Heald contract
Client: _____ Textile Equipment Factory Contractor: __ Electroplating Factory
1. Processed items, product names, specifications ____ quantity ____ price, delivery date:
┌──┬──────┬───┬────┬────┬────┬─────┐
│Project│Product Name, Regulation│Unit │ Quantity │ Unit Price │ Total Price │ Delivery Date │
│ │格 │ │ │ │×├──┬──┤
│ │ │ │ │ │ │ 季季│二季│
│ │ │ │ │ │ │ Degree │ Degree │
├──┼──────┼───┼────┼────┼────┼──┼──┤
│ galvanized │ comprehensive frame 1600mm to │ only │100,000 │ 0.15 │15,000 million │5 million │5 million │
│ │上 │ │ │ │ │ │ │ │
├──┼──────┼───┼────┼────┼────┼──┼──┤
│Quenching │ Full │ │ │1 million │ 0.11 │110000 │500,000 │500,000 │
├──┼──────┼───┼────┼────┼────┼──┼──┤
│ │ │ │ │ │ │ │ │ │
├──┼──────┴───┴────┴────┴────┴──┴──┤
│Total │ 贰 贰 万 万 thousand yuan │
└──┴───────────────────────────────┘
2. Quality standard: Party B shall process according to the technical requirements and quality standards specified by Party A's drawings. The processing parts provided by Party A during the processing and transportation process are allowed to damage ___, but the damaged parts must be returned to Party A.
3. Raw material supply: The zinc block for processing is supplied by Party A.
4. Delivery method: Party B is responsible for the round-trip transportation, and the freight is borne by Party B.
5. Quality acceptance method: After completion of processing, Party A shall accept the quality according to the quality standard.
6. Settlement method: through bank collection.
7. Liability for breach of contract: Party A entrusts Party B to process galvanizing, quenching, etc. Party B shall complete the work according to the specified date; Party B shall bear Party A's economic losses within the time limit, and shall pay a fine of ___ per day for the total value of processed products. Party A fails to deliver Party B's processed goods according to the specified time and quantity, thus causing Party B's loss of work stoppage and compensation shall be based on actual losses.
Party A: ______ Textile Equipment Factory Party B: ____ Electroplating Factory Legal Representative: Legal Representative:
Address: _______ Address: _______
Bank account number: ______ Bank account number: _____
____year month day
1. Processed items, product names, specifications ____ quantity ____ price, delivery date:
┌──┬──────┬───┬────┬────┬────┬─────┐
│Project│Product Name, Regulation│Unit │ Quantity │ Unit Price │ Total Price │ Delivery Date │
│ │格 │ │ │ │×├──┬──┤
│ │ │ │ │ │ │ 季季│二季│
│ │ │ │ │ │ │ Degree │ Degree │
├──┼──────┼───┼────┼────┼────┼──┼──┤
│ galvanized │ comprehensive frame 1600mm to │ only │100,000 │ 0.15 │15,000 million │5 million │5 million │
│ │上 │ │ │ │ │ │ │ │
├──┼──────┼───┼────┼────┼────┼──┼──┤
│Quenching │ Full │ │ │1 million │ 0.11 │110000 │500,000 │500,000 │
├──┼──────┼───┼────┼────┼────┼──┼──┤
│ │ │ │ │ │ │ │ │ │
├──┼──────┴───┴────┴────┴────┴──┴──┤
│Total │ 贰 贰 万 万 thousand yuan │
└──┴───────────────────────────────┘
2. Quality standard: Party B shall process according to the technical requirements and quality standards specified by Party A's drawings. The processing parts provided by Party A during the processing and transportation process are allowed to damage ___, but the damaged parts must be returned to Party A.
3. Raw material supply: The zinc block for processing is supplied by Party A.
4. Delivery method: Party B is responsible for the round-trip transportation, and the freight is borne by Party B.
5. Quality acceptance method: After completion of processing, Party A shall accept the quality according to the quality standard.
6. Settlement method: through bank collection.
7. Liability for breach of contract: Party A entrusts Party B to process galvanizing, quenching, etc. Party B shall complete the work according to the specified date; Party B shall bear Party A's economic losses within the time limit, and shall pay a fine of ___ per day for the total value of processed products. Party A fails to deliver Party B's processed goods according to the specified time and quantity, thus causing Party B's loss of work stoppage and compensation shall be based on actual losses.
Party A: ______ Textile Equipment Factory Party B: ____ Electroplating Factory Legal Representative: Legal Representative:
Address: _______ Address: _______
Bank account number: ______ Bank account number: _____
____year month day
recommended article
- Parking contract
- LOGO Design Registration Agreement
- Lighter processing installation contract
- Mud painting contract
- International tanker charter contract
- House demolition entrustment contract
- Contract (including transportation)
- Maintenance contract
- Jingmen City residential decoration and construction project construction contract
- Contract
- Car maintenance contract
- Computer maintenance agreement
popular articles
- Thanks to the friend's words 2019
- Construction and installation engineering construction contract
- Sad love sentence 2019
- Teacher's famous saying
- College entrance examination inspirational quotes
- Classical life motto
- 2014 is very touching words
- Contract
- Describe the fast time sentence 2019
- About building a ship contract
- Strong words
- Bing Xin’s famous words
- Print production contract
- Deaf people jingle 2019
- Taizai’s famous sayings
- Processing contract model
- Repair repair contract
- Decoration contract demonstration text
- Sample of the processing agreement (light industry)
- Korean swear words
- Tao Xingzhi's famous sayings
- English famous words
- Qq space mood phrase
- The latest high school inspirational maxim
- a good saying that loves labor
- Du Yuexi's famous sayings
- I want to say something to the teacher.
- Commissioned production contract model
- Injured sentence
- Pump repair contract