The first half of the chemical plant summary
First, the main work content and results:
Peaceful and environmentally friendly work is generally moving forward.
But looking back, the acetylene section has a lot of things. In general, the safety and environmental protection work is still moving forward and there are achievements.
1 The safety protection measures before the maintenance are compared.
It is also the mid-repair in October, whether it is an overhaul in April. The sections can be strictly handled in accordance with the company's various safety procedures, and the safety protection work before the maintenance is effectively carried out, especially on-site fire projects, which can achieve replacement without leaving a dead corner; isolation is effective and effective; supervision is serious and responsible; measures are scientifically sound; The operation is correct and standardized. For example, the cleaning of the slurry separator is completely nuanced, and the monitoring is in place to ensure substantial safety.
Escort for peace. 2 The maintenance and inspection of key points are timely.
Later, with the concerted efforts of the workers and the special workers, the parking caused by the leakage of the slurry pump in my section had occurred. A series of measures have been taken to make many thin links and key points no longer thin, to protect the safe production and environmental protection work. The inspection of the slurry conveying pipeline in my section made a great contribution to the discovery of hidden dangers and ensuring safety and environmental protection.
3 calcium carbide unloading and silo management is meticulous.
This brings some pressure to the management of calcium carbide unloading and silo, a rainy and snowy year. Despite this, the section is highly valued. Under the guidance of the leaders of the branch, in the event of rain and snow, ensure that there is a section of the calcium carbide warehouse on site for on-site monitoring, carefully check the incoming vehicles, and separate the wet calcium carbide into separate disposal to ensure The safety of the calcium carbide pile. The sampling analysis of each calcium carbide silo was shortened to once per hour, and the connection with the dispatch was strengthened, and the large nitrogen flow was timely opened. The inspection of each belt trestle is also meticulous. It is found that there is a leak phenomenon and temporary treatment is carried out in time to ensure the drying of the belt calcium carbide. Through some similar measures, the safety of the calcium carbide raw material is guaranteed.
4 Gradually improve all kinds of accounts for safety and environmental protection.
The requirements and management of various records and ledgers are stricter and more formal, with the pace of fine management of the company. This requires me to follow the level of first-line management. Under the guidance of the branch, the section has further standardized and established various types of safety and environmental protection accounts, such as the record of the emergency drills of the “Daily Safety Hidden Trouble Shooting”, the “Daily Maintenance Record of Special Equipment”, etc. It is required to make corresponding adjustments and unifications, which provides a better basis for daily safety work.
5 Accidents, safety activities on Monday, emergency drills, etc. have all improved.
The sections can be completed with quality and quantity. The accident is expected to be meticulous and meticulous about every task of safe work or routine routine work. The questions have questions and answers, and they are targeted, practical, and especially controversial. The discussion is overwhelming. Under the guidance of the special workers, there is finally a unified understanding and the desired purpose. Everyone has a few opinions. The benevolent sees the benevolence, the wise sees the wisdom, can talk about his own feelings in combination with his own post, the atmosphere is good, the speech is positive, the discussion is warm, and the effect is better. The emergency drills have more special features in our work section. We use the form of dispatching mines to write the title to the original accident point, let everyone go to the inspection, and make pioneering progress. At the same time, it is also recognized by the leaders of the Ministry of Health.
The effect is obvious. 6 Safe production month activities, Chun'an safety inspection, Qiu'an safety inspection, hidden danger investigation and other activities organized in an orderly manner.
The sections can be actively coordinated, and the annual company's safe production month and other activities. Go all out and work hard to do everything. Especially in the inspection of the Ping An in the spring and autumn, the sections can carry out all the work according to the requirements of the company, attach great importance to the ideological, check hidden dangers, cure hidden dangers, and ensure safe, stable and efficient production.
Economic activity analysis and energy saving work have achieved remarkable results.
1 Carrying out the work of saving energy and reducing consumption and repairing old waste.
The section was in the current year in terms of energy saving, consumption reduction and disposal.
