inspection standard and party│Packaging standard│Packaging fee │
│ │││法││ │
├──────┼────┼──────┼──────┼────┼────┤
│ ││││││
├──────┼────┼──────┼──────┼────┼────┤
│ ││││││
└──────┴────┴──────┴──────┴────┴────┘
Article 3 The delivery time, location, transportation method and freight commitment of the finished product.
┌──────┬─────┬──────┬──────┬───────┐
│ Fixed crop name │ Delivery time │ Delivery location │ Transportation method │ Transportation price commitment │
├──────┼─────┼──────┼──────┼───────┤
││ │││ │
├──────┼─────┼──────┼──────┼───────┤
││ │││ │
├──────┼─────┼──────┼──────┼───────┤
││ │││ │
└──────┴─────┴──────┴──────┴───────┘
Article 4 Party B shall provide the name, specification, quality, quantity, price, etc. of the raw materials, as well as drawings and technical materials.
┌────┬──┬──┬────┬────┬──┬──┬──┬────┐
│Material Name│Model│Specification│Quality Requirements│Unit of Measurement│Quantity│Unit Price│Total Price│Drawing, Technology│
││││││││││Surgical information and │
││││││││││ Delivery time │
├────┼──┼──┼────┼────┼──┼──┼──┼────┤
││││││││││
├────┼──┼──┼────┼────┼──┼──┼──┼────┤
││││││││││
└────┴──┴──┴────┴────┴──┴──┴──┴────┘
Article 5 Time, place, packaging, inspection methods and transportation of raw materials.
┌────┬────┬────┬────┬────┬────┬────┐
│Material Name│Delivery Time│Delivery Location│Delivery Quantity│Packaging Requirements│Test Method│Transport Method│
│││││││ and shipping │
│││││││ │
├────┼────┼────┼────┼────┼────┼────┤
││││││││
├────┼────┼────┼────┼────┼────┼────┤
││││││││
└────┴────┴────┴────┴────┴────┴────┘
Article 6 Processing fee settlement method and time __________________.
Article 7 Party B shall deliver a deposit of ____ yuan to Party A before the ____ __ date; Party B shall deliver a prepayment of ____ yuan to Party A before _________. If Party B fails to perform the contract, Party B has no right to request a refund of the deposit. If Party A fails to perform the contract, in addition to the liability for breach of contract, the advance payment must be returned in full. If Party B fails to perform the contract, the advance payment may be used as a liquidated damages and compensation, and the balance may be refunded.
Article 8 Party A’s liability for breach of contract
1. If Party A fails to deliver the fixed crop according to the quality stipulated in the contract, and Party B agrees to use it, it shall be subject to price negotiation; if it disagrees with the use, Party A shall be responsible for repair or exchange, and shall bear the responsibility for overdue delivery; after trimming or adjustment, If the contract is not in compliance with the contract, the right to refuse, the damage caused by Party A shall be compensated.
2. If the quantity of fixed crops delivered by Party A is less than the contractual provisions, and Party B still needs it, Party A shall make up the amount according to the number, and the supplementary part shall be delivered according to the overdue payment; if Party B no longer needs it, it shall have the right to cancel the contract, so the losses caused by Party A compensates.
3. If the fixed crop is damaged due to poor packaging of Party A, Party A shall compensate for the loss.
4. If Party A fails to deliver the fixed crops, Party B shall repay the liquidated damages to Party B. For each day overdue, the liquidated damages shall be repaid in accordance with the total amount of the overdue delivery.
5. If Party A fails to deliver the fixed crop, Party B shall pay Party B a penalty for the inability to deliver the total value of the fixed portion of the crop ___%.
6. If Party A is responsible for delivery, if the fixed crop is damaged during transportation, Party A shall be responsible for repair and meet the quality requirements stipulated in the contract. Otherwise, Party B has the right to reject it.
Article 9 Party B's liability for breach of contract
1. If Party B changes the quantity, specification, quality or design of the fixed crops in the middle, it shall compensate Party A for the losses caused by Party A.
2. If Party B abolishes the contract midway, Party B shall reimburse Party A for failing to perform part of the fixed crop price of ___%.
3. If Party B fails to provide drawings and other technical materials to Party A at the time specified in the contract, Party B shall reimburse Party A for the loss due to the suspension of work, except for the date of delivery of the fixed crop.
4. If Party B pays more than the date specified in the contract, Party B shall pay Party A the liquidated damages in accordance with the provisions of the People's Bank of China regarding deferred payment.
5. If Party B refuses to accept the fixed crop without reason, it shall compensate Party A for the losses caused by Party A.
6. If Party B changes the delivery of the fixed crop location, it shall bear the expenses incurred as a result.
Article 10 Force Majeure
During the period of performance of the contract, if the crop or raw materials are damaged or lost due to force majeure, Party A may be exempted from liability for breach of contract after being proved by the relevant department. However, Party A shall take active measures to minimize losses. If the loss of force majeure occurs outside the performance period specified in the contract, Party A shall not be exempted from Party A's liability; Party B shall bear the responsibility for the occurrence of Party B's late acceptance or unreasonable rejection. And compensate for the losses caused by Party A.
Article 11 When a dispute arises in this contract, the two parties shall settle the dispute through consultation; if the negotiation fails, they may file a suit in the people's court.
This contract is effective on the date of __________, and the contract will be invalid upon completion.
This contract is a ___ share, one for each party, and one for each of the notary office, the price bureau, and the construction bank.
Contractor: _____ fixed party: ______
Address: ______ Address: _______
Legal representative: ___ Legal representative: ____
Signing date: ____ years __ month __ day
recommended article
- Computer maintenance agreement
- Maintenance contract
- Lighter processing installation contract
- Parking contract
- House demolition entrustment contract
- Mud painting contract
- Contract (including transportation)
- Jingmen City residential decoration and construction project construction contract
- International tanker charter contract
- LOGO Design Registration Agreement
- Contract
- Car maintenance contract
popular articles
- Life motto
- Commissioned production contract model
- Legal maxim
- Repair repair contract
- Print production contract
- Decoration contract demonstration text
- About building a ship contract
- Good sentence excerpt 2019
- Construction and installation engineering construction contract
- Processing contract model
- Motivate employees
- Space mood phrase
- Distressed sentence 2019
- Respect the teacher's famous words
- Hyun dance family impression sentence
- Contract
- What I said to my father 2019
- Sample of the processing agreement (light industry)
- Pump repair contract
- Parental love
- Encourage words 2019
- Spring Festival blessing
- Weibo's famous sayings
- Blessing phrase
- Relieved words
- Philosophical words 2019
- Non-mainstream sentence 2019
- Grateful mother's words
- Not afraid of failure
- 2014 motivational phrase