Field service staff report
Wang Qunshan
PositionCustomer service engineer
Entrance time
2001.6
No
20015026
Territorial Central China Debriefing time 2005.5.9-2005.5.21jobs
experience
Start and end time User name service product2001.6-2001.7
Guangshen Group
AC drive EMU DJJ1
2001.7-2001.10
Zhuzhou Electric Locomotive Works
Beijing Ring Railway
AC drive EMU DJF1 assembly and commissioning
Central Plains Star Performance Test and Evaluation
2001.10-2003.12
Zhengzhou Railway Bureau Zhengzhou Depot
AC drive EMU DJF1 service and on-site maintenance
2004.1- now
Zhengzhou Railway Bureau Zhengzhou Locomotive Depot and Depot
AC drive locomotives and EMU services as well as on-site repairs
Including Ou Xing, Jiufang, Tissot, the Light of the West and the Star of the Central Plains.
Review of the previous stage of work
K3 Logistics System
Use
K3 logistics system can timely, effectively and accurately report the demand of on-site parts to the department, and can accurately reflect the parts and the situation on the spot. However, due to frequent replacement of parts, some products have not been input in time. Application, and we also need to enter the warehouse, approve, out of the warehouse, and then approve. When returning, it is even more cumbersome. In the long run, the data is inevitably lost, which is inconvenient for on-site work.
The system is not particularly stable, often not going up; the speed is also very slow; and it can't be submitted after a lot of hard-working basic entry, taking up a lot of time.
Since we use the system often, especially as a librarian, the usage rate is higher, so I feel even more profound.
Quality information database
Use
We usually enter the quality information database in the spare parts that we usually replace on the locomotive, and carefully fill in the replacement parts processing process and processing results.
The feedback of the whole system to the on-site information can be timely and effective, but sometimes it is necessary to enter an infrequently used accessory. The model of the spare part cannot be found in the database, and it is hoped that the system function can be improved.
We often use this database and find that it still has the following defects: After logging in to the 8489 website, it can't enter the system smoothly; after entering the entry, it can't be submitted, and it needs to be written many times before it can succeed.
Product service capability
There are a total of 6 AC transmission locomotives in Zhengzhou, including 3 Austar locomotives, 2 Jiufang locomotives and 1 Tissot locomotive. At the same time, we also often participate in the service of the Western Light AC transmission freight locomotive.
Our products are mainly the core components of the locomotive. The key service target is the AC locomotive, which has been fully affirmed by the users. It has now operated 980,000 kilometers safely and will soon complete the assessment task issued by the Ministry of Railways.
However, because the product belongs to the experimental stage, the technology is still not very mature, so it is inevitable that failure will occur. In the process of adding and multiplying, timely, accurately and effectively solve the faults that occurred and guide the users, and timely report the problems and treatments to the department.
As the service person in charge of Zhengzhou AC drive products, in this case, I need to have a relatively complete knowledge structure and field experience. I also need to lead the service staff to work actively while doing the service. Everyone works very seriously. It has been approved and recognized by users, collaborative manufacturers, and related personnel.
For example: in December last year, the Austrian locomotive was normally towed on the way to Beijing. The capacitor exploded and caused the phase components to burn out. After the single frame was punctured to Beijing, it was detained. Zhengzhou Aoxing service personnel rushed to Beijing with the accessories at night. The locomotive's normal attendance plan was eliminated, and the locomotive attached to the locomotive was changed to temporary repair.
Also, in October last year, the Australian Star No. 1 locomotive was in the factory for the first time to go to Wuchang on the way to the bus. Timing personnel Wuchang warehousing inspection, found that all GTO components on the motor side are short-circuited, I immediately concluded from the circuit diagram: the possibility of all damage is very small, the above phenomenon may be caused by the damage of two GTO components on a phase component The three-phase windings are connected in parallel to each other, so that the above-mentioned malfunction phenomenon occurs.
So I immediately suggested removing the large motor wire and re-measuring it, damaging a total of three GTO components on the two phase components.
