Summary of work > Summary of half-year work

Summary of work of the first half of the Water Resources Bureau


In the first half of XX, under the guidance of the correct leadership of the county party committee and the county government and the business guidance of the higher authorities, the xx County Water Resources Bureau, with the strong support of relevant departments and towns and villages, focused on the overall situation of the county and actively made progress. Pioneering and innovating, the county's farmland water conservancy, flood control construction, soil and water conservation, water resources management and water law enforcement, fishery and fishery, local power construction and other work in an orderly manner, the effect is better, the specific situation is summarized as follows: First, the results achieved As of May 30, the farmland water conservancy project, the county's action of 6,455, completed 317,000 investment, invested 25.071 million yuan, started 2485 various types of water conservancy projects, completed 2,361. The county has newly added water-drawing capacity of 360,000 square meters, accounting for 85.71% of the number of tasks, adding 1.11 million square meters of water-saving capacity, adding 0.47 million mu of effective irrigation, accounting for 94% of the number of tasks, and restoring and improving the irrigation surface of 12,000 mu. , accounting for 60% of the number of tasks, solving the rural drinking water safety of 0.8 million, accounting for 40% of the annual plan, rehabilitating 18 dangerous reservoirs, accounting for 150% of the number of tasks, 979 new water conservancy projects, and the dry mountain village rain collection festival The irrigation project built 76 new reservoirs and rectified 10 reservoirs of Shanpingtang. The newly-added water volume was 56,800 square meters, and the newly added effective irrigation surface was 1058 mu. Completed the water conservancy construction task in the first half of XX. 1. Rehabilitation of sick and dangerous reservoirs There are many dangerous reservoirs in our county. The situation is very serious. Through efforts in recent years, the Berlin Reservoir Reinforcement Project has issued 10.6 million yuan of funds, including 6.7 million yuan invested by the state. The project has released 3.89 million yuan of funds, of which 2.76 million yuan is invested by the state. The two reservoir reinforcement projects are under construction and will be implemented during the year. The second batch of dangerous reservoirs at the county level has been completed and 18 of them have been completed. The remaining 13 are being rehabilitated. The Xintang Reservoir in the “5.12” Wenchuan earthquake is being rescued. 2, canal supporting project construction work XX years grain production area medium-sized irrigation area channel supporting project Berlin reservoir canal supporting will be completed soon, the total investment of the project is 1,183,300 yuan, the state investment is 1 million yuan, the construction channel is 4.6km, the tunnel 2 is 0.11km, After the completion of the project, 0.21 million mu of water-saving irrigation surface can be added. The special fund for the construction of the central government's small-scale farmland water conservancy project irrigation area involves the channel of Majia Reservoir in the village of Qufu, the channel of Miaogou Reservoir in Huinan Township, and the united channel of Zhongtan Township. The state invested 800,000 yuan and has been completed. At the same time, in order to cooperate with the construction of the modern agricultural demonstration park, the county-level finance invested 2.36 million yuan to repair the left main canal of the Sanba Reservoir in Juguang Township and reconstruct the main channel 6.56km. The project started on May 30 and is expected to be completed in late July. Increase the effective irrigation area by 2,200 mu. 3. Construction of the rain-fed irrigation project in the dry mountain village XX years The rain-fed irrigation project of the dry mountain village in Dashi Village and Sanshi Township Essence Village in Sanban Township, completed a total of 76 construction projects in the two project villages, including 66 new reservoirs. 76 sets of collecting ditches 1,140m, expansion of 10 sets of Shanpingtang, new water volume of 56,800 m3, new effective irrigation surface of 1058 mu, new dryland watering area of ​​1035 mu, completed project total investment of 905,000 yuan, including provincial level The financial subsidy is 700,000 yuan. In XX, the central government's rainwater accumulation project has completed the project declaration, and plans to build 267 new rainwater collection and utilization projects, including 247 new reservoirs and 20 collectively expanded Shanpingtang. After the completion of the project, the newly added water volume will be 79,000 m3 and the recovery water volume will be 109,300 m3. 