Work Summary > Production Work Summary

Summary of antifreeze and ice melting work in 2012-2019


The freezing period of 2003-2004 has ended. Although the ice-melting work has not been carried out, the prevention is still the principle of our station. We must make all preparations to prevent it from happening. The work of anti-freezing and freezing in 2003-2004 is summarized as follows:

1. In November 2003, according to the anti-freeze and ice-melting scheme issued by the superiors, the ice-melting operation tickets related to our station were filled in and reviewed in time, and bound into a book, which laid a technical foundation for the melting of ice.

1. In November 2003, the preparations for antifreeze and ice-melting materials were started: such as charcoal and cotton coats, which laid a material foundation for the melting of ice.

2. Carry out large inspections before freezing and melting, especially on the equipment side, report the defects as soon as possible, and get timely treatment. The equipment foundation was laid for the melting of ice.

3. In December 2003, the whole station staff was organized to conduct anti-freeze and ice-melting exercises, which improved the handling capacity of the anti-freeze and ice-melting accidents of the whole station personnel, and ensured that the staff of our station became the "coming to fight, the station can win" Team.

Although anti-freeze and ice-melting has not been carried out in 2003-2004, our station will summarize the shortcomings in our work on antifreeze and ice-melting, and better carry out the anti-freeze and ice-melting work in 2004-2005.