In 2019, under the correct leadership of the county party committee and county government, under the correct guidance of the county crisis reform office, under the guidance of the “Government-led, planning and guiding, and the main body of the people”, the town’s rural dilapidated housing reconstruction work will strengthen leadership. Well-organized, pragmatic, and coordinated, the rural dilapidated houses have achieved certain results, which have fundamentally improved the housing conditions of some farmers, and have been well received by the dilapidated houses and the community. The work is summarized as follows:
I. Implementation of the renovation of dilapidated houses in rural areas
In 2019, the county allocated 80 households for the renovation of rural dilapidated houses in our town, including the first batch of 50 households and the second batch of 30 households, all of which were renovation of new houses for dilapidated houses. By December 20, 2019, the town had actually completed 80 rural dilapidated houses, including 6 households with five guarantees, 18 households with low-income households, 9 households with disabilities, and 47 households with other poverty-stricken households. All of them passed the preliminary acceptance of the leading group for the renovation of dangerous buildings in the town. In particular, the task of transforming 16 dangerous houses in Senling and Qiaolian Villages was completed on time, and was repeatedly praised by the leaders of counties and towns.
Second, the main practice
The renovation of dilapidated houses in rural areas is a good thing to improve people's livelihood. It is a matter of great concern and concern for the party committee, government and the people of the town. It is a practical matter that benefits the people, the children of Enze, and promotes the development of the rural economy. It is also an urgent task. Urgent things that urgently need to be solved. To implement the renovation of dilapidated houses in rural areas, we have taken a series of effective measures to steadily advance this work. Our specific approach is:
Leaders attach importance to, clarify responsibilities, and implement accountability system. The Party Committee Government of our town attaches great importance to the work of reforming rural dilapidated houses, regards it as an important thought of practicing the "Three Represents", implements the scientific development concept, builds a new socialist countryside, builds a harmonious society, and closes the relationship between the party and the masses. We will do everything in a big way to make arrangements for the main tasks of doing practical things, benefiting people's livelihood, and getting people's hearts. After the meeting of the rural dilapidated house renovation work, the team meeting will be held for research, and the leading group of rural dangerous houses renovation work in XX Town will be adjusted and adjusted. Detailed and feasible implementation plans will be formulated, and the main leaders will be responsible for the overall responsibility. The cadres stationed in the villages promoted and promoted the households, and initiated the accountability and accountability system for the cadres who did not have the time and tasks completed, and were linked to the year-end evaluation and evaluation.
Do a good job in preparation for the renovation of dilapidated houses in rural areas
1. Seriously carry out investigation and mapping work. In order to accurately grasp the basic situation of families with difficulties in housing in rural areas of our town, we will adopt ways such as holding town and village cadre associations, villagers' representative meetings, public meetings, and entering villages to strengthen publicity on rural dilapidated housing reform policies, so that rural dilapidated housing reconstruction work is well known. On the basis of self-examination by each village, the investigation team of the township Baocun task force was investigated and verified one by one, and there was a preliminary understanding of the voluntary reform of rural dilapidated houses.
2. Carefully screen and identify the target households of the dangerous house renovation project. According to the number of tasks assigned to the town by the superior, strictly follow the implementation standards and conditions, verify the dangerous households after screening, and implement the “sunshine” according to the principle of “five guarantees and poverty priority”. Operation, always take the investigation and
The object is determined to be placed under the supervision of the general public, and is strictly in accordance with the six procedures of “the application of the householder, the investigation and verification by the village committee and the investigation team, the evaluation of the village representative meeting, the public notice of the village committee, the review of the township people's government, and the county approval”. After the object was examined, the economic status and the degree of dangerous housing of each household were carefully analyzed and determined, and the subsidy standards were determined. Make the renovation of dilapidated houses deeply rooted in the hearts of the people and establish a good social image.
