Shanghai home central air conditioning system installation contract (official model)
Principal: _______________
Undertaker: _______________
Special notice
1. The text of this contract is a model text formulated in accordance with the "Contract Law of the People's Republic of China", the "Regulations on the Supervision of Shanghai Contract Format Terms" and relevant laws and regulations, which shall be agreed upon by both parties. Please read carefully before signing the contract.
Second, the installation of home central air conditioning system, professional, and long contractual performance period. In order to better protect the legitimate rights and interests of both parties, the parties should be cautious when signing the contract, and strive to be specific, comprehensive and rigorous.
3. If Party A entrusts Party B to design the installed central air-conditioning system before installation, Party B's design plan shall be confirmed by Party A.
Fourth, the warranty period of the home central air-conditioning mainframe is implemented according to the standards of the equipment manufacturer.
5. The payment method prescribed in this contract shall, in principle, be paid in accordance with the progress and proportions stipulated in the contract. If there is a special agreement between Party A and Party B, they can be stated in the contract.
6. The text of this contract shall be formulated by the Shanghai Household Electrical Appliances Industry Association and supervised by the Shanghai Administration for Industry and Commerce. No unit or individual may reproduce it without authorization.
Shanghai home central air conditioning system installation contract
Contract number: ______________
place of signing:______________
Principal: __________
Undertaker: __________
According to the "Contract Law of the People's Republic of China" and the relevant laws and regulations, combined with the characteristics of the installation and construction of the central air-conditioning system in the home, after friendly negotiation between the two parties, Party A entrusted Party B to undertake the construction of the central air-conditioning system for the home, and reached the following agreement. obey together.
I. Project Overview
1. project name:_________________________
2. Project address:_________________________
3. Party A or trusted contact: ___________ Phone: ____________
4. Unit provided by Party A
The outdoor unit:
Serial number, brand name, number of models
l _______________________
2 _______________________
3 _______________________
4 _______________________
5 _______________________
Indoor unit:
Serial number, brand name, number of models
1 _______________________
2 _______________________
3 _______________________
4 _______________________
5 _______________________
6 _______________________
7 _______________________
8 _______________________
Second, the construction period
From the ________________________________________________________________________________________________________________________________________________________________________________________ After the completion of the decoration project, the system commissioning and completion acceptance will be carried out.
Third, construction management
l. Party B shall carry out the construction according to the design plan confirmed by Party A.
2. Party A shall, before the construction of Party B, receive the water and power supply matching the unit to the position required by Party B to install the indoor and outdoor units.
3. Party A shall be responsible for removing obstacles on the construction site before the construction of Party B, so that the site has construction conditions.
4. If the construction drawing and the installation position of the outdoor unit are to be approved by the fire protection, environmental protection and property departments, Party A shall be responsible for handling the relevant costs.
5. During the construction period of Party B, the regulations of relevant departments such as fire protection, environmental protection, security, and property shall be observed.
Fourth, the project cost
1. The total installation cost of this contract is RMB ________ yuan.
2. If the design is changed due to Party A's reasons, the materials should be increased or decreased, and the total price should be changed accordingly. Therefore, the unrated materials, labor costs, etc., are settled according to the increase and decrease. The specific price changes will be signed by the two parties after the agreement.
V. Payment method
1. After the contract is signed, Party A will pay l0% of the total contract price of Party B, which is RMB ______ yuan.
2. When the materials come into play, Party A will pay 40% of the total contract price of Party B, which is RMB ________ yuan.
3. If the concealed project is qualified, Party A will pay 40% of the total contract price of Party B, which is RMB _______ yuan.
4. After the completion of the project is completed and accepted, Party A shall pay 10% of the total contract price of Party B, which shall be RMB _______ yuan.
5. Both parties shall issue a receipt for the payment of the money. After the project is completed and accepted, Party B shall issue a unified invoice to Party A.
Sixth, project quality and acceptance
1. The copper pipe, air duct material, pipe material, thermal insulation material and control components guaranteed by Party B are accompanied by the company's product qualification certificate.
2. After the installation of the concealed project is completed, both Party A and Party B shall go through the inspection and acceptance procedures, and both Party A and Party B shall sign the “Concealed Project Acceptance Record Sheet”. At the time of acceptance, Party B shall notify Party A 2 days in advance, and Party A shall accept the acceptance within 2 days after receiving the notice.
3. After the completion of the rehearsal project, Party A shall notify Party B within 2 days of completion and acceptance of the installation of the central air-conditioning system for the household; Party B shall organize the acceptance within days after receiving the notice.
4. After the completion of the acceptance, Party A and Party B signed the “Completion Acceptance Record Sheet”. Party B shall implement the warranty for the installed project, the warranty period is 1 year, and the pipeline tuyere is guaranteed for 2 years from the date of completion of the acceptance and the date of invoicing.