He wrote a heavy stroke for repairing old profits. It can be said that the effect is remarkable. The section organized cleaning more than 500 old dusting cloth bags; repairing 6 dn100 gate valves by themselves; cleaning the old washing material of the washing tower by 9 cubic meters; cleaning and unblocking the generator cone bottom flushing water dn50 ball valve.
The analysis of economic activities at the 2nd stage level has already reached the track.
Gradually launched a section of economic activity analysis at the section level. In the first section, the daily work is in the form of a form. This year, my work section is under the guidance of the branch leader. Even the form of the quiz, let the team answer and guide him on how to conduct economic activity analysis. Then I will use the more standardized articles as a template for everyone to learn to analyze, and finally write an analysis article that combines the actual situation of their own team, which is both unified and targeted, and achieves the purpose of economic analysis. Ask him to make a horizontal ratio between the class and the class, to make a vertical ratio between different periods, more convincing, more comparative, more able to explain the problem, the effect is better.
3 The water conservation and evaluation of the primary water has reached its limit.
Regardless of the special work, this year's work section of my work section can be said to be the ultimate. Or the section or the employees are very economical about the use of water once, and a more stringent evaluation system has been introduced on the section to promote everyone's savings on primary consumption. Under the premise of safe production, we will strive to save one water and save even a drop of water for energy saving and consumption reduction.
4 The work of calcium carbide buckle ash and calcium carbide dust recovery has made little achievements.
I feel a sense of particularity when I say this. Because this year, I don’t know. The total amount of electricity and lime in the section when the truck is unloaded is more than 100 tons, equivalent to about RMB 300,000. It is indeed not a small number. Although I have withstood some pressures and difficulties, I am very proud of the company’s ability to recover so many losses. It is also worthwhile to be wronged. In addition, in the recycling of calcium carbide dust, it is also the best effort to eliminate Some unfavorable factors, do a good job of this work, and strive for more ash, a total of more than 6,000 bags of gray, more than 8 tons of calcium carbide, equivalent to nearly 30,000 yuan, can be said to be small achievements.
Process quality management is taking a new step.
The 100-day peace labor competition is in full swing.
The construction team held a mobilization meeting for the employees, since the company organized the 100-day Ping An Labor Competition in September, and took this opportunity to promote the pace of process quality management. The competition between the classes is fierce, chasing after each other, and strive to improve My own operational skills, unprecedented enthusiasm for work, and enthusiasm have also been generally mobilized, so that the pass rate of each process control point in my section has generally increased, especially the sub-sodium configuration pass rate and acetylene pass rate both set a 100% pass rate .
2 small indicators assessment step by step.
All major process control points were evaluated, along with the improvement of the company's quality management. The temperature qualification rate of the generator of the acetylene section is also in the scope of evaluation. The temperature of the generator in my section has many factors, and the innate design flaws have caused me to be a weakness. Opposite these difficulties, under the guidance of the special workers, actively find ways to find out the way, and finally negotiate with the technical department, the section will carry out a statistical analysis of the generator low temperature caused by some objective factors, and then the technical department will carry out unified verification and elimination. Although this work is very large, it is conducive to the fairness and fairness and the overall evaluation results of the branch; in addition, through some assessments in the section, the main control is required to strengthen the operation and monitoring, closely cooperate with the position, and strive to overcome some human factors. The low temperature caused by the small indicators has improved the assessment of small indicators.
The squad acceptance rate of the squad is gradually included in the squad.
[page]Will not review the team again, before the acetylene pass rate in my work section as long as the company's requirements. Now, especially under the guidance of the ISO9001 quality system certification, the company has included the acetylene pass rate into the content of the team evaluation. If the class is in the normal condition, the acetylene sulphur phosphorus is one point, including two. 2 points deducted, and penalized 30 yuan on duty, which played a positive role in promoting.
Successfully and satisfactorily completed 3 inspection and elimination tasks.
