Party A: _________

Party B: _________

According to the Ministry of Construction of the People's Republic of China "Civil Building Engineering Indoor Environmental Pollution Control Regulations", "Residential Interior Decoration Management Measures" and the State Administration of Quality Supervision, Quarantine issued the "Determination of Hazardous Substances in Interior Decoration Materials" ten standards and related laws and regulations It is stipulated that both Party A and Party B have reached the following agreement on green environmental protection and decoration:

1. Party B guarantees that the project implements environmental protection design, adopts environmentally friendly materials, carries out environmental protection construction, and the indoor air quality meets national environmental protection standards after renovation.

2. After the inspection and acceptance of the project, Party A may entrust the following nationally qualified testing institutions to conduct air quality testing if it is deemed necessary to test the indoor air quality. The testing cost shall be borne by Party A.

National Building Materials Testing Center - Indoor Environmental Testing Station

address:_________

phone:_________

3. The indoor ambient air testing project is “formaldehyde”, “benzene” and “tvoc”. The test data is listed in this contract. The “Environmental Testing Report” issued by the above-mentioned testing institutions with national qualifications shall prevail.

4. Party A agrees that the following conditions must be met when testing indoor air, otherwise the test results are invalid, and Party A is responsible for the unqualified indoor air quality.

4.1 The test shall be carried out without moving the furniture, without the installation of wooden floors, cabinets, etc.; all materials that have an impact on the environment in the room shall be the items on the quotation of the Party B and the items on the increase and decrease, and shall be provided to Party B. .

4.2 If there are non-Party B construction projects or projects that have not been constructed in writing with Party B, the test results are invalid.

4.3 The inspection time shall be carried out ____________ days after the completion of the testable construction. During this period, the room must be ventilated 24 hours a day, and the floor drain and the down pipe shall be closed with a covering.

4.4 The test shall be carried out by the full-time staff of Party B, the professional staff of the testing center, and the customer in the presence of the three parties. The test conducted in this case is considered valid.

4.5 In accordance with the provisions of this contract, there are other necessary conditions such as indoor and outdoor air conditions and temperature required by the national qualification testing agency.

5, the main reason for the indoor air failure due to renovation is the use of environmentally unqualified materials, so if the indoor air is not qualified, first of all, look for the reasons for using the materials. Party A and Party B shall first jointly search for the materials in the inspection project. If the circumstances or behaviors of Articles 4.1 and 4.2 of this contract are found, Party A shall be responsible for the unqualified indoor air quality. If the circumstances or behavior of Clauses 4.1 and 4.2 of this Agreement are not found, the materials used for decoration shall be the materials promised and provided by Party B, and Party B shall be responsible for the responsibility.

6. Reasons for unqualified indoor air quality In addition to decoration pollution, there are pollutions such as building main bodies and furniture. Party B does not assume any responsibility for pollution other than decoration and decoration.

7. If the indoor air is unqualified due to Party B's reasons, Party B shall solve the following steps:

7.1 For comprehensive management, the term of governance is one month, and the delayed delivery due to governance is regarded as the extension of the project. Party B will bear the liquidated damages on the basis of the contract price of 3 baht per day. The time before the inspection agency issues the test report is not counted as an extension of the project.

7.2 After the completion of the treatment, after detecting that the indoor air is still not up to standard, Party B shall return the order for Party A, and refund Party A to pay all construction funds.

7.3 After Party B returns Party A to all construction funds, the contract is automatically terminated and Party B no longer has other responsibilities.

8. Since the content of harmful substances in indoor air will be less and less volatile, there is no shelf life of air quality.

9. This contract must be signed at the same time as the construction contract to be effective. Party B has the final right to interpret this contract.

10. This contract is made in two copies. Party A and Party B each hold one copy.

person A person B:_________

_________ year ____ month _ day _________ year ____ month ____ day