5. After the completion of the project, Party B shall provide Party A with one copy of the completed drawings.
6. The construction specifications and project completion acceptance criteria shall be in accordance with the corresponding specifications formulated by the Shanghai Household Electrical Appliances Industry Association's Home Central Air Conditioning Professional Committee.
Seven, dispute handling methods
1. Due to the quality of the project, when disputes arise between the two parties, the text of this contract and the unified invoice issued by the construction enterprise may apply to the Shanghai Household Electrical Appliances Industry Association Home Central Air Conditioning Professional Committee for mediation, or may complain to the city or the district or county consumer association.
2. If the parties are unwilling to resolve through negotiation or mediation, or if negotiation or mediation cannot be resolved, the following method shall be selected:
Apply to the Shanghai Arbitration Commission for arbitration.
File a lawsuit in the people's court.
Eight, liability for breach of contract
1. If Party A changes the design or Party A does not have the construction conditions, resulting in delays in the construction period, Party A shall pay Party A RMB to the Party B for every one day delay.
2. If Party B fails to complete the work due to overdue period, Party B shall pay Party A in accordance with Party A's accumulated payment amount of ____%.
3. If the completion of the completion acceptance is unqualified, if Party B fails to comply with the requirements of the “Standards for the Acceptance of Construction Quality of Household Central Air Conditioning”, Party B must rework without compensation and bear the responsibility for the loss caused by rework and overdue completion; For reasons caused by the design, Party A shall be held accountable for the responsibility of the party; if it is due to equipment, Party A shall be held accountable by the equipment supplier.
Nine, other
1. If there are any outstanding matters in this contract, the parties may sign a supplementary agreement through negotiation. The Supplementary Agreement is equally valid as this Agreement.
2. This Agreement is made in two copies, one for each of Party A and Party B.
person A person B:_______
Address: _____________ Address: _____________
Phone: _____________ Phone: _____________
Date: ___year__month__day date: ___year__month__day
Project budget
First, the material section
No. Material Name Specification Unit Price Unit Subtotal Remarks
1 ______________________________________
2 ______________________________________
3 ______________________________________
4 _________________________________________
5 ______________________________________
6 ______________________________________
7 ______________________________________
8 ______________________________________
9 ______________________________________
10 _________________________________________
Subtotal
Second, the installation fee
Serial number content price note
Subtotal
Third, other expenses
Serial number content price note
Subtotal
Total project price of RMB
Concealed project acceptance record
engineering______________________
name______________________
construction place__________________
Preface name installation location
test result
Installation quality
test result
Remarks
1 indoor unit
2 air supply pipe
3 insulation materials
4 steel pipe
5 insulation pipe
6 condensate pipe
7 static pressure box
8 soft connector
9 return air duct
10 return bellows
11 Concealed project content
12 Acceptance opinions
User units:________
user:______
_____year month day
Construction unit:________
representative:______
____year month day
Completion acceptance record
Work name division project
Project location _______ commencement date ____ year ____ month ____ day
Completion date _______ Date of inspection ____ year ____ month ____ day
Project content acceptance data
Ambient temperature c, indoor unit outlet temperature c, indoor unit return air temperature c,
The outdoor unit is installed with a solid copper pipe connection that cannot be leaked.
The outdoor unit and the indoor unit are energized and operate normally. The noise-free temperature controller is effective.
The size of each air supply port of the mouth meets the design requirements.
The return air duct is installed in the position of each air return port.
Construction workers:___________
Acceptance assessment comments:
User units:___________
user___________
______year month day
Construction unit:___________
representative___________
_____year month day
recommended article
- International tanker charter contract
- LOGO Design Registration Agreement
- Jingmen City residential decoration and construction project construction contract
- House demolition entrustment contract
- Contract
- Car maintenance contract
- Mud painting contract
- Lighter processing installation contract
- Computer maintenance agreement
- Maintenance contract
- Parking contract
- Contract (including transportation)
popular articles
- Korean swear words
- Construction and installation engineering construction contract
- Contract
- Strong words
- Describe the fast time sentence 2019
- Sad love sentence 2019
- Injured sentence
- College entrance examination inspirational quotes
- Commissioned production contract model
- English famous words
- About building a ship contract
- Deaf people jingle 2019
- Taizai’s famous sayings
- Print production contract
- Pump repair contract
- Du Yuexi's famous sayings
- Qq space mood phrase
- a good saying that loves labor
- Teacher's famous saying
- Processing contract model
- Classical life motto
- Repair repair contract
- Tao Xingzhi's famous sayings
- Thanks to the friend's words 2019
- Bing Xin’s famous words
- I want to say something to the teacher.
- 2014 is very touching words
- Sample of the processing agreement (light industry)
- Decoration contract demonstration text
- The latest high school inspirational maxim