Fan Wen Daquan > Contract Model > Contract Model

Shanghai home central air conditioning system installation contract (official model)


Principal: _______________

Undertaker: _______________

Special notice

1. The text of this contract is a model text formulated in accordance with the "Contract Law of the People's Republic of China", the "Regulations on the Supervision of Shanghai Contract Format Terms" and relevant laws and regulations, which shall be agreed upon by both parties. Please read carefully before signing the contract.

Second, the installation of home central air conditioning system, professional, and long contractual performance period. In order to better protect the legitimate rights and interests of both parties, the parties should be cautious when signing the contract, and strive to be specific, comprehensive and rigorous.

3. If Party A entrusts Party B to design the installed central air-conditioning system before installation, Party B's design plan shall be confirmed by Party A.

Fourth, the warranty period of the home central air-conditioning mainframe is implemented according to the standards of the equipment manufacturer.

5. The payment method prescribed in this contract shall, in principle, be paid in accordance with the progress and proportions stipulated in the contract. If there is a special agreement between Party A and Party B, they can be stated in the contract.

6. The text of this contract shall be formulated by the Shanghai Household Electrical Appliances Industry Association and supervised by the Shanghai Administration for Industry and Commerce. No unit or individual may reproduce it without authorization.

Shanghai home central air conditioning system installation contract

Contract number: ______________

place of signing:______________

Principal: __________

Undertaker: __________

According to the "Contract Law of the People's Republic of China" and the relevant laws and regulations, combined with the characteristics of the installation and construction of the central air-conditioning system in the home, after friendly negotiation between the two parties, Party A entrusted Party B to undertake the construction of the central air-conditioning system for the home, and reached the following agreement. obey together.

I. Project Overview

1. project name:_________________________

2. Project address:_________________________

3. Party A or trusted contact: ___________ Phone: ____________

4. Unit provided by Party A

The outdoor unit:

Serial number, brand name, number of models

l _______________________

2 _______________________

3 _______________________

4 _______________________

5 _______________________

Indoor unit:

Serial number, brand name, number of models

1 _______________________

2 _______________________

3 _______________________

4 _______________________

5 _______________________

6 _______________________

7 _______________________

8 _______________________

Second, the construction period

From the ________________________________________________________________________________________________________________________________________________________________________________________ After the completion of the decoration project, the system commissioning and completion acceptance will be carried out.

Third, construction management

l. Party B shall carry out the construction according to the design plan confirmed by Party A.

2. Party A shall, before the construction of Party B, receive the water and power supply matching the unit to the position required by Party B to install the indoor and outdoor units.

3. Party A shall be responsible for removing obstacles on the construction site before the construction of Party B, so that the site has construction conditions.

4. If the construction drawing and the installation position of the outdoor unit are to be approved by the fire protection, environmental protection and property departments, Party A shall be responsible for handling the relevant costs.

5. During the construction period of Party B, the regulations of relevant departments such as fire protection, environmental protection, security, and property shall be observed.

Fourth, the project cost

1. The total installation cost of this contract is RMB ________ yuan.

2. If the design is changed due to Party A's reasons, the materials should be increased or decreased, and the total price should be changed accordingly. Therefore, the unrated materials, labor costs, etc., are settled according to the increase and decrease. The specific price changes will be signed by the two parties after the agreement.

V. Payment method

1. After the contract is signed, Party A will pay l0% of the total contract price of Party B, which is RMB ______ yuan.

2. When the materials come into play, Party A will pay 40% of the total contract price of Party B, which is RMB ________ yuan.

3. If the concealed project is qualified, Party A will pay 40% of the total contract price of Party B, which is RMB _______ yuan.

4. After the completion of the project is completed and accepted, Party A shall pay 10% of the total contract price of Party B, which shall be RMB _______ yuan.

5. Both parties shall issue a receipt for the payment of the money. After the project is completed and accepted, Party B shall issue a unified invoice to Party A.

Sixth, project quality and acceptance

1. The copper pipe, air duct material, pipe material, thermal insulation material and control components guaranteed by Party B are accompanied by the company's product qualification certificate.

