Mechanical and electrical maintenance work summary for the first half of 2019
Time flies, and it has been nearly half a year since the transfer from the distribution room. In the past six months, with the correct leadership and care of the factory and the department, I have been working with a positive attitude and a warm service spirit, while doing my best to learn new knowledge with humility. I have done some real things for the electromechanical group and the department, and have achieved certain results. However, there are still some shortcomings that need to be improved and improved. The relevant work situation in the past six months is summarized as follows:
I. Work Content My work content is broadly divided into electromechanical group work and equipment department work.
Electromechanical group work:
1. Organize team members to do the inspection, maintenance and repair of workshop equipment;
2. Participate in inspections and key maintenance and repair work;
3. Responsible for on-site specification and management of electromechanical groups and transformer substations;
Department work:
1. Safe work: fill in safety inspection records, safety rectification records, safety monthly statements, safety quarter reports;
2. Quality work: organize and maintain equipment archives; collect and organize ice machines, boilers, transformer and power distribution operation records, equipment oil records and workshop equipment maintenance records; statistical equipment integrity rate and monitoring and measuring equipment efficiency;
3. Complete other work for leadership arrangements;
Second, the main results
1. The placement of personal items in the electromechanical group, such as teacups, work shoes, etc.;
2. Public utilities, spare parts and materials shall be managed by special personnel;
3. Organize the members of the electromechanical group to complete the inspection, maintenance and repair of the workshop equipment in time to ensure the normal operation of the production equipment in the workshop;
4. Organize the top of the team to participate in the installation, release, wiring and commissioning of new equipment in the workshop, and prepare for the new equipment to be put into production as soon as possible;
5. Participate in part maintenance of the energy unit equipment to ensure the operation of energy equipment;
6. When the q10 machine liquid level control system is faulty, the liquid level control system of the q10 machine is modified, and the original liquid level controller is repaired. After the original controller controls the liquid level, the operation is normal, and there is no abnormality so far;
7. Participate in the electrical installation of the pre-processing section homogenization cooling water system transformation;
8. Participate in the installation and commissioning of electrical and pneumatic components for the cip central station system retrofit;
9. Complete the change of the workshop equipment inspection form and increase the inspection intensity of the equipment;
10. Do a good job of various records and statements for safe work;
11. Do a good job in maintenance of equipment files and collection of equipment operation, equipment oil, and workshop maintenance records; statistics on equipment integrity and monitoring and measuring equipment efficiency;
Third, experience experience
1. Work hard and improve professional skills As a technician, the level of professional skills is fundamental. Engaging in technology is endless, and we must carry forward the spirit of hard work and hard work. It is not only necessary to study the theoretical knowledge in books, but also to connect with reality and constantly explore and accumulate in practice. At the same time, we must also be open-minded and ask for relevant professional knowledge.
2. Efforts to improve management capabilities For me who have just been engaged in the management of electromechanical groups, everything I face is new and challenging. I need to enrich myself. I often use my spare time to read some books related to management, or to check some management information and management experience of seniors. And the use of these management knowledge to work is the most important, otherwise it is "paper talk", I have done enough in this area, but also need to increase the intensity.
Pay attention to thinking, sometimes encounter the same problem, some people handle it properly, and some people deal with it. As a manager, it is necessary to develop the habit of diligent thinking, that is, usually encounter problems, be diligent in thinking, and even lead the team to solve problems with the best solution.
At the same time, we must communicate with the team members on a regular basis, and encourage members to put forward their own opinions and problems in the department. In order to improve in time!
3. Pay attention to the details and gradually grow up in the work. Any mistakes in the subtleties may lead to the failure of the whole work. Therefore, we must pay attention to every link and be meticulous. Learn to record everything and every important link, and provide materials and evidence for future study and review.
Fourth, there are problems and deficiencies
1. Sometimes a little careless and not careful at work;
2. Insufficient research in professional technology;
3. Insufficient organization and management;
In view of the above problems, in the future work, we must overcome the carelessness, strengthen the professional skills, and learn the skills to strive for greater progress. At the same time, we must strengthen the application of the management knowledge we have learned to the work, and give full play to the strength of the team. Work has been done to a higher level.
In short, half a year of work, there are also insufficient achievements, there are joy and bitterness, but the harvest is the theme. Although there is no earth-shattering event, it reflects the meaning of work and the value of life in a small matter. In order to exercise self and grow into a material. In the future work, I will work harder, improve myself and improve myself!
