Year-end summary of the mechanic workshop
In XX, the machine repair workshop overcomes the difficulties of small number of personnel and heavy workload. All employees, under the correct command of the factory leaders, play a team spirit that is particularly capable of fighting. With a good working attitude, they overcome many difficulties and successfully complete the superiors’ release. At the end of the year, the company delivered a satisfactory answer to the company.
Regardless of the heavy workload of the work in the past year, always put safety first. Every 8th meeting, Lei did not move. Pre-job training for new employees. There are many fitters and welders in the mechanics. Dealing with equipment, wrenches, sledgehammers, oxygen, acetylene bottles, welders all day long, sometimes to enter the gas area, the risk factor is much larger than other workshops. We start with safety education and everything is done according to the requirements of the company and the factory security officer. More than two people will be placed under the zero line for maintenance, and there will be special guardianship to ensure safe production. No major accidents occurred during the year, and no economic losses were caused to the company's safety work, and tangible contributions were made.
On June 18, XX, the high line was successfully ignited. On August 6th, the steel was successfully put into operation and put into production, which brought considerable economic benefits to Beigang Group, and also increased the workload for the machine repair. In the finishing work of the high line, the machine repair and other workshops have done a lot of work, repairing and adjusting all the equipment, and correcting various defects that were missed during installation. Make the device use rate above 98%. It ensures that high-line equipment can also run normally in winter. Under the leadership of the squad leader, the shift fitter overcomes all kinds of difficulties and pays hard work for high-line production.
In the past year, the mechanic workshop has done a lot of effective work to ensure the production of strip steel: the three main climbing beds have been modified to reduce the parking rate and increase the productivity. The slab roller is well maintained and the yield is improved. Effective maintenance of the 24-meter cross-unit ensures normal operation. The patio 1# fan and the finishing 1# fan were disassembled. Multiple installations of the cyclone well 1#2# pump, and other pumps, including various types of oil pump pumps. The technical transformation gives the self-priming pump and the pressure plate of the cyclone well 4 times, which doubles the use period, reduces the number of inspections and saves a lot of labor. The re-settling of the sedimentation tank startup process reduces the startup time. Completely disassembled and finished bearings, universal joint heads and large and small couplings. And in conjunction with the maintenance of various types of cranes, to ensure the production of lifting requirements. Overhaul the rough rolling electric roller table, overhaul the 502 herringbone gear seat, and disassemble the large coupling of the reducer. 3 adventures to repair the old heating furnace, iron factory, high-line heating furnace 3 gas glasses valve.
Repairing old and waste is everywhere, repairing hundreds of various types of roller and electric roller. More than 30 pieces of gimbals were repaired, each of which advanced more than 7,000 yuan. The refurbishment and repair of various parts made up for the inconvenience caused by the company's spare parts supply. The company saved hundreds of thousands of yuan in material funds. The technical transformation of the table top roller table and the transformation of the 5# tapping roller road have improved the production capacity.
In October, the steel heating furnace and production line equipment were completely overhauled. Under the leadership of the deputy director and deputy director, the employees have been greedy late, overcome various difficulties, do not complain and suffer, and completed the task safely and satisfactorily during the maintenance period prescribed by the company.
In the production line, the fitter, welder, top pollution, high temperature, under the leadership of the squad leader, oil and sweat to pay for the first-line production.
Under the leadership of the squad leader, the women workers of the auxiliary types of work, overcoming various difficulties such as the last three classes, successfully completed various guarantees and made positive contributions to the first-line production. The rolling mills must not forget them.
This year, the problem of air leakage in the 20 furnace doors of the heating furnace was solved. And there are special people to transport oxygen and acetylene to ensure the safe use of the whole plant. At the beginning of the year, the old heating furnace expanded the use area of the plant. While doing my job well, I have done a lot of zero-work in the factory: such as loading and unloading warehouse materials and refueling high-line equipment. Install most of the high-line heating. Change the direction of the valve in the pump house. Reconstruction of baths, welding water tanks, and solving the big problem of staff bathing.
While doing a good job of production, we must pay close attention to labor discipline and attendance 3 times a day to keep each employee in the best working condition.
At the beginning of the new year, we will carry forward our strengths, make persistent efforts, overcome deficiencies, and overcome difficulties. I will learn from the advanced experience of other workshops with humility, and create more glory in my work in 2019.
Regardless of the heavy workload of the work in the past year, always put safety first. Every 8th meeting, Lei did not move. Pre-job training for new employees. There are many fitters and welders in the mechanics. Dealing with equipment, wrenches, sledgehammers, oxygen, acetylene bottles, welders all day long, sometimes to enter the gas area, the risk factor is much larger than other workshops. We start with safety education and everything is done according to the requirements of the company and the factory security officer. More than two people will be placed under the zero line for maintenance, and there will be special guardianship to ensure safe production. No major accidents occurred during the year, and no economic losses were caused to the company's safety work, and tangible contributions were made.
