Office decoration contract
Owner: Contact number:
Construction team: Contact number:
In the attitude of friendly cooperation, both parties are signing the following contract in an equal and fair manner in accordance with the relevant laws of the Contract Law.
I. Project Overview Project Address:
Second, the price clearing labor: ¥ yuan, uppercase:
Among them, the water and electricity yuan woodworking yuan tile yuan yuan paint workers Yuan garbage clear freight yuan
Third, the payment method
1. The construction team enters the market and advances the living expenses: 1000 yuan
2, woodwork is completed, pay 1000 yuan 3, bricklayer completed, pay 1000 yuan
4, the project is completed, pay 1800 yuan
5, the warranty fee of 400 yuan, paid 1 year after the date of completion
Fourth, the design
1. If Party A has drawings, it shall provide Party B with a set of drawings and be responsible for the work of the bottom.
2. If Party A has no drawings, Party B shall submit a clear request to Party B. Party B shall draw a sketch before Party B for approval.
Five, materials
1. Party B shall provide Party A with the list of materials to be purchased 3 days in advance. Party A shall purchase materials in time for use by the construction team within 4 days. Both parties shall bear their respective responsibilities and economic losses for delaying the construction period.
2. Party B shall not purchase materials by itself without the consent of Party A. If it has been purchased, Party A has the right to refuse to use it unconditionally and may refuse to pay the materials.
3. Party B shall purchase materials at the building materials supply point designated by Party A and issue a formal invoice.
4. Party B shall check the quality of the building materials purchased by Party A and find that the quality problem shall be promptly submitted to Party A and has the right to refuse to use it. If Party A insists on using it, it shall request Party B in writing and bear the loss caused by the quality of the material.
5. Party B shall help Party A to receive the goods and check the accuracy of the quantity and accessories.
6. Party B shall do a good job in the custody of materials and prohibit the entry of people and other people into the site.
7. Party B shall ensure that there are no double-package and half-package projects in the community.
8. Party B shall do a good job in the finished product protection work completed by the construction.
9. Without the permission of Party A, Party B shall not carry any building materials to go out. If such a phenomenon is found, it shall be deducted from the labor fee according to the material price doubled.
6. The construction period starts from the day of the month of 2004 to the day of the month of 2004. The construction period is days. Due to the delay of Party A, the construction period is postponed. Due to Party B's delay in the construction period, Party A can deduct the labor cost of Party B by 50 yuan/day.
7. Material handling materials shall be delivered to the downstairs of the project site, and any construction personnel of Party B shall be transported unconditionally.
Eight, garbage clear
Transportation 1, garbage bagging
2, garbage should be clear in the day
3. Garbage should be cleared by Party B to the garbage dump designated by the property.
Workforce management
1. Party B shall provide Party A with a copy of the ID card of all construction personnel before starting work.
2. Non-worksite construction personnel shall not stay overnight at the construction site without the permission of Party A.
3. Party A shall promptly handle the community access documents and pay the relevant fees for Party B.
4. Party B shall have all the documents temporarily occupied in Shanghai, and Party B shall bear the relevant losses caused by the incomplete documents.
5. Party B shall designate the person in charge of the site as the substitute person in charge.
6. Within the contract price, Party B shall provide the person to follow Party A's selection of materials.
7. Party B shall not arbitrarily exchange construction personnel without the consent of Party A. Every day, the construction site must maintain more than 2 construction workers.
8. Party B shall not suspend work or absenteeism under any circumstances without the consent of Party A.
Ten, construction machinery
1. Party B shall bring the necessary tools for construction and ensure the safety and good use of the tools. Party B shall bear the tool maintenance fee.
2. The consumables generated by the tools are borne by each of the two parties, Party A and Party A, and the settlement is completed after the completion of the project.
XI. Site site management
1. Open flames are prohibited on the spot.
2. No smoking on the spot.
3. The paint material must be placed separately from other materials.
Twelve, maintenance
1. Due to the quality problems caused by Party B's construction, Party B shall repair it free of charge within two years.
2. Ordinary maintenance Party B shall promptly repair it within three days after Party A informs Party B. In special circumstances, Party B must arrive and repair within 24 hours.
3. If Party B fails to complete the repair in time according to the contract, Party A may arrange for other construction teams to carry out maintenance work, and the labor expenses incurred shall be deducted from the actual warranty.
XIII. Contract Attachment File
1. List of construction projects.
2. A quotation approved by both parties.
3. A list of materials purchased by Party B.
XIV. Contract dispute
1. In the event of a dispute, Party A and Party B will first negotiate.
2. If the negotiation fails, the lawsuit can be filed in the court where the dispute is located.
Fifteen, decoration requirements
a. Decoration process "circuit installation process requirements:
1. When installing the circuit, the product material with the certificate of conformity must be used.
2. Three-wire system installation must use three different color standards. In principle, red, yellow, blue, and fire color. Blue, green, and white are zero-line color scales, and black, yellow, and green lines are grounded color scales.
3. When all the wires are installed, they must be put on the corresponding pvc pipe and buried in the groove with a depth of 4×3cm. If the groove is widened in the side-by-side line, it cannot affect the construction of other types of work. If necessary, In consultation with wood and bricklayers to solve the problems in construction, there must be no consideration for themselves, regardless of the overall work style.
