Fan Wen Daquan > Contract Model > Contract Model

Equipment repair contract


____________ Co., Ltd. and ___________ company have negotiated in good faith and hereby enter into the following terms:

Article 1 defines the “acceptance manual” as a file provided by the contractor and confirmed by both parties for the parties to verify that the repaired equipment meets the technical specifications and the required data standards.

“Regulated Information” means the drawings, data and other materials necessary to implement this Agreement in connection with the System.

“Defect or defect” means that the equipment does not meet the relevant requirements of the acceptance manual.

“On-site acceptance” is the final acceptance of the repaired equipment by the designated manufacturer in accordance with the acceptance manual.

“Technical Specifications” means the Schedules of this Agreement. Article 2 Repair Project Contents Equipment performance must comply with the specified performance, meet the technical specifications and specified data standards, and submit all applicable drawings, data and other necessary drawings. Technical Information. During the work period, the contractor shall accept the necessary supervision and inspection by the contracting party.

The contractor shall prepare and submit a copy of the draft acceptance manual ______ for the _______ year ______ month _____. The acceptance manual shall be reviewed and agreed to by the ordering party within ____ days.

In the main body of this Agreement, if it is inconsistent with the provisions of the subsidiary file, the provisions of the main body of this Agreement shall prevail. If the acceptance manual is inconsistent with the technical specifications or the specified information, the technical specifications and regulations shall prevail.

Article 3 Repair Fee Article 4 After the receipt of the invoice from the contractor, the payment must be paid to the contractor for the following period:

After the equipment is repaired and tested, if it is qualified after one month, the fixed party shall pay RMB ______ million in one lump sum.

Article 5 The delivery and acceptance contractor shall complete the repair and commissioning of the equipment by ____ ______ month ______ day; and complete the inspections specified in the acceptance manual; at the same time, the contractor shall accept the equipment. The document is signed to prove that the test has been completed. The acceptance document shall indicate the defects that are recognized by both parties and which shall be corrected by the contractor during the period agreed by both parties.

On-site acceptance shall take place on the _______ year ______ month ___ day.

Article 6 Changes Any changes to the body or schedule of this contract from the date of entry into force of this contract must be made in writing detailing the changes to the technical specifications, price, performance, design, acceptance date, delivered or impending delivery of spare parts. The replacement performance and the impact of other significant matters of this Agreement shall be signed by both companies.

In order to repair or improve the equipment, the contractor may make minor changes or corrections to the technical specifications as long as such changes do not seriously affect the total purchase price, functional characteristics, performance, and replacement performance of the spare parts.

Article 7 The warranty contractor guarantees that the equipment will not meet the technical specifications due to defects in equipment materials and processes, as well as imperfect design.

If the equipment and components fail from the date of signing the site acceptance, if the fault occurs within half a year, the contractor shall be responsible for the exchange or repair within ______ days of receipt of the notice of the ordering party, and the costs incurred shall be borne by the contractor. bear.

If the contractor fails to perform the above warranty obligations, it shall bear all losses caused by the contracting party.

Article 8 Others This Agreement is a complete agreement between the parties and all previous representations, negotiations, letters, undertakings, agreements, negotiations and contracts of the parties or their agents for any matter or thing to which this Agreement applies or is, whether in writing Or the verbal, they are revoked.

The contractor’s contract

recommended article

popular articles