On June 18, XX, the high line was successfully ignited. On August 6th, the steel was successfully put into operation and put into production, which brought considerable economic benefits to Beigang Group, and also increased the workload for the machine repair. In the finishing work of the high line, the machine repair and other workshops have done a lot of work, repairing and adjusting all the equipment, and correcting various defects that were missed during installation. Make the device use rate above 98%. It ensures that high-line equipment can also run normally in winter. Under the leadership of the squad leader, the shift fitter overcomes all kinds of difficulties and pays hard work for high-line production.
In the past year, the mechanic workshop has done a lot of effective work to ensure the production of strip steel: the three main climbing beds have been modified to reduce the parking rate and increase the productivity. The slab roller is well maintained and the yield is improved. Effective maintenance of the 24-meter cross-unit ensures normal operation. The patio 1# fan and the finishing 1# fan were disassembled. Multiple installations of the cyclone well 1#2# pump, and other pumps, including various types of oil pump pumps. The technical transformation gives the self-priming pump and the pressure plate of the cyclone well 4 times, which doubles the use period, reduces the number of inspections and saves a lot of labor. The re-settling of the sedimentation tank startup process reduces the startup time. Completely disassembled and finished bearings, universal joint heads and large and small couplings. And in conjunction with the maintenance of various types of cranes, to ensure the production of lifting requirements. Overhaul the rough rolling electric roller table, overhaul the 502 herringbone gear seat, and disassemble the large coupling of the reducer. 3 adventures to repair the old heating furnace, iron factory, high-line heating furnace 3 gas glasses valve.
Repairing old and waste is everywhere, repairing hundreds of various types of roller and electric roller. More than 30 pieces of gimbals were repaired, each of which advanced more than 7,000 yuan. The refurbishment and repair of various parts made up for the inconvenience caused by the company's spare parts supply. The company saved hundreds of thousands of yuan in material funds. The technical transformation of the table top roller table and the transformation of the 5# tapping roller road have improved the production capacity.
In October, the steel heating furnace and production line equipment were completely overhauled. Under the leadership of the deputy director and deputy director, the employees have been greedy late, overcome various difficulties, do not complain and suffer, and completed the task safely and satisfactorily during the maintenance period prescribed by the company.
In the production line, the fitter, welder, top pollution, high temperature, under the leadership of the squad leader, oil and sweat to pay for the first-line production.
Under the leadership of the squad leader, the women workers of the auxiliary types of work, overcoming various difficulties such as the last three classes, successfully completed various guarantees and made positive contributions to the first-line production. The rolling mills must not forget them.
This year, the problem of air leakage in the 20 furnace doors of the heating furnace was solved. And there are special people to transport oxygen and acetylene to ensure the safe use of the whole plant. At the beginning of the year, the old heating furnace expanded the use area of the plant. While doing my job well, I have done a lot of zero-work in the factory: such as loading and unloading warehouse materials and refueling high-line equipment. Install most of the high-line heating. Change the direction of the valve in the pump house. Reconstruction of baths, welding water tanks, and solving the big problem of staff bathing.
While doing a good job of production, we must pay close attention to labor discipline and attendance 3 times a day to keep each employee in the best working condition.
At the beginning of the new year, we will carry forward our strengths, make persistent efforts, overcome deficiencies, and overcome difficulties. I will learn from the advanced experience of other workshops with humility, and create more glory in my work in 2019.
recommended article
- Summary of safety work in October
- Summary of safety and security work in April
- Enterprise safety production summary 2
- Summary of the safety production work of the town in 2019
- Summary of phytosanitary work in 2019
- Safety production summary
- 2019 Highway Road Administration Brigade
- Summary of 2019 work of flue-cured tobacco production office
- County Agricultural Bureau Safety Production Work Year-end Summary
- Summary of the work of the production department in 2019
- Chemical workshop annual work summary
- Annual summary of township safety production
popular articles
- The company's production department work summary year-end total
- 2013 safety production month summary
- I want to say something to the teacher.
- Du Yuexi's famous sayings
- Deaf people jingle 2019
- Experience in power safety in the first half of 2019
- a good saying that loves labor
- Tao Xingzhi's famous sayings
- Summary of the work of the 2019 power company
- Sad love sentence 2019
- The latest high school inspirational maxim
- Qq space mood phrase
- Thanks to the friend's words 2019
- Korean swear words
- 2014 production department work summary
- College entrance examination inspirational quotes
- Strong words
- A total of 2019 safety month activities of a project department
- English famous words
- Bing Xin’s famous words
- Taizai’s famous sayings
- Teacher's famous saying
- Injured sentence
- Year-end summary of production work in 2019
- Describe the fast time sentence 2019
- Summary of phytosanitary work in 2019
- Summary of safety work in the first half of 2012
- 2014 is very touching words
- Classical life motto
- Summary of work in the first half of the production workshop