We will pay close attention to implementation and ensure the complete completion of rural dilapidated housing reconstruction tasks, scientific planning, and highlight local characteristics. In the principle of "first planning, post-building". Combine the transformation of rural dilapidated houses with the construction of new countryside, combine with the integration of resources, support the development of people's production, combine with rural planning and environmental remediation, and combine electricity, access, water, and convenience for people's production and life. In the implementation of the rural dilapidated housing renovation project, we must adhere to local conditions and lay the foundation for promoting new rural construction and promoting rural economic development.
2. Strengthen supervision and ensure the quality and progress of the renovation project. The project quality supervision and inspection has always been taken as a key task. After the object is determined, the township crisis reform leadership team will regularly supervise the crisis work and understand the problems in the renovation project. Actively communicate with the technical personnel of the County Dangerous Reform Office, promptly teach the building houses to build building knowledge, and deepen the construction of the house to check the quality of the building project. For the construction sites found in the construction that do not meet the design standards, the houses are required to be rectified within a time limit. To ensure the progress and quality of the project.
3. Formulate preferential policies and vigorously support the smooth implementation of the renovation of dilapidated buildings. In the process of renovation of dilapidated buildings, various departments have provided assistance within their capabilities. Ministry of Land and Resources
In the approval of the homestead, the door is specially designed to be special, not only to simplify the procedures, but also to reduce the use of free, all units in the town have given a green light for the renovation of dangerous buildings, so that the people have real benefits.
4. Strengthen fund management to ensure standard operation. Strictly in accordance with the requirements of the county regulations, the Dangerous Housing Reform subsidy funds will be directly credited to the target farmers' subsidy passbook, 40% of the funds will be disbursed before December 20, and the remaining funds will be disbursed before December 31.
5. Create a file. In order to facilitate the inquiry, we have established an electronic file according to the requirements of the higher level, and recorded the data of all the dangerous houses in the dangerous house into the software. At the same time, a household is established.
Third, the difficulties and problems
First, the poverty-stricken area of our town is large, and the poverty level is deep. The dangerous households have accumulated less. In addition to the state subsidies, the funds raised by individual crisis-changing households are mostly built by borrowing loans, which brings new burdens to them.
Second, the subsidies for rural dilapidated housing reform are small, the project funds are single, and the number of rural dilapidated buildings is large, while the superior indicators are limited, which is difficult to meet the needs of rural dilapidated households.
Third, through the implementation of the renovation of dilapidated houses in rural areas, the dilapidated houses inhabited by the people have been improved, but the investment in supporting facilities is insufficient to keep up with the needs of building a new socialist countryside.
Summary of dangerous house renovation work
In 2019, under the correct leadership of the county party committee and the county government, under the correct guidance of the county agricultural bureau, under the guidance of the “government-led, planning and guiding, and the main body of the people”, the reform of the rural dilapidated houses in our field will effectively strengthen leadership. Carefully organized, pragmatic, and coordinated, the rural dilapidated houses have achieved certain results, which have fundamentally improved the housing conditions of some farmers, and have been well received by the dilapidated houses and the community. The work is summarized as follows:
I. Implementation of the renovation of dilapidated houses in rural areas
In 2019, we implemented a total of 580 households in the construction of dilapidated houses. After the approval of the county government, this year will cover 17 village committees in the town. At present, the archives of the dilapidated houses have been filed, and all the houses have been started. By the end of the year, More than 200 completed projects, more than half of the total accounted for more than 80%, building is in full swing.
Second, the main practice
The renovation of dilapidated houses in rural areas is a good thing to improve people's livelihood. It is a matter of great concern and concern for the party committee, government and the people of the town. It is a practical matter that benefits the people, the children of Enze, and promotes the development of the rural economy. It is also an urgent task. Urgent things that urgently need to be solved. To implement the renovation of dilapidated houses in rural areas, we have taken a series of effective measures to steadily advance this work. Our specific approach is:
Leaders attach importance to, clarify responsibilities, and implement accountability system.
The party committee and government of our town attach great importance to the work of reforming rural dilapidated houses, regard it as an important idea of practicing the "three represents," implement the scientific development concept, and build socialism.
