Contractual contract template
Date of signing: ________ By the negotiation of both parties, sign this contract and jointly abide by it.
The total amount of goods is RMB:
1. Quality standards: ___________
2. Delivery method and location: ________
3. Quality inspection and acceptance methods: _________
4. Packaging requirements and cost burden: __________
5. Settlement method and time limit: _____________
6. Raw material supply method: ____________
7. Other: _______________
Liability for breach of contract:
The first point: Party A bears
When the product variety, quality or packaging specifications are changed to cause losses to Party B, the actual loss of Party B shall be repaid ____
If the return is made midway, Party B will pay the liquidated damages of Party B to return the total value of the payment.
If the self-raised product fails to pick up the goods on the specified date, each time the extension is made, Party B shall reimburse Party B for the penalty of ___ of the total value of the goods to be deferred.
If the raw materials, technical materials and packaging materials are not supplied in accordance with the time and requirements stipulated in the contract, the delivery shall be repaid in accordance with the date of delivery, and the liquidated damages of one-thousandth of the total value of the products delivered by Party B shall be repaid on a daily basis.
If payment is not made according to the date specified in the contract, each time the extension is extended, Party B shall reimburse Party B for a penalty of one-thousandth of the total deferred payment.
If the product that is delivered or shipped for delivery refuses to receive the goods without any reason, it shall bear the losses caused and pay the transportation department liquidated damages.
If the wrong place is filled or the receiver is received, the damage caused shall be borne.
other___________
The second point: Party B assumes
Products, colors, varieties, specifications, quality, and packaging do not comply with the contract. If Party A agrees to receive the goods, the quality shall be based on the price; if Party A does not agree to the goods received, Party B shall repair, return, replace, and assume The damage caused.
If the goods are not delivered in accordance with the quantity stipulated in the contract, if they are still needed and Party A still needs them, they shall pay the amount according to the number; if they are not required, they may return the goods and bear the losses; if they are unable to deliver the goods, they shall pay the goods that Party A cannot deliver. A penalty of ____ total value.
If the packaging does not comply with the contract, it must be repaired or repackaged, and bear the expenses thus paid; Party A does not require repair or repackage, and the compensation for the loss shall be compensated.
If the delivery is not made within the time specified in the contract, each time the extension is extended, Party A shall reimburse Party A for a penalty of one-thousandth of the total value of the delayed delivery.
If the product does not comply with the contract, Party A shall pay the storage and maintenance fees actually paid by Party A during the period of custody.
If the product is sent to the place of delivery or the consignee, it shall be transported to the designated place of arrival or the consignee in accordance with the contract, and shall bear the transportation and miscellaneous expenses and the delay of delivery due to the overpayment.
other:____________
This contract is a ___ share.
Valid from ____ years __month __ day to ____ years __ month __ days
Party A: ______
Party B: ________
Legal representative: _______
phone:________
address:________
Bank of deposit: _____
account number:________
recommended article
- House demolition entrustment contract
- Car maintenance contract
- Computer maintenance agreement
- Lighter processing installation contract
- LOGO Design Registration Agreement
- Contract (including transportation)
- Parking contract
- Maintenance contract
- Contract
- International tanker charter contract
- Jingmen City residential decoration and construction project construction contract
- Mud painting contract
popular articles
- Injured sentence
- Contract
- About building a ship contract
- Print production contract
- I want to say something to the teacher.
- Sample of the processing agreement (light industry)
- Construction and installation engineering construction contract
- Processing contract model
- Decoration contract demonstration text
- Taizai’s famous sayings
- 2014 is very touching words
- Du Yuexi's famous sayings
- Korean swear words
- Describe the fast time sentence 2019
- The latest high school inspirational maxim
- Sad love sentence 2019
- Classical life motto
- Strong words
- English famous words
- Thanks to the friend's words 2019
- Repair repair contract
- Bing Xin’s famous words
- a good saying that loves labor
- Teacher's famous saying
- Qq space mood phrase
- Deaf people jingle 2019
- Commissioned production contract model
- Tao Xingzhi's famous sayings
- College entrance examination inspirational quotes
- Pump repair contract