3,555 mu of effective irrigation surface was added, of which 3,334 mu of dry land was added and 221 mu of Tiantian was poured. The total investment of the project is 6.3391 million yuan, of which: the state invested 3 million yuan. 4. The rural drinking water safety project has been successfully completed and solved the safety of drinking water for 6,500 people. In XX, the first batch of special funds in the central budget for rural drinking water safety projects totaled 7.89 million yuan, of which the state invested 5.325 million yuan. After the completion of the project, it can solve the drinking water safety of XX0 people; the second batch of rural drinking water in the central budget of XX year The total investment of the safety project is 800,000 yuan, of which the state investment is 540,000 yuan. After the completion of the project, the drinking water safety of XX people can be solved. Now the two batches have completed the technical design and will be sent to the financial review. In XX, the provincial-level rural drinking water safety project has a total investment of 1.946 million yuan, including a provincial subsidy of 1.2 million yuan. After the project is completed, it can solve the drinking water safety of 5,400 people. The county township water supply company completed the installation of the main pipeline for water distribution and distribution more than 5,000 meters, installed 689 water meters for users, purchased 3 chlorine dioxide generators, improved the water disinfection treatment facilities of Helin, Lidu and Wensong water supply stations, effectively protecting residents. The drinking water was safe, and the water supply income was 1,659,600 yuan in January and June, and 60.9% of the annual plan was completed. 5. The construction of the Yellow TV Base was successfully completed. The construction of the “Huanghua Base” water conservancy facilities in Wuping Village, Qingxiangchang Town, and the “Huanghua Base” of Qingxichang Town was completed. Three reservoirs were built, three reservoirs were built, and 300 mu of effective irrigation surface was added. The restoration of 120 acres of irrigation surface has laid a solid foundation for the development of the local yellow flower industry, laying a foundation for the smooth convening of the first “Huanghua Festival” in xx County. 6. The project reserve Liujia Arch Bridge Reservoir Construction Project was officially launched. The County Party Committee and the County Government established the Leading Group for the Construction of the Liujia Arch Bridge Reservoir. The County Water Resources Bureau also established the Leading Group for the Construction of the Liujia Arch Bridge Reservoir. The small-scale reservoirs of Zhangjiawan, Huangjiagou, Sanba, Xinheyu and Box Rock of the Central Dangerous Reservoir Reinforcement Special Project have been completed. Since the beginning of flood control construction, in order to ensure the safety of water conservancy projects and rivers, in accordance with the principle of “safety first, always unremitting, preventive, and full rescue”, we have established the principle of “protecting floods and ensuring peace and fighting drought”. Goal. It is clear that the main task of our county's flood control and drought relief work this year is based on “anti-big squad, anti-drought, and great disaster”. All departments at all levels of the county are required to prepare and implement early in the aspects of flood control responsibility system, forecasting, forecasting, early warning, plan, material reserve, and rescue team. The bureau established the “Flood Flood Prevention Leading Group” with the director as the team leader, and together with the county flood control and drought resistance headquarters, carried out in-depth and meticulous safety inspections for all small and medium-sized reservoirs and other water conservancy projects in the county, and implemented the executive heads. Responsible system, prepared a practical emergency plan for flood control, and formulated a 24-hour duty system to ensure the smooth flow of information. It also signed a target responsibility book with each district water station and reservoir management office to ensure clear tasks and responsibility. We will endeavor to prevent the flood control and drought relief work by “grasping early, grasping, grasping, and grasping the reality” and doing everything possible to ensure the safety of water conservancy projects. Up to now, the county has set up more than 130 flood control leading groups, set up 186 5650 rescue and disaster relief teams, reserve 40,000 sacks of anti-mite materials, 50,000 woven bags, 12 tons of lead wire, 7 tons of gasoline and diesel, 6 assault boats, and lifesaving. There are 65 ships, 1,850 life jackets, 120 rescue vehicles, 8000 tools, 1,650 lights, 3000 sets of rain gear and 44 sets of generators. In early May, the county committee formed 8 inspection teams to conduct a comprehensive inspection of flood control and drought relief work in 60 townships and towns throughout the county. Up to now, the county has organized 150 flood control inspection teams and dispatched more than 1,200 personnel. 