More than 30 overhaul, medium repair and self-inspection projects have been completed. The steel roof can be replaced with a belt. In this year, I have carried out 3 inspection and elimination tasks. The feeding belt on the east side of the fourth floor occurred, the guard plate and pump cover of the Beida slag pump replaced the packing of the washing tower, and eliminated many acetylene tube leaking points and other items, providing a strong guarantee for safe and stable production from the equipment.
Equipment maintenance is basically in place.
The section has made great progress in the maintenance of equipment, this year. The representative ash discharge valve has been modified to make the dust removal bellows, which makes the equipment frequently repaired simple and applicable, saving a large part of the cost and facilitating the operation. At the same time, the maintenance and maintenance of the slag pump is also effective, preventing the large vibration of the pump body, the drop caused by the failure of the valve plate or the occurrence of a parking event. The monitoring of the water ring compression is also in place, and the hidden dangers of the clues can be found in the first time to prevent large losses. Lubrication management of various moving equipment can also be carried out in a timely manner, timely lubrication, timely oil change, and guarantee the normal operation of the equipment.
The team construction has seen initial results.
The section did not slack off, and the team built this piece. Find ways to mobilize everyone's enthusiasm, develop the team's execution, teach the team some management experience and experience, and stimulate everyone's work enthusiasm. The work section has successively made the post staff appearance panel "class group evaluation board" class staff attendance board "monthly star board" first promote the pace of team construction from the hardware, and then guide everyone's daily management and assessment from the software. The value of the gratifying individual group has already had a team assessment method and performance appraisal method suitable for their own class. This is the effect of the company's large team construction. It can be said that it is first sight, and it is gratifying.
On-site civilized production adheres to good.
Working hard on on-site civilized production, on-site civilized production and clean and civilized production are the most basic and intuitive conditions for measuring a modern enterprise. The section is within the current year. The charter of each equipment was redistributed, and the hygiene of the package was re-applied. The 12 water-sealed cans were painted, and the bases of the pumps were also cleaned and painted, and the trenches of the clean rooms were cleaned. Complete dredging was carried out, the immersion and painting work was carried out on the submerged pipeline, and the sanitation cleaning and leveling were also carried out on the reserved land.
Second, the degree of work is insufficient.
The emergency response capability of the post staff is poor.
In fact, this is a very simple matter, which is mainly reflected in the 10.20 Venturi blasting incident. In particular, my field operators lacked a certain theoretical level and flexibility, complicated complicated things and caused accidents, which fully revealed the poor emergency handling capacity of our workers, and also showed that the daily staff training in my section was not in place. The on-site operation is big and it is going to go through the field and take the form. This is a place that should be reflected.
Labor discipline is good or bad.
There are individual teams with poor self-discipline, which is mainly reflected in the midnight shift. The poor ability of the squad leader’s co-management led to violations of discipline by local people. There are some people who do not care about the operation of the mobile phone, and even some individuals who are boldly off the job, although they have been properly dispositioned, they still cannot eliminate the lack of management in the section. This should be improved. The second place.
There are still loopholes in migrant workers’ management.
Because his own self-discipline is too poor, migrant workers have a headache. Moreover, the level of cognition of the rules and regulations is relatively poor, and the luck is too great. The smuggling and smuggling is too strong, which creates certain pressure on the management of the section. This is mainly manifested in the nameless cigarettes. For the management of migrant workers, it is not only necessary to carry out the necessary economic punishment, but more importantly, psychological education. Of course, this is not achieved overnight.
There are still dead ends in the inspection.
The sampling port of the acetylene gas cabinet leaks, which is mainly caused by the damage of the bearing of the Nanda slag pump. 2 large dip angle reducer gear wear, South clear liquid pipe on the frozen event, etc., indicating that my work section is very hard, very hard, but still have a dead angle, work is not detailed, work style still needs improvement, management level urgently improve.
Third, the work plan:
To ensure safe and stable production, 1 continue to implement and implement the company's various safe operating rules and regulations and operating procedures. There were no accidents throughout the year.