4. All lines must be distributed in a horizontal and vertical direction. Spider-web distribution is strictly prohibited. The pvc pipe should be put into the main switch box about 3cm, then along the wall, vertically distributed along the ground, the bend is connected with a 90-degree elbow or hose, and fixed with a pipe clamp. All wires must not have connectors in the pvc pipe.
5. The wire diameter of the embedded wire is measured according to the power of the electrical appliance. The wiring of the air conditioner, Yuba, electric water heater and freezer must be placed in place from the switch box.
6. The length of all pre-embedded wires left at the junction box is 20cm. The wire box must be tightly packed with cement mortar, and it should be kept straight and not skewed. The joint should be slightly lower than the wall surface by about 0.5cm. The total switch box size can be determined by how many wires the customer uses.
7. After all the conductors are in place and confirmed, the power can be tested. The method is as follows: connect all the power connectors to the 15w bulb on the lamp cap, and turn on the power. If the lamp is fully lit, the circuit installation is basically qualified. Then you can fill in the project transfer order. . The person in charge of other types of work is required to sign and accept, and the electrical concealment project is initially completed.
8. Install various lamps and switch panels. It is necessary to enter the field three days before the paint is about to be withdrawn or the last time the paint is applied. The top of the large chandelier must be fixed with 4×3cm of wood before the expansion, and then the chandelier is fixed. On the wooden side. The panel mounting of all switches must be flat and straight and must not be skewed. When the stencil ceiling lamp is installed, the fixed roving must be cut on the wooden raft, and it is strictly prohibited to cut on the gusset.
9. Telephone lines and cable TV lines must not be in the same line as the wires in a pvc pipe. "
"Waterway process installation requirements:
1. The 6-point water pipe or aluminum-plastic composite pipe used must be a qualified product that has been inspected and manufactured.
2. During the construction process, all the pipe joints of the pipe joints must be wrapped with hemp and white paint, tightened, and placed vertically in the horizontal and horizontal directions. The pipe must be installed under the main pipe to keep the overall water distribution on a horizontal line.
3. The water pipe through the balcony must be buried in the 4cm deep groove of the ground or wall of the original rough house, and then the groove is sealed with cement mortar.
4. After the pipe is distributed in place, the pipe clamp must be used to tighten the pipe at the corner or where there is a standing faucet, so as not to loosen.
5. All water pipes must be installed with water pipes and floor drains. When pipes of PVC pipes are connected, they must be coated with special PVC glue to evenly cover them. And pay attention to the horizontal drop when connected to the main lower water pipe buried in the original rough house, should be kept static solidification for 6 hours.
6. If the main down pipe pre-buried in the original rough house is not enough or not ideal, you can re-open the hole on the floor according to the actual situation, and re-use the mortar with fireproof glue to seal the pipe around the new seal. Place a cement mortar around a 10mm high circle. After 58 hours of solidification, fill the circle with water. After 24 hours, infiltrate into the downstairs to see if there is any water seepage around the newly installed water pipe. For example, if there is no proof that the newly installed pipeline is qualified, otherwise it needs to be re-treated, and then the water seepage test is passed until it is qualified. "
Brush the wall 1 Before painting the wall, scrape off some of the water and putty on the wall and the canopy, do the patch treatment 2 times, 108 glue, two times, putty, once again, primer, two times, the top of the painted ceiling, 3 Note the amount of water required for the latex paint, 4 walls Every time you paint, you need the owner to check it out.
Package door cover 1. Remove the original door frame, large core board substrate, enamel wood veneer, eucalyptus solid wood door line. The door sleeve has a line width of no more than 55mm and a thickness of no more than 10mm. 2. Paint: polyester varnish 3 times.
3 The wall and door cover should be covered with bandage or kraft paper. The acceptance standard 1 of the dumb mouth should be horizontal and vertical, ±1mm within 2 meters, and the exposed part of each workpiece should be chamfered by 1×45°, all yin and yang angles. It must be placed on the door cover by the square ruler. 2 Check the vertical degree door. 1. Multi-layer plate pressing, edge sealing, flat plate has shape.
2. Paint: Polyester varnish 3 times.
3. After the door cover is wrapped, there will be a lot of nail holes. It should be done by first brushing the wood varnish and then letting the oiler make up the nail holes, then scraping the putty, the putty should be scraped at least twice until the surface is smooth and flat. After the scraping is finished with sandpaper, it can be painted.
recommended article
- Contract
- Parking contract
- International tanker charter contract
- Computer maintenance agreement
- Mud painting contract
- Lighter processing installation contract
- House demolition entrustment contract
- Car maintenance contract
- Jingmen City residential decoration and construction project construction contract
- Contract (including transportation)
- Maintenance contract
- LOGO Design Registration Agreement
popular articles
- Pump repair contract
- Qq space mood phrase
- Classical life motto
- Deaf people jingle 2019
- Taizai’s famous sayings
- Teacher's famous saying
- Print production contract
- College entrance examination inspirational quotes
- Thanks to the friend's words 2019
- Construction and installation engineering construction contract
- Sad love sentence 2019
- Bing Xin’s famous words
- Contract
- Decoration contract demonstration text
- Du Yuexi's famous sayings
- Tao Xingzhi's famous sayings
- Commissioned production contract model
- Korean swear words
- 2014 is very touching words
- English famous words
- Injured sentence
- Describe the fast time sentence 2019
- a good saying that loves labor
- Sample of the processing agreement (light industry)
- Repair repair contract
- I want to say something to the teacher.
- About building a ship contract
- Processing contract model
- Strong words
- The latest high school inspirational maxim