Summary of workshop work of chemical fiber plant in 2019


Time is like an arrow, and the years are like a shuttle. In the twinkling of an eye, 2019 is nearing its end, and 2019, full of hopes and challenges, is coming. The past 2019 has been a year of growth and a little under-reaction for me. It is a new beginning and start in the face of the new year.

In 2019, under the guidance and criticism of the leaders of the factory, under the full support and cooperation of my colleagues and subordinates, I was dedicated and pragmatic, and resolutely implemented the requirements and tasks of the company's development plan. All production work continues to be diligent and meticulous, meticulous work attitude, self-feeling little progress in all kinds of work, but more is to make myself see many shortcomings. Looking back on the past year, I did some of the following work in my work:

1. Safety production and work inspection.

In 2019, under the requirements and deployment of the factory leaders, cooperate with the factory department and various departments to establish a system of inspections, do a good job of prevention and improvement measures, do a good job of safety hazards and inspection contents, and coordinate with the assistance of various departments, the whole plant in 2019 There were no major personal and equipment safety incidents in each workshop. In the work of sunrise, educate and organize the safe operation procedures for employees to learn the post, bearing in mind the principle of safety first. In the fire safety management work, we insist on daily inspections, and conduct a comprehensive inspection of fire equipment and fire protection key parts every quarter to eliminate hidden dangers. Actively organize and lead employees to participate in fire drills, so that each employee can basically master the safe operation procedures and fire-fighting skills of this post, establish a ledger, improve the inspection system, and do the original record and keep the maintenance work.

Second, assist production supervisors to do a good job in production.

In 2019, due to the global economic crisis, the market is generally depressed, so customers are increasingly demanding our products, which puts more and more pressure on our work. This year, there are fewer and fewer workshop staff, and the equipment is aging, and there are more and more faults, so we will invest more energy in our work. In the work, I strictly demand myself. In order to ensure the completion of production tasks, ensure the equipment integrity rate and full rate, I and Li Zhuangmei fully cooperate with each other, work hard and think about it, assist Li Zhuangmei to do a good job in production and environmental sanitation, and carefully debug To make suggestions for the successful completion of production tasks, do their job well, and strive to improve and improve their work ability and management ability.

Third, equipment maintenance and inspection work.

In 2019, we improved the equipment maintenance and maintenance requirements, formulated periodic maintenance contents and plans, established maintenance work accounts, and carried out various tasks in a step-by-step manner. In June, a 10 cubic air compressor was installed in the public works and the operation was started. The air compressor equipment was inspected every day to ensure that the auxiliary equipment such as the air compressor and the air dryer were operating normally. The maintenance and maintenance work of the drafting machine is not taken lightly, and the suggestions and opinions put forward by the employees to listen to the problems of the operation of the equipment are generally absorbed to ensure the full rate and operation rate of the machine. In 2019, the hydraulic devices of the 2# and 4# drafting machines were modified and improved, and the forming device of the 2# drafting machine was also controlled by the moldless operation and microcomputer control. In August, the quality of the wire on the machine was assisted by the workshop supervisor and the electrician to track and check, and solved the quality problems that occurred, so that the product quality stabilized. Approximately 400 spindles were repaired throughout the year, saving on lost costs.

Fourth, iron pipe preparation and maintenance work.

In 2019, the company led a total of 8,000 boxes of iron pipes, and repaired about 3,600 boxes of 20,000 tubes to prepare for the work before production. The iron pipe cover is seriously worn, wastes cost and expenses, and also takes up a lot of staff's working time and maintenance time. It is recommended that the factory department come up with a solution to prevent customers from crossing the tail wire, thus protecting the cover and saving. cost.

2019 is about to pass. In the face of 2019, I will continue to do all kinds of work, keep pace with the development of the company, follow the work arrangement of the factory, complete the work targets and production tasks of the factory in 2019, and actively cooperate with various departments. And every employee, strictly demanding themselves, improve innovation and initiative awareness, focus on team building, strengthen their business and quality capabilities, and shine for the company's development and growth.