Workshop deputy director work summary
Dear leaders:
It took almost two months for the deputy director of the final assembly shop, and I felt a lot during these two months. Let me talk about some of my suggestions and measures for managing the assembly shop. If there is any, please forgive me.
First, the quality of the electrical equipment installed directly affected by the quality of the company's products, but also affect the progress of the commissioning class. Therefore, it is important to improve the quality of Denso products. I think the reasons for the quality problems in the Denso are as follows:
1. The proficiency and quality of the workers;
2. Errors in technical drawings;
3. The ability to work in quality inspection;
4. The circuit board or the whole machine wiring design is not rationalized.
In view of the above problems and in order to better manage Denso, I think we can start from the following aspects:
1. Strengthen the training and management of workers. The quality inspection is the most clear of the problems that occur at the most and knows that the most common errors occur. Therefore, it is necessary for the quality inspection to conduct training for the places where problems are easy to occur before the project is done, so that the workers know that there is a need to pay attention; In the electric equipment class, an incentive system is set up to give appropriate economic rewards to workers with the highest inspection rate every month, which can improve the enthusiasm of workers for self-inspection.
2, there are three cases of technical drawings errors: trial products; products that are not often made; products that have just been improved. It is hoped that the technicians who design and proofread the drawings will be able to implement the responsibilities and ensure that the drawings to the Denso are prepared correctly.
3. The current quality inspection work is to check the finished product according to the drawings. The contents involved in the drawings are limited, not detailed enough, there is no uniform standard, and it is easy to subjective, so that disputes between quality inspection and workers will inevitably arise. It is recommended that the relevant circuit boards, wire ties, and the whole machine have a unified inspection standard.
4, the design of the circuit board should try to avoid jumpers, secant lines, the design of the whole machine wiring diagram should be clear and easy to confuse, should be distinguished by different line colors.
5. For the frequently problematic and important boards, they must be tested and then loaded onto the machine, such as the signal processing board of the optical platform.
6, should minimize the occurrence of material shortages. For the time to catch up, but not expected. Workers should be told before they do what they owe. The materials sent to the workshop by the warehouse, especially the important components, should be accurate and not too much.
Second, the problem of machine-loaded shifts is still relatively small. Basically can meet the requirements of production. But I hope that the company can recruit one or two more workers as soon as possible to meet the needs of future production.
Third, the commissioning class in order to debug the class can complete the task with quality and quantity, below I will propose suggestions and hopes for some products.
Fga-4100
1. Optical platform.
The optical platform is prone to problems. The signal processing board is for this situation. We will strengthen the detection of the signal processing board. We will do this test first, and we will ensure that the signal processing board can work normally before loading on the platform. The gain resistor setting of the preamplifier should be reasonable to improve the efficiency of the tuning platform.
2, the speed module speed module has more problems, mainly card to the technology. I hope that the technical department can solve the problem of zero speed and high speed as soon as possible.
3. Most of the solenoid valve and electromagnetic pump leakage failure is caused by the leakage of the solenoid valve and the electromagnetic pump, because the solenoid valve and the electromagnetic pump must be strengthened to ensure that they can be installed on the machine without leakage. In addition, the flow rate of individual electromagnetic pumps is small, and the flow rate is unstable. I hope that the technical department can solve it.
Fams-100
1. Flow module. The probability of a hop count in a traffic module is relatively large, and it is hoped that the technical department can solve this problem as soon as possible.
Finally, I hope that when the company replaces the product parts, it should do more experiments to ensure that it can meet the requirements of our products before it is put into production.
4. The coordination planning department of the assembly shop and the planning department should first understand the workshop situation and evaluate the production capacity of the workshop before making plans. The goal is to be realistic. For the case of material shortage, the planning department should solve it as soon as possible.
The above is some of my views and suggestions on the volume of the assembly shop, I hope to get leadership support and corrections.
Our goal is to complete production tasks on time every month, to ensure the demand for sales and inventory of the warehouse, so that leaders do not have to worry about production problems.
It took almost two months for the deputy director of the final assembly shop, and I felt a lot during these two months. Let me talk about some of my suggestions and measures for managing the assembly shop. If there is any, please forgive me.
First, the quality of the electrical equipment installed directly affected by the quality of the company's products, but also affect the progress of the commissioning class. Therefore, it is important to improve the quality of Denso products. I think the reasons for the quality problems in the Denso are as follows:
1. The proficiency and quality of the workers;
2. Errors in technical drawings;
3. The ability to work in quality inspection;
4. The circuit board or the whole machine wiring design is not rationalized.
In view of the above problems and in order to better manage Denso, I think we can start from the following aspects:
1. Strengthen the training and management of workers. The quality inspection is the most clear of the problems that occur at the most and knows that the most common errors occur. Therefore, it is necessary for the quality inspection to conduct training for the places where problems are easy to occur before the project is done, so that the workers know that there is a need to pay attention; In the electric equipment class, an incentive system is set up to give appropriate economic rewards to workers with the highest inspection rate every month, which can improve the enthusiasm of workers for self-inspection.
