House decoration contract


Party A:

Party B:

After friendly negotiation, both parties will reach an agreement on the decoration and construction of Party A's contracting party and sign this contract.

1. Party B shall undertake all construction work for the decoration of the house, that is, the implementation of “contracting without packaging”, Party A shall prepare the decoration materials, and Party B shall only be responsible for the construction. The specific construction contents are detailed in the attached files.

Second, the contracting costs: RMB. In addition, Party A will no longer pay any fees to Party B.

Third, the payment method:

1. On the date of Party B's construction, Party A will prepay the RMB to Yuanfang;

2. After Party B completes all renovation works, the payment progress is RMB 仟 round;

3. Within days after the completion of all renovation works, Party A shall pay the remaining RMB.

4. Construction period: Both parties shall determine that the construction period of the building is one day, and Party B shall complete all construction tasks within the agreed time period.

V. Other agreements:

1. Party A shall be responsible for purchasing decoration materials in time according to the list provided by Party B;

2. Party A shall pay in time according to the contract, otherwise payment of liquidated damages shall be made at 200 yuan/day;

3. Party B prepares its own tools and hires personnel to take charge of construction safety. It strictly follows the drawings provided by Party A and the requirements of Party A to ensure the quality of the project. If the quality is unqualified during the construction process, it will cause rework, resulting in the decoration. Material loss and labor loss shall be borne by Party B itself;

4. Party B shall not waste or misappropriate Party A's decoration materials, otherwise it shall be punished according to 500 yuan/time, and shall compensate Party A for losses;

5. Party B shall complete all construction tasks within the contract period as agreed in the contract, and shall be punished according to 200 yuan/day for each extension. If Party A delays the construction period due to Party A's failure to pay in time, delay in decoration materials or new construction contents, Party B shall not be liable for breach of contract;

6. The warranty period for the decoration of the house is one year. During the warranty period, Party B shall be responsible for the free maintenance of Party A in time.

6. This contract is made in two copies, each party holding one copy, and the two parties will take effect after signing.

person A person B:

Time: Time:

Housing decoration contracting content living room production, paint 1, door door cover;

2, shoe cabinet;

3, porch;

4, wine cabinet;

5. TV cabinet;

6, the kitchen door cover;

7, TV background wall;

8. The top of the TV background wall is suspended;

10. Living room and balcony sliding door cover;

11, the aisle ceiling of the bathroom door.

Master bedroom 1, wardrobe;

2, double-sided door cover, door panel;

3. Aisle ceiling.

Second bedroom production 1, double-sided door cover, door panel;

2, the wardrobe.

Children's room 1, two double-sided door sets, door panels;

2, the wardrobe;

3. Computer desk and bookshelf;

4. Tatami bed;

Bathroom 1, ceiling;

2 change Shenshuiwan.

4. Paving floor tiles and wall tiles.

Kitchen 1, floor tiles, wall tiles;

2, ceiling.

Two living balconies, with floor tiles;

2, the production site, hanging cabinets.

Living room balcony 1, desk, bookcase;

Comprehensive class 1, living room, bedroom, living room balcony top and wall putty 3 times, wall paint 2 times;

2. The kitchen and bathroom pipes are supplemented and modified;

3. All circuit transformation;

4. Leveling all floors;

5, bathroom wall waterproof treatment;

6, wardrobe, bookcase moisture-proof treatment;

7. Installation of lamps and sanitary ware;

8, the bay window laying marble;

9. Laying door sills in the bathroom and kitchen door;

10, the living room balcony, living balcony attached to the skirting;

11, package all the water pipes, fume pipes.

,other:

1. Handling of decoration materials;

2. Decoration and sanitation, garbage disposal to the community garbage station;

3, decoration management fee, garbage clearance freight is responsible for Party A