2. After the installation of the concealed project is completed, both Party A and Party B shall go through the inspection and acceptance procedures, and both Party A and Party B shall sign the “Concealed Project Acceptance Record Sheet”. At the time of acceptance, Party B shall notify Party A 2 days in advance, and Party A shall accept the acceptance within 2 days after receiving the notice.

3. After the completion of the rehearsal project, Party A shall notify Party B within 2 days of completion and acceptance of the installation of the central air-conditioning system for the household; Party B shall organize the acceptance within days after receiving the notice.

4. After the completion of the acceptance, Party A and Party B signed the “Completion Acceptance Record Sheet”. Party B shall implement the warranty for the installed project, the warranty period is 1 year, and the pipeline tuyere is guaranteed for 2 years from the date of completion of the acceptance and the date of invoicing.

5. After the completion of the project, Party B shall provide Party A with one copy of the completed drawings.

6. The construction specifications and project completion acceptance criteria shall be in accordance with the corresponding specifications formulated by the Shanghai Household Electrical Appliances Industry Association's Home Central Air Conditioning Professional Committee.

Seven, dispute handling methods

1. Due to the quality of the project, when disputes arise between the two parties, the text of this contract and the unified invoice issued by the construction enterprise may apply to the Shanghai Household Electrical Appliances Industry Association Home Central Air Conditioning Professional Committee for mediation, or may complain to the city or the district or county consumer association.

2. If the parties are unwilling to resolve through negotiation or mediation, or if negotiation or mediation cannot be resolved, the following method shall be selected:

Apply to the Shanghai Arbitration Commission for arbitration.

File a lawsuit in the people's court.

Eight, liability for breach of contract

1. If Party A changes the design or Party A does not have the construction conditions, resulting in delays in the construction period, Party A shall pay Party A RMB to the Party B for every one day delay.

2. If Party B fails to complete the work due to overdue period, Party B shall pay Party A in accordance with Party A's accumulated payment amount of ____%.

3. If the completion of the completion acceptance is unqualified, if Party B fails to comply with the requirements of the “Standards for the Acceptance of Construction Quality of Household Central Air Conditioning”, Party B must rework without compensation and bear the responsibility for the loss caused by rework and overdue completion; For reasons caused by the design, Party A shall be held accountable for the responsibility of the party; if it is due to equipment, Party A shall be held accountable by the equipment supplier.

Nine, other

1. If there are any outstanding matters in this contract, the parties may sign a supplementary agreement through negotiation. The Supplementary Agreement is equally valid as this Agreement.

2. This Agreement is made in two copies, one for each of Party A and Party B.

person A person B:_______

Address: _____________ Address: _____________

Phone: _____________ Phone: _____________

Date: ___year__month__day date: ___year__month__day

Project budget

First, the material section

No. Material Name Specification Unit Price Unit Subtotal Remarks

1 ______________________________________

2 ______________________________________

3 ______________________________________

4 _________________________________________

5 ______________________________________

6 ______________________________________

7 ______________________________________

8 ______________________________________

9 ______________________________________

10 _________________________________________

Subtotal

Second, the installation fee

Serial number content price note

Subtotal

Third, other expenses

Serial number content price note

Subtotal

Total project price of RMB

Concealed project acceptance record

engineering______________________

name______________________

construction place__________________

Preface name installation location

test result

Installation quality

test result

Remarks

1 indoor unit

2 air supply pipe

3 insulation materials

4 steel pipe

5 insulation pipe

6 condensate pipe

7 static pressure box

8 soft connector

9 return air duct

10 return bellows

11 Concealed project content

12 Acceptance opinions

User units:________

user:______

_____year month day

Construction unit:________

representative:______

____year month day

Completion acceptance record

Work name division project

Project location _______ commencement date ____ year ____ month ____ day

Completion date _______ Date of inspection ____ year ____ month ____ day

Project content acceptance data

Ambient temperature c, indoor unit outlet temperature c, indoor unit return air temperature c,

The outdoor unit is installed with a solid copper pipe connection that cannot be leaked.

The outdoor unit and the indoor unit are energized and operate normally. The noise-free temperature controller is effective.

The size of each air supply port of the mouth meets the design requirements.

The return air duct is installed in the position of each air return port.

Construction workers:___________

Acceptance assessment comments:

User units:___________

user___________

______year month day

Construction unit:___________

representative___________

_____year month day

recommended article