Renovation project responsibility book


Resident _________ entrusted _________ to renovate the _________ floor _________ room of the _________ building managed by _________ Property Management Company. In order to strengthen the management of the renovation project, ensure the quality of the project and the normal working and living order of the building, both parties agree to sign this responsibility letter.
1. When the decoration personnel enter the home decoration, they must pay the property management company a daily management fee of _________ yuan per person.
Second, the decoration staff must pay two 1-inch photos, one for the temporary entry permit and the other for the personal file.
3. The decoration personnel shall not affect the rest of the adjacent users during the renovation period. The decoration must be carried out within the specified time, that is, 8:00-12:00 am, 14:00-16:00. It is forbidden to use electric machinery and paint spraying at night.
4. The decoration personnel are not allowed to invade other owners. They are not allowed to stroll in the corridors and are not allowed to stay on other floors.
5. The decorators must maintain public places, including stairs, aisles and walls. It is not allowed to pour sewage and waste into the corridor, and no debris should be piled up in public parts. The decoration garbage should be disposed of in time.
6. The person in charge of the construction shall ensure the integrity of the public facilities on each floor. If the elevator button is not allowed to be arbitrarily pressed, it shall not be scribbled or doodled.
Seven, pay attention to electricity and fire safety. For example, use a proper plug when using electricity; do not use the power cord to directly connect to the leakage switch; do not cook or boil water in an electric furnace.
8. For the construction of electric welding, it is necessary to apply to the property management company for fire fighting equipment in advance, and it is forbidden to smoke beside the inflammable and explosive materials.
  9. When the decoration materials are super long and wide, it is forbidden to use the elevator.
10. The decoration staff is not allowed to stay in the construction site. If you need to stay overnight, you should contact the property management company first, and you can stay overnight after agreeing.
11. The construction team shall be renovated in strict accordance with relevant regulations. If the owner asks for illegal decoration, he should explain the explanation and refuse to decorate. Otherwise, in addition to the responsibility of the owner, the construction team should also bear certain responsibilities.
12. When a problem arises, the person in charge of construction shall contact the property management company in time, and the two parties shall negotiate and resolve it, and shall not be the owner.
  13. In case of violation of the above provisions, the property management company will impose a fine according to the seriousness of the circumstances and has the right to order it to stop work and rectify.
14. If there are any outstanding issues, the two parties may resolve the matter separately.
15. This responsibility is valid after the stamp is stamped. In duplicate, each party holds one copy.
person A person B:_________
Person in charge: _________ Person in charge: _________
_________Year ____________________________________________