In the new countryside, building a harmonious society, and focusing on a major event in the relationship between the party and the masses, we will make overall arrangements as the main task of doing practical things, benefiting the people and the people. Immediately after the county rural dilapidated house renovation work arrangement meeting, a team meeting was held to conduct research, and the leading group for the renovation of rural dilapidated buildings in Gaojialing Reclamation Farm was enriched and detailed, and detailed and feasible implementation plans were formulated to clarify the overall leadership responsibility and to be responsible for the leadership. Grasp, package the cadres in the village to promote and promote the households, to urge the cadres who have not been in place and have not completed according to time and tasks, start the accountability and accountability system, and link with the year-end evaluation and evaluation.
Do a good job in preparation for the renovation of dilapidated houses in rural areas
1. Seriously carry out investigation and mapping work. In order to accurately grasp the basic situation of families with rural housing difficulties in our field, we will adopt ways such as holding town and village cadre associations, villagers' representative meetings, public meetings, and entering the village to strengthen the publicity of rural dilapidated housing reform policies, so that the renovation of rural dilapidated houses is well known. On the basis of self-examination by each village, the investigation team of the township Baocun task force was investigated and verified one by one, and there was a preliminary understanding of the voluntary reform of rural dilapidated houses.
2. Carefully screen and identify the target households of the dangerous house renovation project. According to the number of tasks assigned to us by the superiors, the dangerous households after the screening are verified one by one in strict accordance with the implementation standards and conditions. In the determination of the object of the dangerous building, the “sunshine” operation is carried out, and the investigation and objects are always placed. Under the supervision of the general public, it is strictly carried out in accordance with the six procedures of “Application for Households, Investigation and Verification by Village Committees and Investigation Teams, Appraisal of Villagers' Meetings, Public Reports by Villagers' Committees, Review by Township People's Governments, and County Approvals”. After the object was examined, the economic status and the degree of dangerous housing of each household were carefully analyzed and determined, and the subsidy standards were determined. Make the renovation of dangerous buildings deeply rooted in the hearts of the people and establish a good
Good social image.
We will pay close attention to implementation and ensure the complete completion of rural dilapidated housing reconstruction tasks, scientific planning, and highlight local characteristics. In the principle of "first planning, post-building". Combine the transformation of rural dilapidated houses with the construction of new countryside, combine with the integration of resources, support the development of people's production, combine with rural planning and environmental remediation, and combine electricity, access, water, and convenience for people's production and life. In the implementation of the rural dilapidated housing renovation project, we must adhere to local conditions and lay the foundation for promoting new rural construction and promoting rural economic development.
2. Strengthen supervision and ensure the quality and progress of the renovation project. The project quality supervision and inspection has always been taken as a key task. After the object is determined, the township crisis reform leadership team will regularly supervise the crisis work and understand the problems in the renovation project. Actively communicate with the technical personnel of the County Dangerous Reform Office, promptly teach the building houses to build building knowledge, and deepen the construction of the house to check the quality of the building project. For the construction sites found in the construction that do not meet the design standards, the houses are required to be rectified within a time limit. To ensure the progress and quality of the project.
3. Formulate preferential policies and vigorously support the smooth implementation of the renovation of dilapidated buildings. In the process of renovation of dilapidated buildings, various departments have provided assistance within their capabilities. The land department in the homestead approval, special events, not only simplify the procedures, but also to reduce the use of free, all units in the town to open a green light for the renovation of dangerous buildings, so that the people have a real benefits.
4. Strengthen fund management to ensure standard operation. Strictly in accordance with the requirements of the county regulations, the Dangerous Housing Reform Subsidy Fund will be directly credited to the target farmers' subsidy passbook, and the first batch of funds will be disbursed before the end of the year, and the remaining funds will be allocated after the completion and acceptance of the project next year.
5. Create a file. In order to facilitate the inquiry, according to the requirements of the higher level, we will establish the data of all the dangerous houses of the dilapidated houses.
Third, the difficulties and problems
First, I have a long history of poverty, a deep poverty, and a small number of people living in crisis. Apart from state subsidies, the funds raised by individual crisis-hardened households are mostly built on borrowing, which brings new burdens to them.