2, there are three cases of technical drawings errors: trial products; products that are not often made; products that have just been improved. It is hoped that the technicians who design and proofread the drawings will be able to implement the responsibilities and ensure that the drawings to the Denso are prepared correctly.
3. The current quality inspection work is to check the finished product according to the drawings. The contents involved in the drawings are limited, not detailed enough, there is no uniform standard, and it is easy to subjective, so that disputes between quality inspection and workers will inevitably arise. It is recommended that the relevant circuit boards, wire ties, and the whole machine have a unified inspection standard.
4, the design of the circuit board should try to avoid jumpers, secant lines, the design of the whole machine wiring diagram should be clear and easy to confuse, should be distinguished by different line colors.
5. For the frequently problematic and important boards, they must be tested and then loaded onto the machine, such as the signal processing board of the optical platform.
6, should minimize the occurrence of material shortages. For the time to catch up, but not expected. Workers should be told before they do what they owe. The materials sent to the workshop by the warehouse, especially the important components, should be accurate and not too much.
Second, the problem of machine-loaded shifts is still relatively small. Basically can meet the requirements of production. But I hope that the company can recruit one or two more workers as soon as possible to meet the needs of future production.
Third, the commissioning class in order to debug the class can complete the task with quality and quantity, below I will propose suggestions and hopes for some products.
Fga-4100
1. Optical platform.
The optical platform is prone to problems. The signal processing board is for this situation. We will strengthen the detection of the signal processing board. We will do this test first, and we will ensure that the signal processing board can work normally before loading on the platform. The gain resistor setting of the preamplifier should be reasonable to improve the efficiency of the tuning platform.
2, the speed module speed module has more problems, mainly card to the technology. I hope that the technical department can solve the problem of zero speed and high speed as soon as possible.
3. Most of the solenoid valve and electromagnetic pump leakage failure is caused by the leakage of the solenoid valve and the electromagnetic pump, because the solenoid valve and the electromagnetic pump must be strengthened to ensure that they can be installed on the machine without leakage. In addition, the flow rate of individual electromagnetic pumps is small, and the flow rate is unstable. I hope that the technical department can solve it.
Fams-100
1. Flow module. The probability of a hop count in a traffic module is relatively large, and it is hoped that the technical department can solve this problem as soon as possible.
Finally, I hope that when the company replaces the product parts, it should do more experiments to ensure that it can meet the requirements of our products before it is put into production.
4. The coordination planning department of the assembly shop and the planning department should first understand the workshop situation and evaluate the production capacity of the workshop before making plans. The goal is to be realistic. For the case of material shortage, the planning department should solve it as soon as possible.
The above is some of my views and suggestions on the volume of the assembly shop, I hope to get leadership support and corrections.
Our goal is to complete production tasks on time every month, to ensure the demand for sales and inventory of the warehouse, so that leaders do not have to worry about production problems.
recommended article
- Summary of safety and security work in April
- Summary of the safety production work of the town in 2019
- Chemical workshop annual work summary
- Summary of phytosanitary work in 2019
- Summary of 2019 work of flue-cured tobacco production office
- Annual summary of township safety production
- 2019 Highway Road Administration Brigade
- Enterprise safety production summary 2
- Summary of the work of the production department in 2019
- Summary of safety work in October
- County Agricultural Bureau Safety Production Work Year-end Summary
- Safety production summary
popular articles
- Deaf people jingle 2019
- Summary of the work of the 2019 power company
- Tao Xingzhi's famous sayings
- The company's production department work summary year-end total
- Bing Xin’s famous words
- English famous words
- I want to say something to the teacher.
- Strong words
- 2013 safety production month summary
- Korean swear words
- Summary of safety work in the first half of 2012
- The latest high school inspirational maxim
- Summary of phytosanitary work in 2019
- a good saying that loves labor
- Sad love sentence 2019
- 2014 is very touching words
- Qq space mood phrase
- Thanks to the friend's words 2019
- Taizai’s famous sayings
- College entrance examination inspirational quotes
- Summary of work in the first half of the production workshop
- Classical life motto
- Year-end summary of production work in 2019
- Du Yuexi's famous sayings
- Teacher's famous saying
- Injured sentence
- A total of 2019 safety month activities of a project department
- 2014 production department work summary
- Experience in power safety in the first half of 2019
- Describe the fast time sentence 2019