So I have judged according to the faults of the previous Austrian Star and the China Star: It is very likely that there is a phase-to-phase short circuit between the three windings of the motor in the factory, which causes damage to our main transformer. Therefore, I immediately sent people to Wuchang for inspection while reporting to the relevant personnel, and suggested that the Zhuzhou factory inspect and repair the motor.
In the end, I was convinced that the big line in the factory was short-circuited while the car was being parked. Both sides were repaired and completed within one day. They continued to go online and went to Beijing through Zhengzhou. This failure is treated as a repair.
There are many similar situations, and they are not listed one by one.
In normal times, I try my best to cooperate with the user's car inspection personnel to test the car several times, correct the user's bad psychology, dispel their concerns, so that they can work with confidence, so as to better serve the service.
User resource
User name
Name
Position
Contact method
Remarks
Due to the limitation of the template space, I will not list them one by one. I will use this item as a subsidiary file and post it on the last page of the debriefing report.
Quality Supervisor Evaluation:
signature:
Evaluation of the accessories supervisor:
signature:
The Minister of Service confirmed:
signature:
self
analysis
Where else can I be better?
Leadership and coordination
Professional technical level, communication ability, language ability
What can be done to create more value for the company?
Continue to work as a locomotive service, establish a "green shade service" brand, and publicize and maintain the content and spirit of the corporate culture of the Times Group.
Play a leading role, improve the cohesiveness and centripetal force of the group, improve the service level and overall strength of the service team as soon as possible, so that while doing the current work, it can also reserve the human resources for the company, which is conducive to future work arrangements.
What kind of knowledge can be learned to better improve your ability to work?
Business ability, communication ability
What action should I take now?
In the future work, I will, as always, carefully study the files issued by the department, conscientiously clarify the two major systems projects, accomplish three main bodies, pay attention to the four hot spots, understand the spirit of their archives, and combine their own work to clarify their own positioning and Development direction, unremittingly improve team cohesion and centripetal force, improve service quality, improve customer satisfaction, build a "green shade service" culture, and achieve the same fate with the group, accelerate the improvement of "green shade service", and make it as soon as possible It has become the communication carrier, industry standard and human resource base of “Time Brand” to jointly build the core competitiveness of the Group.
??á|ìá??×?éí???ê£?′ó???ü?ìμ?ìá??·t??è??±μ???ì??????£
?±Dèá??aμ?òé????ê??êìa
£±??á÷?ú3μí???????á÷3ì?£
£2??á÷3μCCU????1?D?o?á÷3ìò??°?????-àí£?°üà ̈CCUó?×óμ¥?a????êμ?êD?μ? 1??μ?£
£3£òy±?á÷?÷μ??ê??2?êy?£
??2???1¤×÷? ̈òé
?y?ù????óD1???£?2?3é·??2£?2???μ?1??????èê??????±1¤??ó| ????á|?ò±?D?×?ê?μ?£??????±1¤μ????ê?°D??óê±?ì'ú±í×?μ ¥??μ?D??ó?£×?ê?1??????èê?×÷?aò???o???μ??¢ó?D?μ??±1¤μ ?×??e??μ?ì??t?£
?ú'???1¤×÷?Dμ????úìá3?ò?D?×??oμ?òa??oí? ̈òé£o
1?¢ 1¤×÷?D£?Dí?àê±oòó?μ?è±éù±??·?ò??1ê???··μDT2??°ê±μ??é??£? ̈òé2????ó??1ê???·μ?DT?'1¤×÷£??°ê±óDD§μ?·μ????3?£?ò??a?? é?ê??êìa?£
2?¢ K-3?μí3??è??ü°????t?°??3?μ??é????êμμ?·'ó33?à'£?μ?ê?óéóú? ?3????t?ü???μ·±£?óDD?2ú?·?1??óD?°ê±μ?ê?è??íò??-??ó?£??? ?ò???1Dèòaè??a?¢éó?ú£?3??a£??ùéó?ú?£·μ??ê±?í?ü?ó·3??£?3¤'? ò?íù£?êy?Y???a?aê§?£?ì3é??3?1¤×÷μ?2?±??£? ̈òé?ü?ò?ˉ??3ìDò?£
3?¢ ? ̈òé2???áìμ??àìyè???3?·t???o?eè?μ?? ̈òé£??e2?μ?°?ó?·t??è?? ±??o??à1?μ?è????ò??????D±£??a?ùà?óú?°ê±á??a??3?·t???ˉì ò??°??3?·t??μ?1üàí£????ò???áá??ù2?áìμ?μ?1¤×÷á?oí1¤×÷?1á|?£
???t£o
???Y?í?§?à1?è??±??μ¥ò??°áa?μ·?· ̈
D??? ?° ?? Áa?μ·?ê???è??2o?
