Domestic civil ship repair standard contract
Numbering:_________
Contracting unit:
_________
_________
Party A shall appoint Party B to repair the _________ project, and the contract shall be concluded in _________ on _________ _________ month _________. Keep altogether.
First, the scope of the project:
Party B shall be the basis for the repair of the ship after being signed by both parties in accordance with the "Repair Engineering List" provided by Party A.
Second, the project price:
According to the "Repair Engineering List", the price is temporarily priced at RMB ______ yuan, and is settled by actual acceptance after completion.
Third, the project date:
Start date _________ year _________ month ______ day; completion date: _________ year _________ month _________ day; repair period is _________ days, of which the number of days in the dock is _________ days.
Fourth, plus, reduce the project:
1. The billing project shall be submitted to Party B for approval by Party A in writing within one quarter of the repair cycle after the start of construction. The total crediting project does not exceed 10% of the repair cost, and the repair cycle does not change when the individual project does not affect the total repair cycle.
2. Party A proposes a billing project after one quarter of the repair cycle after the start of construction. The repair price and repair cycle are separately agreed and a supplementary agreement is signed.
3. The deduction project shall be submitted to Party B for approval by Party A in writing. If Party B has incurred costs for Party A's debiting project, Party A shall bear the cost.
V. Speed repair fee and reward and punishment standards:
1. On time, Party A will pay Party B's quick repair fee as _________% of the actual repair fee;
2. Completion in advance, each day in advance, the speed of repairs increases the actual repair fee by _________%, but not more than _________% of the actual repair fee;
3. Delayed completion, due to Party B's failure to complete the work on time, Party B pays Party A a fine. The penalty for each day of delay is _________% of the actual repair fee, but not more than _________% of the repair fee.
Sixth, project quality:
1. Party B is responsible for the quality of the project: the quality guarantee period of the moving parts is three months, and the fixed parts are six months;
2. If the faults and losses caused by the quality of the accessories and equipment provided by Party A are caused by Party A, Party A shall be responsible.
Seven, repair fee checkout:
1. Advance payment and progress payment
After the signing of this contract, Party A shall pay Party B the following advance payment and progress payment according to the overall progress of the project; after the signing of this contract, the prepayment of _________% of the total price of the project shall be paid _________ yuan; when the progress reaches _________%, Pay the total price of the project _________% of the progress payment _________ yuan; when the progress reaches _________%, pay the total price of the project _________% of the progress payment _________ yuan; when the progress reaches _________%, pay the total project price _________ % progress payment _________ yuan.
2. Settlement
Party B shall deposit with the bank of the bank by Party B with the statement bank. Party A shall pay the balance in one lump sum no later than seven days after receiving the repair order from Party B. If Party A has objection to the bill, it shall pay 90% of the total project price and notify Party B to check the objection point. If Party A needs to check the project, Party B shall provide convenience. The balance should be settled as soon as the check is clear.
Eight, other matters:
1. During the repair of the ship, Party A shall not hire a labor force to carry out repairs related to the project.
2. During the repair of the ship, Party B shall support the crew of Party A in self-study without affecting the construction of Party B. However, Party A must notify Party B in writing of the self-repair project and schedule before the commencement of the ship repair project.
3. If Party B needs to borrow the relevant drawings and technical materials of the ship when repairing the ship, Party B shall provide it to Party A in writing, and Party A shall strongly support it.
4. If the parts and equipment provided by Party A cannot arrive at the factory on time, or if the information provided by Party A is in error and affects the construction of Party B, Party A shall bear the responsibility and the repair period shall be postponed.
5. "China Shipbuilding Corporation Ship Repair Standard Clause" is an integral part of this contract.
6. Any dispute arising from or in connection with this contract shall be submitted to the China Maritime Arbitration Commission for arbitration in accordance with the arbitration rules currently in force at the time of applying for arbitration. The arbitral award is final and binding on both parties.
7. Other unfinished matters are negotiated by the two parties to add additional terms.
9. This contract shall come into effect on the date of signature by both parties.
X. The original of this contract is in duplicate, and each party holds a copy.
person A person B
Seal: _________ Seal: _________
Signature of the representative: _________ Signature of the representative: _________
Address: _________ Address: _________
Phone: _________ Phone: _________
Bank of deposit: _________ Bank of deposit: _________
Account number: _________ Account number: _________
_________Year ____________________________________________
recommended article
- Parking contract
- Mud painting contract
- Maintenance contract
- International tanker charter contract
- Jingmen City residential decoration and construction project construction contract
- House demolition entrustment contract
- LOGO Design Registration Agreement
- Computer maintenance agreement
- Contract (including transportation)
- Car maintenance contract
- Contract
- Lighter processing installation contract
popular articles
- Repair repair contract
- Teacher's famous saying
- Decoration contract demonstration text
- Construction and installation engineering construction contract
- English famous words
- The latest high school inspirational maxim
- a good saying that loves labor
- College entrance examination inspirational quotes
- Qq space mood phrase
- 2014 is very touching words
- Classical life motto
- Korean swear words
- Commissioned production contract model
- Print production contract
- Describe the fast time sentence 2019
- Bing Xin’s famous words
- Taizai’s famous sayings
- Tao Xingzhi's famous sayings
- About building a ship contract
- I want to say something to the teacher.
- Sad love sentence 2019
- Du Yuexi's famous sayings
- Thanks to the friend's words 2019
- Deaf people jingle 2019
- Sample of the processing agreement (light industry)
- Contract
- Processing contract model
- Injured sentence
- Strong words
- Pump repair contract