Equipment relocation agreement
Party A: _________
Party B: _________
In order to properly use the equipment relocation costs, the equipment relocation work was completed safely and smoothly, and the following agreements were reached through careful consultation between Party A and Party B.
1. Party A agrees that the finished product warehouse, drying cylinder, batcher, powder tank, and other equipment shall be transferred to Party B for relocation. After Party B receives the notice from Party A, the hoisting and transporting vehicles shall enter the designated venue of Party A within 3 days. Party B shall bear the hoisting work of all equipment after Party B's crane enters the scene.
2. Party A intends to lend the use fee of the crane and the transportation board for the above work of the equipment to Party B at one time.
3. In order to encourage Party B to actively cooperate and pull the equipment out of the construction site as soon as possible, the two parties agreed that Party A will issue a certain amount of coordination fee to Party B, and Party B shall not make any difficulty, no matter how long it lasts, Party B must do its utmost to The equipment is loaded into the car at the fastest speed, and the goods carried by itself are transported out of the disassembly site. Based on the additional responsibilities of Party B mentioned above, Party A shall give Party B a coordination fee of _________ yuan in total. This fee is forbidden by Party B.
4. After loading and unloading the site, Party B will ensure that it will be shipped to Party A's unloading site within ______ days. Due to unexpected factors such as climate, it may be postponed as appropriate.
5. Party A shall contribute a total of _________ yuan to Party B as the funds needed to travel through the bridge.
6. Party A shall not be responsible for Party B's driver's accommodation and Party B's vehicle maintenance fee.
7. Party A provides the “Loading List”, and Party B will carry it according to the loading list. Party B must select suitable cranes, pallet trucks and trucks and transport them according to the route designated by Party A to ensure the safety of equipment during lifting and transportation. If Party B does not damage the equipment caused by Party A's designated route and speed, Party B shall compensate according to the actual damage estimate.
8. Crane, board and truck costs and payment
Party B shall bear the total amount of personnel and transportation expenses of _________ yuan.
Fee payment method: After all the hanging and transport vehicles of Party B enter the venue, Party A prepays _________ yuan as the starting capital. After all the carts and trucks are loaded, Party A will pay _________ yuan, and the remaining _________ Yuan will wait until Party B delivers the goods to their destination and pays them once.
Other explanations: After Party B takes Party A's equipment to its destination and safely unloads the goods, Party A's receiving personnel will issue a certificate of completion of transportation, which will be used as the final settlement basis.
9. For matters not covered by this Agreement, Party A and Party B shall separately negotiate a supplementary agreement. The Supplementary Agreement has the same effect as this Agreement. 10. This Agreement is in quadruplicate and each party shall hold two copies. The signature of the parties shall automatically take effect from the date of signature and seal, and the contract shall be invalid after payment.
person A person B:_________
Legal representative: _________ Legal representative: ______
_________ year ____ month _ day _________ year ____ month ____ day
Place of signing: _________ Signing location: _________
recommended article
- Lighter processing installation contract
- Computer maintenance agreement
- LOGO Design Registration Agreement
- House demolition entrustment contract
- Car maintenance contract
- Contract (including transportation)
- Contract
- Parking contract
- Jingmen City residential decoration and construction project construction contract
- Mud painting contract
- Maintenance contract
- International tanker charter contract
popular articles
- Qq space mood phrase
- Taizai’s famous sayings
- Tao Xingzhi's famous sayings
- Decoration contract demonstration text
- Korean swear words
- Construction and installation engineering construction contract
- Print production contract
- Thanks to the friend's words 2019
- The latest high school inspirational maxim
- About building a ship contract
- I want to say something to the teacher.
- English famous words
- Injured sentence
- Bing Xin’s famous words
- Teacher's famous saying
- Pump repair contract
- Repair repair contract
- a good saying that loves labor
- Strong words
- Sad love sentence 2019
- Sample of the processing agreement (light industry)
- Processing contract model
- Describe the fast time sentence 2019
- Contract
- Classical life motto
- Deaf people jingle 2019
- Du Yuexi's famous sayings
- College entrance examination inspirational quotes
- Commissioned production contract model
- 2014 is very touching words