More important than a goal of struggle, this is not just a plan. The acetylene section can no longer be an accident. This is a point of view, but also a feeling. When I walked outside, I felt pressure. I felt that I couldn’t lift my head. If I still don’t change it, I still don’t stop this. I’m really a leader, and I’m really good at going home.
2 Strive to do a good job in training and education for employees.
Or it is to urge the special workers to do a good job in the training and education of the workers in the construction section, and to cooperate with the special workers. Carefully organized, not perfunctory, not going through the game, and actually put this work into practice. At the same time, the phenomenon of completion of the previous training is completed. Let everyone write about the experience and write the effect evaluation so that I can improve the training method and content.
3 Further deepen the maintenance and lubrication management of equipment.
Putting the responsibility of each equipment to the people, we intend to use the equipment charter as a breakthrough. It is not only the hygiene, but also the maintenance and lubrication of the main equipment. At the same time, it also requires the on-duty operator to conduct serious inspections and inspections on the equipment of his own position, so that the first level is good, so that there is a double management, if a certain equipment If something goes wrong, then the responsibility of the two people will be conducive to the improvement of management.
4 Continue to do a good job in energy saving, consumption reduction and repair.
There is a lot of work to do, but in fact my acetylene section has a lot of potential to dig. There are also many links to save energy and reduce consumption. For example, the current calcium carbide car storage detoxification, calcium carbide dust recovery project, as well as the scrap iron on the iron-breaker are all a considerable amount that can be recycled. Of course, this work is not good and difficult. In addition, many of the valves and replacement spare parts are repairable and reusable, such as the toggle plate replaced by the coarse crushing machine, the protective plate and the pump cover replaced by the large slurry can be reprocessed.
Strengthen the assessment. 5 Refined process and quality management system.
And strengthen the assessment, the original basis to continue to refine the process and quality management system. Encourage everyone's work enthusiasm, reward lazy, reward advanced, lashing backward, and promote the overall assessment level of the section.
6 Continue to do a good job in on-site civilized production.
According to the company's monthly plan and operation plan, 7 fully complete the various tasks assigned by the company and the branch. Cooperate with the branch to complete the production task
8 Strive to complete the temporary tasks that the branch has.
recommended article
- Summary of the work of the newly hired civil servants in the first half of the year
- Summary of the work of the agency affairs bureau for the first half of the year
- County Cultural Center's work summary for the first half of the year and the second half of the year
- Industry and Commerce Institute's work summary for the first half of 2019
- Summary of half-year work of township party and government offices
- Village official assistant half-year work summary
- Summary of the work of the Communist Youth League in the first half of the year
- The total work of the power company's experimental office in the first half of XX
- Summary of the work of the Commission for Discipline Inspection in the first half of 2019
- County Tourism Bureau's half-year work summary and second half of the work
- Summary of work in the first half of 2015
- Summary of the work of the Municipal Water Conservancy Bureau in the first half of 2019
popular articles
- Sad love sentence 2019
- Summary of the team's half-year work
- The latest high school inspirational maxim
- Qq space mood phrase
- Summary of work in the first half of 2019
- Summary of work in the first half of 2015
- 2014 is very touching words
- Summary of the half-year work of law enforcement in 2019
- Summary of the work of the hospital in the first half of 2014
- Deaf people jingle 2019
- The beginning of the second half of the work summary
- a good saying that loves labor
- Korean swear words
- Tao Xingzhi's famous sayings
- Du Yuexi's famous sayings
- English famous words
- College entrance examination inspirational quotes
- Strong words
- Teacher's famous saying
- Bing Xin’s famous words
- Summary of the work of the first half of the comprehensive office
- Summary of the work of the company's party branch in the first half
- The first half of the work summary begins
- Taizai’s famous sayings
- Classical life motto
- XX first half of the work summary _ mid-year work summary
- Describe the fast time sentence 2019
- Injured sentence
- I want to say something to the teacher.
- Thanks to the friend's words 2019