60 townships, 94 reservoirs, 5 flood control and rescue towers, 49 dike projects, 62 factories and mines, 98 departments, a total of 6 hidden dangers, 5 on-site treatments, 1 time limit, effectively eliminated Various types of security risks. Prepared for the flood control drills, and planned to launch a large-scale flood control drill in early June. The flood control system was improved, and funds were actively raised. A total investment of more than 1.5 million yuan was completed. The construction of the flood control command center and the construction of the video surveillance system of Wenchong Town, Sanhui Town, Qucheng Binhe Road, Qucheng Farmers Market and Berlin Reservoir were completed. The construction of the third phase of flood control infrastructure was started, the construction of Wen Chongshui automatic forecasting station was started, and the remote control equipment for flood control was purchased. The construction of the flood prevention network system was fully affirmed by the leaders of the provincial, municipal and county levels. Currently, The establishment of a four-level platform for flood control network will provide an effective, convenient and fast basis for leading scientific decision-making. The implementation of the XX agricultural and water conservation project in XX was completed in the aspect of soil and water conservation, and the provincial annual inspection and acceptance was passed. The key management of the two small watersheds of Yunfa River and Yanjiagou in the XX Agricultural Development and Water Conservation Project of the year XX, up to now, comprehensively control the soil erosion area of ​​8 square kilometers, accounting for 47.1% of the target mission of 17 square kilometers, of which 6.7 hectares of slopes are converted to water. 106.7 hectares of forest, 6.3 hectares of fruit forest, 366.7 hectares of ban, 313.6 hectares of soil conservation, 3 reservoirs, 30 sinking sands, 2.6 kilometers of drainage ditches, 1.2 kilometers of roads, compensation for water and soil conservation facilities 158,000 yuan, handling 12 "water and soil conservation program approval certificate", completed the construction of standard observation community of soil and water conservation monitoring points. [page] Water Resources Management and Water Law Enforcement In the first six months of the year, 60 sets of Water Permits were replaced, including 6 sets of newly obtained water permit and other pre-applications for water permit, and water administrative fees were levied according to law. A total of 283,600 yuan, of which water resources fee of 120,200 yuan, water insurance fees of 158,100 yuan, the other 0.53 million. Completed the census registration work of the county's sewage intrusion into the river, effectively carried out water quality monitoring, and increased publicity efforts. During the “World Water Day” and “China Water Week”, the water law series propaganda film was broadcasted on the xx county TV station. And organized the cadres and water affairs inspectors to set up propaganda desks in Bayi Street, Baoen Township, Qingxichang Town, Lidu Township, etc., and visited 620 people, solved 16 questions and sent promotional materials 26000. 400 copies of scientific and technical materials and 100,000 fish fry; at the same time, 1 new permanent slogan on important traffic trunks, 3 permanent slogans, more than 100 rock and wall signs, and 10 banners on the street. Width. Through a variety of content-rich publicity activities, the influence and education have been expanded, and the awareness of water conservation, water and television awareness, water commodity awareness, water anxiety, water environmental awareness, and human and animal drinking water safety awareness of citizens and legal persons in the whole society have been enhanced. . In the first six months of the fishery and fishery production, a total of 78 million fish fry and 550 tons of fish species were produced and transported; 73,000 mu of fish were cultivated in rice fields, 7,000 mu of fish were raised, 12,200 mu of fish were raised in ponds, and 9800 tons of aquatic products were produced. 51% of the annual task, an increase of 300 tons over the same period of last year, an increase of 3.2%, total fishery output value of 99 million yuan, an increase of 24 million yuan over the same period last year, an increase of 32%; handling of river fishing licenses 350, handling various fishery cases 30 1, investigated and dealt with 1 case of fish fry, 5 cases of electric fishing, 5 sets of fishing machines, 6 sets of batteries, 7 sets of power grids, 3 cleaned and rehabilitated "three no" vessels, 60 education penalties, and the settlement rate reached 98. %, the fishing vessel registration inspection rate reached 100%, and no safety responsibility accident occurred. In terms of local power construction, the power generation capacity was 99 million kWh, the power supply was 109 million kWh, and the sales volume was 95 million kWh. The sales income was 62.79 million yuan, the profit and tax was 1.45 million yuan, and the comprehensive line loss was 12.21%. Check and rectify the safety hazards of the snow and ice disasters and the “5.12” earthquake. The Shifotan Power Station completed the construction of the cofferdam and is under construction for the main plant excavation; the preliminary design report of the expansion project of the Nanyangtan Power Station has been reviewed by the expert group organized by the Municipal Water Conservancy Bureau. Second, the main problems existed 1. Insufficient investment in water resources. Due to the provisions of the state investment policy, the national water conservancy project has limited capital investment, and it is difficult for the people to invest and raise funds, and the funding gap is large. 