Second, the subsidies for rural dilapidated housing reform are small, the project funds are single, and the number of rural dilapidated buildings is large, while the superior indicators are limited, which is difficult to meet the needs of rural dilapidated households.
Third, through the implementation of the renovation of dilapidated houses in rural areas, the dilapidated houses inhabited by the people have been improved, but the investment in supporting facilities is insufficient to keep up with the needs of building a new socialist countryside.
Summary of dangerous house renovation work
In 2019, under the correct leadership of the district committee government and the meticulous guidance of the higher-level business departments, our town has strengthened leadership, meticulous organization, pragmatic effectiveness, and overall promotion, and adhered to “coordinated planning, public volunteering, The principle of openness, fairness, and implementation in batches has achieved certain results in the renovation of dilapidated houses in rural areas, which has fundamentally improved the living conditions of some farmers. The relevant situation is summarized below. First, the basic situation
Dongqiao Town is located in the northeast of the XX District and governs 15 administrative villages and 1 street. At the end of 2019, the total number of households in the town was 8,816, with a total population of 37,000, with a total area of 104.25 square kilometers and an area of 55,000 mu of cultivated land. In 2019, the town's fiscal revenue was 3.89 million yuan, and the per capita net income of farmers was 4,100 yuan. The existing labor force is 21,000, the number of poor people is 1,800, and the number of people returning to poverty due to disasters is 700. It mainly produces rice, wheat, rape and other food crops, with an annual output of 36,000 tons of rice, 0.6 million tons of wheat and 0.9 million tons of rapeseed. The town has 50 km of village-level roads, including 20 km of gravel road, 5 km of cement road and 13 km of asphalt road. The town road Lisan Road and Heliuye Expressway pass through.
In 2019, according to the “National Dangerous House Appraisal Standards” survey, the town has 786 rural dilapidated houses, accounting for 8.9% of the total number of rural households. Among them, 413 households need to be demolished and resettled, accounting for 4.7% of the total number of households in the town; 286 households requiring secondary repair and replacement of local components, accounting for 3.2% of the total number of households in the town; individual components need to be replaced or slightly 87 households with three levels of dangerous buildings were repaired, accounting for 0.1% of the total number of farmers in the town.
Second, the implementation of rural dilapidated housing renovation
In 2019, in accordance with the spirit of the urban and district rural dilapidated housing reform work conference, the town implemented a total of 10 pilot projects for the renovation of dilapidated houses in rural areas, involving oil villages and Jinqiao villages. Among them, there are 6 households with five guarantees and 4 households with minimum guarantees. The superior subsidy fund is 100,000 yuan, the people self-raised 169,500 yuan, the operating rate is 100%, and 10 households have been completed, accounting for 100% of the number of tasks.
Third, the main practices and measures
First, strengthen leadership and clarify responsibilities at all levels. Our town has listed the implementation of the rural dilapidated building renovation project as one of the main tasks of the town. The town mayor has been appointed as the leader of the town, and the leader of the town is responsible for the deputy head of the town. The responsible persons of the relevant departments such as the town finance, civil affairs, national land, construction, poverty alleviation, and the Disabled Persons' Federation are members. The leading group of rural dilapidated building renovation projects strengthened the leadership coordination and command of this work. At the same time, the development and implementation of the "Dongqiao Town Rural Dangerous Housing Reform Implementation Plan", signed a letter of responsibility, clear the work responsibilities of all levels of departments, level one level, and implement at all levels.
The second is to strengthen publicity and give play to the role of the people. Through extensive publicity, the township and village cadre associations, villagers' representative meetings, public meetings, and village entrances were adopted to strengthen the publicity of rural dilapidated housing reform policies, so that rural dilapidated houses can be used as household names, and the peasant people will voluntarily carry out dangerous buildings. Through a large number of ideological work and policy propaganda, actively coordinate and help solve the practical difficulties of building houses, and stimulated their enthusiasm for actively transforming into dilapidated houses in rural areas and exerting the main role of the people.
