Processing, ordering contract (2)
Contract number: ______
Date of signing: January 19th
for
After ................................. Both parties negotiated and signed this contract and jointly abide by it.
need
One,
┌────┬─────┬──┬──┬──┬──┬───────────┐
││ │││││ Delivery time │
│ Product Name │ Specification Quality │ Unit │ Unit Price │ Quantity │ Amount ├──┬──┬──┬──┤
││ ││││││││││
├────┼─────┼──┼──┼──┼──┼──┼──┼──┼──┤
││ ││││││││││
├────┼─────┼──┼──┼──┼──┼──┼──┼──┼──┤
││ ││││││││││
├────┼─────┼──┼──┼──┼──┼──┼──┼──┼──┤
││ ││││││││││
├────┼─────┼──┼──┼──┼──┼──┼──┼──┼──┤
││ ││││││││││
├────┴─────┴──┴──┴──┴──┴──┴──┴──┴──┤
│ payment total RMB │
└──────────────────────────────────┘
two,
1. Quality Standard:___________________________
2. Delivery, transportation methods and location: _____________________
3. Packaging requirements and cost burden: ______________________
4. Settlement method and term: ________________________
5. Special matters: ___________________________
three,
1. After the signing of this contract, it has legal effect. If one party needs to change, interrupt or revoke this contract for any reason, it is limited to notify the other party within five days after the accident. Both parties should immediately negotiate and form an agreement. Important products are reported to the competent department for the record.
2. If one party fails to perform the provisions of the contract, the contract management authority shall make a ruling in accordance with the provisions of the state contract, and the defaulting party shall bear the economic responsibility and compensate the other party for the loss.
3. When both the supply and demand sides are unable to perform the contract due to the irresistible human disaster and the reasons caused by the enterprise itself, the contract management authority can verify that it can be exempted from economic responsibility.
4. Other unfinished items, additional sub-files.
4. This contract shall be in one copy, one for each party, the bank for deposit, and one for the competent authority.
┌────────────────────────────────────┐
│Supply: │Requires: │
│ ││
│Corporate photo number: │Corporate photo number: │
│ ││
│ Account Bank Account Number: │ Account Bank Account Number: │
│ ││
│Corporate leader: │Corporate leader:│
│ ││
│Representative: │Representative: │
└────────────────────────────────────┘
Date of signing: January 19th
for
After ................................. Both parties negotiated and signed this contract and jointly abide by it.
need
One,
┌────┬─────┬──┬──┬──┬──┬───────────┐
││ │││││ Delivery time │
│ Product Name │ Specification Quality │ Unit │ Unit Price │ Quantity │ Amount ├──┬──┬──┬──┤
││ ││││││││││
├────┼─────┼──┼──┼──┼──┼──┼──┼──┼──┤
││ ││││││││││
├────┼─────┼──┼──┼──┼──┼──┼──┼──┼──┤
││ ││││││││││
├────┼─────┼──┼──┼──┼──┼──┼──┼──┼──┤
││ ││││││││││
├────┼─────┼──┼──┼──┼──┼──┼──┼──┼──┤
││ ││││││││││
├────┴─────┴──┴──┴──┴──┴──┴──┴──┴──┤
│ payment total RMB │
└──────────────────────────────────┘
two,
1. Quality Standard:___________________________
2. Delivery, transportation methods and location: _____________________
3. Packaging requirements and cost burden: ______________________
4. Settlement method and term: ________________________
5. Special matters: ___________________________
three,
1. After the signing of this contract, it has legal effect. If one party needs to change, interrupt or revoke this contract for any reason, it is limited to notify the other party within five days after the accident. Both parties should immediately negotiate and form an agreement. Important products are reported to the competent department for the record.
2. If one party fails to perform the provisions of the contract, the contract management authority shall make a ruling in accordance with the provisions of the state contract, and the defaulting party shall bear the economic responsibility and compensate the other party for the loss.
3. When both the supply and demand sides are unable to perform the contract due to the irresistible human disaster and the reasons caused by the enterprise itself, the contract management authority can verify that it can be exempted from economic responsibility.
4. Other unfinished items, additional sub-files.
4. This contract shall be in one copy, one for each party, the bank for deposit, and one for the competent authority.
┌────────────────────────────────────┐
│Supply: │Requires: │
│ ││
│Corporate photo number: │Corporate photo number: │
│ ││
│ Account Bank Account Number: │ Account Bank Account Number: │
│ ││
│Corporate leader: │Corporate leader:│
│ ││
│Representative: │Representative: │
└────────────────────────────────────┘
recommended article
- House demolition entrustment contract
- Car maintenance contract
- Jingmen City residential decoration and construction project construction contract
- Computer maintenance agreement
- LOGO Design Registration Agreement
- Mud painting contract
- Parking contract
- International tanker charter contract
- Maintenance contract
- Contract
- Lighter processing installation contract
- Contract (including transportation)
popular articles
- Sad love sentence 2019
- Bing Xin’s famous words
- Taizai’s famous sayings
- College entrance examination inspirational quotes
- Qq space mood phrase
- Strong words
- Processing contract model
- Construction and installation engineering construction contract
- Thanks to the friend's words 2019
- English famous words
- Repair repair contract
- Print production contract
- Contract
- The latest high school inspirational maxim
- a good saying that loves labor
- Injured sentence
- Du Yuexi's famous sayings
- Korean swear words
- Commissioned production contract model
- Teacher's famous saying
- Pump repair contract
- I want to say something to the teacher.
- Deaf people jingle 2019
- 2014 is very touching words
- Sample of the processing agreement (light industry)
- Tao Xingzhi's famous sayings
- Classical life motto
- Describe the fast time sentence 2019
- About building a ship contract
- Decoration contract demonstration text