2. The ability of farmland water conservancy infrastructure to resist natural disasters is not strong, mainly due to incomplete irrigation facilities, aging of the original water conservancy projects, poor operating efficiency, etc., especially after the first two years of heavy rain and drought, some water conservancy facilities are damaged. serious. 3. The promotion of new technologies for water conservancy construction is insufficient, and it is necessary to gradually increase the scientific and technological content. 4. The local power enterprise management system is not smooth and coordination is difficult. 5. The administrative licensing and examination and approval matters need to be further regulated, and the order of river sand mining management needs to be strengthened. 6. The supervision and management of fishery administration is not enough. The illegal “electric poisoning” fish behavior is becoming more and more rampant, and it is more difficult to obtain evidence and strike. Third, the work in the second half of the year is intended to highlight key points, strive to do a good job in various water conservancy work, and earnestly grasp the work of flood control and drought relief. Actively prepare for the prevention of floods and major disasters, ensure that existing water conservancy projects are fully functioning, and provide a solid foundation for agricultural water use and economic development. First, we must effectively strengthen the flood control dispatch management during the flood season, conscientiously implement the administrative head responsibility system and the flood prevention post responsibility system, implement a 24-hour duty system, strengthen the dam monitoring, and track the water conditions and rain conditions throughout the journey. . We will prepare a safe transfer plan for the people in the lower reaches of the reservoir, prepare spare materials for emergency rescue, organize flood prevention and rescue teams, and implement various measures to ensure that everything is safe. Second, we must strengthen the propaganda work for the people in the Shanhong-prone area. Through various means and measures, it is necessary to publicize and popularize the knowledge related to mountain flood disaster prevention to the people in the Shanhong Yifa District, and to improve the vigilance and risk aversion of the people. We must conscientiously implement our responsibilities and strengthen the monitoring and prevention of geological disasters. Third, we must do a good job in reporting disasters. After discovering the disaster situation, it is necessary to rush to the scene to guide the rescue and relief work, and actively collect and verify the disaster situation and report it in time, so as not to delay, report or miss the report. Fourth, we must make full use of the favorable opportunity of rain in summer, and ensure the fullness of the flood, while storing as much water and water as possible, and actively doing drought relief work. 2. Adhere to the people-oriented principle and solve the problem of rural drinking water safety as an important task of water conservancy work. On the basis of consolidating the results of the original human and animal drinking water, it is the primary task of the current water conservancy work to ensure the safety of drinking water, and to give priority to solving the problem of drinking water and drinking water safety in towns and villages with relatively concentrated population. 3. Strengthen the basic construction of farmland water conservancy and continuously improve the water conditions of rural people. We will use the market mechanism and the ** method to encourage and guide the peasant people to invest in labor and work, unremittingly do a good job in the basic construction of farmland water conservancy, and promote the construction of rainwater harvesting and utilization projects. Increase water-saving irrigation input and improve water use efficiency. Focusing on the renovation of supporting water-saving projects in the irrigation district, improving the existing farmland water conservancy facilities, improving the agricultural irrigation and drainage system, and vigorously promoting water-saving irrigation to achieve dry irrigation and flood discharge. Actively establish an effective input mechanism, effectively do a good job in the remediation of sick and dangerous reservoirs, and ensure the safe operation of the reservoir. Strengthen soil and water conservation, control soil erosion, and do a good job in local small and medium-sized water source protection projects. 4. Strengthen water administrative law enforcement and strengthen water resources management. First, we must continue to do a good job in propaganda work on water TV regulations, and conscientiously implement the "xx" law-enforcement plan; second, we must increase the collection of water administrative fees; third, we must strengthen water law enforcement, and vigorously strengthen the construction of water administrative law enforcement teams. Enforcement and impartiality; Fourth, we must strengthen the management of the river and ensure full embarrassment. 