Beijing contract
Contract number: ____________
Founder: ______________ Signing location: ______________
Contractor: ______________ Signing time: ___________
The first contract project
Contract name and content
unit of measurement
Quantity or workload
remuneration
unit price
Total price
Article 2 Technical standards and quality requirements: _____________________
Article 3 The materials used by the contractor shall be provided by the person. Material inspection method, time and deadline for filing an objection: __________
Article 4 The time, method and confidentiality requirements for the technical information, drawings, etc. of the ordering party: _________________
Article 5 If the contractor finds that the drawings and technical requirements provided by the ordering party are unreasonable, he shall file a written objection to the ordering party within the day. The ordering party should reply within the day after receiving the written objection.
Article 6 The ordering party allows the main work in the contracted project to be completed by a third party; the work that can be completed by a third party is: ________________
Article 7 Matters and requirements for the ordering person to assist the contractor: ____________________
Article 8 The time limit, method and place of delivery of work results: ______________________
Article 9 Acceptance criteria, methods and deadlines for work results: ________________________
Article 10 Term and conditions for the contractor to be responsible for the quality of work results: ________________
Article 11 The ordering party shall give the contractor ______ yuan before the ______ year ______ month ______ day.
Article 12 Settlement Method and Term: _________________
Article 13 If the ordering party fails to pay the remuneration or material fee to the contractor, the contractor may retain the work result.
Article 14 Conditions for the dissolution of this contract:
The ordering party may cancel the contract at any time, but shall promptly notify the contractor in writing and bear the losses caused thereby to the contractor.
_________________________________________
Article 15: The contractor’s liability for breach of contract: __________________________
Contractor’s liability for breach of contract: ____________________ ____________
Article 16: Settlement of contract disputes: The disputes arising under this contract shall be settled by the parties or negotiated for mediation; if the negotiation or mediation fails, the following ____ methods shall be resolved:
Submit ______________________ Arbitration Commission Arbitration;
Prosecuted in accordance with the law in the _____________________ People's Court.
Article 17 Other agreed matters: ___________________
Setter
Founder: Residence:
Business license number: ID number:
Legal representative: Attorney:
telephone / fax:
Bank of deposit: Account number:
Tax ID: Postal code:
Contractor
Contractor: Residence:
Business license number: ID number:
Legal representative: Attorney:
telephone / fax:
Bank of deposit: Account number:
Tax ID: Postal code:
Beijing Municipal Administration for Industry and Commerce
recommended article
- Maintenance contract
- House demolition entrustment contract
- Contract (including transportation)
- Jingmen City residential decoration and construction project construction contract
- Computer maintenance agreement
- Car maintenance contract
- Mud painting contract
- International tanker charter contract
- Parking contract
- Contract
- Lighter processing installation contract
- LOGO Design Registration Agreement
popular articles
- Sample of the processing agreement (light industry)
- English famous words
- Du Yuexi's famous sayings
- Taizai’s famous sayings
- Classical life motto
- Describe the fast time sentence 2019
- Decoration contract demonstration text
- Strong words
- Commissioned production contract model
- Print production contract
- Bing Xin’s famous words
- Pump repair contract
- 2014 is very touching words
- The latest high school inspirational maxim
- Repair repair contract
- Processing contract model
- Qq space mood phrase
- Injured sentence
- I want to say something to the teacher.
- About building a ship contract
- Construction and installation engineering construction contract
- Teacher's famous saying
- Tao Xingzhi's famous sayings
- Thanks to the friend's words 2019
- Sad love sentence 2019
- Deaf people jingle 2019
- a good saying that loves labor
- Contract
- Korean swear words
- College entrance examination inspirational quotes