The third is to pay attention to the review and select the target of the crisis. In the determination of the object of renovation of the dangerous house, the implementation of the sun operation, always put the investigation and object determination under the supervision of the general public, in strict accordance with the "householder application, village committee and investigation team investigation and verification, village group meeting democratic appraisal, village committee The five programs of Zhang Banggong and the town government review and declaration are carried out. After the object has been examined, the economic status of each household is carefully analyzed. According to the unified standards, the four types of subsidies for the five-guarantee households, the low-income households, the difficult households and the general households are determined. Principle of “step-by-step implementation”
The housing of the farmers who are extremely dangerous and extremely difficult in the family is firstly reconstructed.
The fourth is scientific planning, highlighting local characteristics. Based on the principle of “first planning, post-construction, and distinctive features”, from the reality of improving the living environment and changing the rural appearance, the combination of rural dilapidated housing renovation and new rural construction will be combined with the integration of resources and support for the development of production. Combined with township planning and environmental remediation, it is combined with power supply, access, water supply, and convenience for people's production and life. In the implementation of rural dilapidated building renovation projects, we adhered to local conditions and highlighted the characteristics of Dongqiao. The design styles, colors, construction standards and quality requirements for building houses were clearly defined to further promote the pace of new rural construction.
The fifth is to strengthen supervision and focus on quality supervision. Always strengthen the quality supervision and inspection of the project as a key task, formulate the supervision plan for the crisis work, set up a supervision team for the crisis work, and regularly supervise the work of the crisis, and the quality found in the construction does not meet the design standards. The construction of the house requires the construction of the house to be corrected within a time limit to ensure the progress and quality of the project.
The sixth is to strengthen fund management and ensure standard operation. Since the renovation of the dilapidated houses in the pilot villages, 10 households in rural areas have been reconstructed, with a total investment of 265,500 yuan. Among them, the state invested 100,000 yuan, and the farmers raised 169,500 yuan. In order to strengthen the management of the funds for the renovation of dangerous buildings, our town strictly follows the provisions of the “Administrative Measures for Special Funds for the Renovation of Dangerous Buildings in Rural Areas”, set up special accounts for special purposes, and establishes a strict accounting system and publicity system to strengthen the supervision of project funds. Ensure safe, efficient and safe operation of critical funds.
The seventh is to establish information files and improve the information on the crisis. In order to facilitate the inquiry, our town has established an archives database of rural dilapidated housing reconstruction data, which is responsible for completeness, truthfulness and accuracy. Do a good job in the collection of project materials, classification and archiving work.
Fourth, the effectiveness of work
First, it has improved the living conditions of people in rural areas. According to the current speed of transformation, adhering to 2-3 years will effectively solve the dangerous houses in rural areas. The living conditions of people in rural areas will be greatly improved. People in difficulty can basically bid farewell to dangerous houses. The situation of unsafe living due to natural disasters will be effectively reduced. The implementation of the renovation of dilapidated buildings is a moral project, and it is a popular project for people to solve problems.
The second is to lead and promote the construction of a new socialist countryside. Combine the implementation of rural dilapidated renovation projects with the transformation of villages and villages, the overall planning of the implementation of new rural construction, the expansion of towns and villages, the improvement of human and livestock drinking water, beautifying the environment, rural health and rural culture, and the development of production and social undertakings. The combination has effectively promoted the construction of new countryside.
The third is to change the concept of residence of rural people. Due to the influence of traditional concepts, the rural housing in our town has lagged behind the construction area, quality and aesthetics. It has not adapted to the development of the times. Since the implementation of the rural dilapidated building renovation project, it has effectively promoted the transformation of the people's concept of building houses. Greatly mobilized the enthusiasm of rural housing construction. Farmers with certain economic conditions in rural areas built houses with reference to the drawings and standards of ecological civilized homes.
Fourth, it has stimulated the confidence and determination of the people to develop production, get rid of poverty and become rich and well-off. The implementation of the rural dilapidated house reconstruction project solved the problem that the people wanted to build a house but lacked funds, eased the pressure on the people to build houses, and used limited funds to develop production, which stimulated the enthusiasm of the people to develop the economy and invest in the construction of a well-off society.