5. With the goal of increasing farmers' income, we must do a good job in fishery production, vigorously promote rice-fish farming and rice-fishing, and promote farmers' continuous income increase. Resolutely prohibit the use of fertilizer and water to raise fish, and fully implement freshwater fish farming. 6. Grasp the local power work. First, we must earnestly grasp the reform of the local power system; second, we must scientifically dispatch and rationalize the arrangements to ensure that the power regulation in summer peaks is safe and orderly. Innovative ideas, the formation of a diversified water conservancy investment mechanism, one must actively strive for financial input at all levels. The main characteristics of water conservancy are public welfare, especially for the construction of flood control and drainage facilities, key water conservancy projects, water environmental protection projects, etc., which must be the responsibility of the government and financial construction. It is necessary to make full use of various water conservancy funds and ensure the special use of water conservancy construction funds. The second is to standardize the policy of “one case, one discussion” for villagers. The villagers' "one case, one discussion" system is an important policy for the development of rural water conservancy construction in the future. Under the principle of adhering to the principle of respecting public opinion, it is necessary to adapt to local conditions, actively explore, standardize procedures, improve the system, and use the "one case, one discussion" policy to actively guide farmers to raise funds. Labor is invested in rural water conservancy construction. The third is to actively guide social investment. Many beneficiaries of water conservancy projects are specific. They should use market mechanisms and implement preferential policies in accordance with the principle of “who benefits, who invests” or “who invests and who operates”, and encourages various social capital to invest in rural water conservancy projects. management. The fourth is to comprehensively develop water and soil resources. The practice in developed areas proves that in the process of water conservancy construction, through the optimization of planning layout and engineering design, the integration of water conservancy projects with land reclamation, road construction, tree planting and other multi-operational production, and scientific development of water resources, Through water, water, water, water, and other means, we will expand the sources of water conservancy construction and promote the development of water conservancy construction. Paying attention to actual results and giving full play to the economic and social benefits of water conservancy projects. The construction of water conservancy is extensive, and it is necessary to fully mobilize the people, vigorously and vigorously, but also adhere to scientific attitudes and pragmatically. First, we must adhere to scientific planning. Second, we must emphasize the amount of power. Third, we must ensure the quality of the project. Water conservancy construction has a major interest in the safety of people's lives and property. It must adhere to optimal design, meticulous organization, scientific management, strict inspection and acceptance, quality assurance, and prohibition of flowers. Fourth, we must establish long-term management. Seriously sum up the lessons of water conservancy reconstruction in the past, and put the strengthening of water conservancy project management on the important agenda. Promote the sustainable development of water conservancy projects by establishing a long-term management system and mechanism for water conservancy projects. It is necessary to take various effective measures to ensure the quality of the project. We will conscientiously implement the "Project Legal Person Responsibility System, Construction Supervision System, and Bidding System", and ensure good funds, materials, systems, qualifications, and acceptance, and eliminate "relationship projects," "human project," and "tofu residue." Engineering; we must strengthen construction safety management, strictly implement the project supervision system, and strictly prevent the occurrence of major safety accidents; we must conscientiously summarize the experience and lessons in recent years in the treatment of dangerous reservoirs, dike construction and irrigation district reconstruction, and vigorously promote new technologies and new Materials, new processes, new equipment, improve the scientific and technological content, and give full play to the engineering benefits; we must adhere to the principle of benefit first through the planning, design, construction and other aspects, truly build one place, one place, manage well One place, benefiting one place, so that farmers can get benefits.

recommended article

popular articles