±? ×¢??μ???
?? 3¤
0371--8354013
3£??·?
??ê??±??3¤
0371--8354313
Dì????
?ìDT?±??3¤
0371--8354213
?a????
°2è??±??3¤
0371--8354073
??? ̈?ü
??ó??±??3¤
0371--8354113
?£ ?à
33?ˉêé??
0371--8354093
·??éá?
33?ˉ?±êé??
0371--8354193
à????á
1¤?á?÷?ˉ
0371--8354053
Á???éy
??ê?????3¤
0371--8353933
13838025392
???§?¤
??ê????±??3¤
0371--8353933
13903847159
?μ?aì?
?ìDT1¤3ìê|
0371--7335064
μ?á|?¢?à??
13592590789
?üà???
?ìDT1¤3ìê|
0371--7335064
μ?á|
13653827071
á? o?
?ìDT1¤3ìê|
0371--7335064
μ?á|
13838113026
o£1ú?°
?ìDT1¤3ìê|
0371--7335064
?úè??¢??μ÷
à???áá
?ìDT3μ???÷è?
0371--8354743
13653815656
2ü??á?
?ìDT3μ???±?÷è?
0371--8354543
13838113037
'T? ̈?ü
?ìDT3μ???±?÷è?
037£-8354543
í???o£
?éê?êò?÷è?
0371--8354283
13523413942
?ü??1ú
?ìDTμ?×ó×é1¤3¤
037£-8355133
13783649321
ò?é?ê??£?Y?ú?????à1?è??±
ò???ê???ì×3§?òè??±
??ó
?ê?T3§???ù?ù3¤
13707339880
í?? ̈
?ê?T3§·t???ó3¤
13017105625
???3??
?ê?T3§?±?ó3¤
13507332089
?ü1ú?a
?ê?T3§?ê±£'|
13907332200
???£?é
'óí?3§·t???ó3¤
13523493649
?-? ̈?D
'óí?3§·t???ó?±
13353526382
recommended article
- Trial period report
- Summary of the learning stage of the advanced nature education of the Trade and Industry Bureau
- Year-end personal report
- Academic Director's Report
- Grain Depot Director 2012 Duty Report
- Public Security Bureau's report on debriefing
- Minister of Military Affairs report
- Township Party Committee Annual Debriefing Report
- Leading personal report
- Highway Bureau Director's report
- Township Party Committee Secretary, Chairman of the National People's Congress
- Store manager report
popular articles
- Blessing phrase
- Parental love
- Space mood phrase
- Legal maxim
- Philosophical words 2019
- 2019 Office Deputy Director's Report
- 2019 annual leadership team report
- Hyun dance family impression sentence
- 2019 annual report
- Weibo's famous sayings
- Spring Festival blessing
- Non-mainstream sentence 2019
- Not afraid of failure
- What I said to my father 2019
- Motivate employees
- Junior secondary school vice president debriefing report
- 2019 Party Secretary's report on debriefing
- 2019 Bank Vice President's Debrief Report
- Report on the personal work of leading cadres in 2019
- Distressed sentence 2019
- NPC deputy report
- Relieved words
- Teacher personal report
- Grateful mother's words
- 2019 report
- 2014 motivational phrase
- Good sentence excerpt 2019
- Life motto
- Encourage words 2019
- Respect the teacher's famous words