I. Work Content My work content is broadly divided into electromechanical group work and equipment department work.
Electromechanical group work:
1. Organize team members to do the inspection, maintenance and repair of workshop equipment;
2. Participate in inspections and key maintenance and repair work;
3. Responsible for on-site specification and management of electromechanical groups and transformer substations;
Department work:
1. Safe work: fill in safety inspection records, safety rectification records, safety monthly statements, safety quarter reports;
2. Quality work: organize and maintain equipment archives; collect and organize ice machines, boilers, transformer and power distribution operation records, equipment oil records and workshop equipment maintenance records; statistical equipment integrity rate and monitoring and measuring equipment efficiency;
3. Complete other work for leadership arrangements;
Second, the main results
1. The placement of personal items in the electromechanical group, such as teacups, work shoes, etc.;
2. Public utilities, spare parts and materials shall be managed by special personnel;
3. Organize the members of the electromechanical group to complete the inspection, maintenance and repair of the workshop equipment in time to ensure the normal operation of the production equipment in the workshop;
4. Organize the top of the team to participate in the installation, release, wiring and commissioning of new equipment in the workshop, and prepare for the new equipment to be put into production as soon as possible;
5. Participate in part maintenance of the energy unit equipment to ensure the operation of energy equipment;
6. When the q10 machine liquid level control system is faulty, the liquid level control system of the q10 machine is modified, and the original liquid level controller is repaired. After the original controller controls the liquid level, the operation is normal, and there is no abnormality so far;
7. Participate in the electrical installation of the pre-processing section homogenization cooling water system transformation;
8. Participate in the installation and commissioning of electrical and pneumatic components for the cip central station system retrofit;
9. Complete the change of the workshop equipment inspection form and increase the inspection intensity of the equipment;
10. Do a good job of various records and statements for safe work;
11. Do a good job in maintenance of equipment files and collection of equipment operation, equipment oil, and workshop maintenance records; statistics on equipment integrity and monitoring and measuring equipment efficiency;
Third, experience experience
1. Work hard and improve professional skills As a technician, the level of professional skills is fundamental. Engaging in technology is endless, and we must carry forward the spirit of hard work and hard work. It is not only necessary to study the theoretical knowledge in books, but also to connect with reality and constantly explore and accumulate in practice. At the same time, we must also be open-minded and ask for relevant professional knowledge.
2. Efforts to improve management capabilities For me who have just been engaged in the management of electromechanical groups, everything I face is new and challenging. I need to enrich myself. I often use my spare time to read some books related to management, or to check some management information and management experience of seniors. And the use of these management knowledge to work is the most important, otherwise it is "paper talk", I have done enough in this area, but also need to increase the intensity.
Pay attention to thinking, sometimes encounter the same problem, some people handle it properly, and some people deal with it. As a manager, it is necessary to develop the habit of diligent thinking, that is, usually encounter problems, be diligent in thinking, and even lead the team to solve problems with the best solution.
At the same time, we must communicate with the team members on a regular basis, and encourage members to put forward their own opinions and problems in the department. In order to improve in time!
3. Pay attention to the details and gradually grow up in the work. Any mistakes in the subtleties may lead to the failure of the whole work. Therefore, we must pay attention to every link and be meticulous. Learn to record everything and every important link, and provide materials and evidence for future study and review.
Fourth, there are problems and deficiencies
1. Sometimes a little careless and not careful at work;
2. Insufficient research in professional technology;
3. Insufficient organization and management;
In view of the above problems, in the future work, we must overcome the carelessness, strengthen the professional skills, and learn the skills to strive for greater progress. At the same time, we must strengthen the application of the management knowledge we have learned to the work, and give full play to the strength of the team. Work has been done to a higher level.
In short, half a year of work, there are also insufficient achievements, there are joy and bitterness, but the harvest is the theme. Although there is no earth-shattering event, it reflects the meaning of work and the value of life in a small matter. In order to exercise self and grow into a material. In the future work, I will work harder, improve myself and improve myself!
recommended article
- Village official assistant half-year work summary
- Summary of the work of the newly hired civil servants in the first half of the year
- Industry and Commerce Institute's work summary for the first half of 2019
- The total work of the power company's experimental office in the first half of XX
- Summary of work in the first half of 2015
- Summary of the work of the Municipal Water Conservancy Bureau in the first half of 2019
- Summary of the work of the Communist Youth League in the first half of the year
- Summary of the work of the Commission for Discipline Inspection in the first half of 2019
- Summary of the work of the agency affairs bureau for the first half of the year
- Summary of half-year work of township party and government offices
- County Tourism Bureau's half-year work summary and second half of the work
- County Cultural Center's work summary for the first half of the year and the second half of the year
popular articles
- XX first half of the work summary _ mid-year work summary
- Summary of work in the first half of 2019
- Summary of the team's half-year work
- Deaf people jingle 2019
- The first half of the work summary begins
- Bing Xin’s famous words
- Summary of the work of the company's party branch in the first half
- Qq space mood phrase
- Describe the fast time sentence 2019
- Summary of the work of the hospital in the first half of 2014
- Thanks to the friend's words 2019
- 2014 is very touching words
- Summary of work in the first half of 2015
- The beginning of the second half of the work summary
- Classical life motto
- Sad love sentence 2019
- College entrance examination inspirational quotes
- Injured sentence
- Summary of the half-year work of law enforcement in 2019
- Du Yuexi's famous sayings
- Summary of the work of the first half of the comprehensive office
- English famous words
- Tao Xingzhi's famous sayings
- The latest high school inspirational maxim
- Korean swear words
- Taizai’s famous sayings
- a good saying that loves labor
- I want to say something to the teacher.
- Teacher's famous saying
- Strong words