The fifth is to close the relationship between the party and the masses. In the rural dilapidated housing reconstruction work, help the people solve the problems encountered in the process of building houses,
The people felt the care of the party and the government, the people became rich, the hearts and cadres of the people were closer, the relationship between the party and the masses was close, and the prestige of the party and the government among the people was raised.
V. Difficulties and problems
First, there are few subsidies for rural dilapidated housing renovation, and the project has a single investment. The dangerous households themselves have accumulated less, the financial resources at the current level are limited, and the insufficient funds for the crisis are difficult to solve.
Second, due to the large number of rural dilapidated buildings, the pressure on supporting funds at the town level is large.
Third, through the implementation of the renovation of dilapidated houses in rural areas, although the dilapidated houses inhabited by the people have been reconstructed or added, the construction of supporting facilities such as water, electricity, roads, radio and television, rural firefighting, and public activities sites that are in danger of building houses has been insufficiently invested. And can't keep up with development needs.
Sixth, the next step is to work
First, further raise awareness, strengthen leadership, and enhance the sense of urgency and responsibility for doing a good job in crisis reform. In accordance with the requirements of the district committees and district governments, strengthen leadership, increase efforts, and transform rural dilapidated buildings into important projects to help the poor. Grasp it.
The second is to further improve the work program, strengthen investigation and research, find out the bottom, clarify the work objectives and tasks, select the target of rural dilapidated houses, and benefit the real poor families.
The third is to conscientiously do a good job in planning the new rural construction, and in line with the principle of adapting to local conditions, voluntarily, rushing, and gradually pushing forward, actively strive for national construction funds, focusing on solving extremely dangerous and extremely poor rural dilapidated households. We will strive to comprehensively solve the transformation of rural dangerous houses in the town in about three years.
The fourth is to integrate resources and increase investment in the renovation of dilapidated houses in rural areas. Actively integrate the construction of new rural construction, rural ecological civilization home construction, poverty alleviation and development, whole village promotion and other project construction funds. At the same time, actively seek help and support from the help units, and continuously increase investment in the renovation of rural dilapidated buildings.
The fifth is to further strengthen technical guidance and supervision and inspection to ensure the progress and quality of the project.
The sixth is to strengthen fund supervision and ensure the safe and efficient operation of funds to alleviate the pressure of self-raised funds and improve supporting facilities. In accordance with the principle of "two stages of new rural construction, such as "production development, lenient life, civilized town, clean village, and democratic management", we will actively guide the reformed households to develop new industries and get rid of poverty as soon as possible.
recommended article
- Summary of outstanding personal work for three years
- Summary of dance club activities
- 2019 year-end summary of the Youth League Committee
- "Eleventh" Tourism Golden Week work summary (three
- Accounting year-end summary essay
- A summary of the work of studying "eight honors and eight shame"
- Customer service work summary and plan
- Maintenance electrician summary
- Work summary essay
- A hotel building - total work in the first half of XX
- Teaching and research advanced individuals summary
- Summary of the construction of new socialist countryside
popular articles
- Motivate employees
- Hyun dance family impression sentence
- Clothing store manager's work summary
- Respect the teacher's famous words
- Space mood phrase
- Relieved words
- Parental love
- Year-end summary of the designer in 2019
- Life motto
- Encourage words 2019
- Spring Festival blessing
- Warehouse manager work summary
- Philosophical words 2019
- Legal maxim
- Non-mainstream sentence 2019
- Good sentence excerpt 2019
- Personal summary of party members in 2019
- Year-end summary of bank tellers in 2019
- Not afraid of failure
- Car maintenance internship summary
- Summary of the establishment of spiritual civilization in 2019
- Summary of comprehensive governance work in 2019
- Year-end summary of the library in 2019
- Summary of 2019 Ideological and Political Work
- 2014 motivational phrase
- What I said to my father 2019
- Blessing phrase
- Weibo's famous sayings
- Grateful mother's words
- Distressed sentence 2019