Engineering contract
_________________________
__________________________
Party B undertakes Party A's ________ project. In order to ensure the quality, safety and construction period of the project, the following agreements are reached after consultation between the two parties:
First, the amount of engineering
1. ___________________________.
2. ___________________________.
3. ___________________________.
4. ___________________________.
Second, the engineering requirements
??1. ___________________________.
??2. ___________________________.
??3. ___________________________.
??4. ___________________________.
?? 5. ___________________________.
Third, Party A's scope of responsibility
??1. ___________________________.
??2. ___________________________.
??3. ___________________________.
Fourth, the scope of responsibility of Party B
1. ___________________________.
2. ___________________________.
3. ___________________________.
V. Technical requirements
1. ___________________________.
2. ___________________________.
3. ___________________________.
6. Duration, acceptance procedure and warranty period
1. Construction period: completed within ________ days from the date of commencement of construction, each day of delay, deducting _____% of Party B's construction cost.
2. Upon completion of each process, Party B shall notify Party A one day in advance, and the next process shall be carried out after the acceptance is passed. Otherwise, the process shall be regarded as unoccupied, and will be directly deducted from the project payment at the time of settlement.
3. Warranty period: Warranty period _____ years, _____% paid to the project payment after acceptance, leaving ____% warranty: various problems caused by Party B's construction quality and raw material quality during the warranty period, Party B repairs free of charge or replace.
Seven, other requirements
1. During the construction, Party B shall accept the on-site construction supervision of the project leader of Party A.
2. Party B shall abide by Party A's safety regulations during construction and sign a safe and civilized construction agreement. The responsibility for the unsafe accident caused by Party B shall be borne by Party B.
3. During the construction of Party B, Party A's production facilities and equipment shall not be damaged. If there is any damage, Party B must repair it without compensation.
4. The parties have not resolved the matter through negotiation.
5. This Agreement, as a subsidiary file of the contract, has the same legal effect as the contract.
Party A: ___________________
Party B: ___________________
date:___________________
recommended article
- Parking contract
- Contract (including transportation)
- Jingmen City residential decoration and construction project construction contract
- Computer maintenance agreement
- Car maintenance contract
- International tanker charter contract
- Contract
- Maintenance contract
- LOGO Design Registration Agreement
- House demolition entrustment contract
- Lighter processing installation contract
- Mud painting contract
popular articles
- Contract
- Deaf people jingle 2019
- Teacher's famous saying
- Du Yuexi's famous sayings
- 2014 is very touching words
- Decoration contract demonstration text
- Strong words
- Sad love sentence 2019
- English famous words
- Bing Xin’s famous words
- About building a ship contract
- Injured sentence
- Processing contract model
- Construction and installation engineering construction contract
- Tao Xingzhi's famous sayings
- Describe the fast time sentence 2019
- Commissioned production contract model
- I want to say something to the teacher.
- Repair repair contract
- Korean swear words
- College entrance examination inspirational quotes
- Taizai’s famous sayings
- Pump repair contract
- Classical life motto
- Qq space mood phrase
- Thanks to the friend's words 2019
- Sample of the processing agreement (light industry)
- a good saying that loves labor
- Print production contract
- The latest high school inspirational maxim