Summary of construction work in the 2019 area


In 2019, in accordance with the requirements of the district government and the construction bureau, the company closely focused on the goals and tasks of the year, strengthened management, further strengthened the supervision and assessment of facility maintenance, and worked hard to improve the level of facility management, and completed the first half of the year. work tasks.

First, the main work completed throughout the year

Do a good job in maintenance management

1, better complete daily maintenance tasks

By the end of May, the municipal government had repaired 15135 square meters of roadways, 11115 square meters of sidewalks, 2804 meters of roads along the road, 81.7 kilometers of dredging supervisors, 46.59 kilometers of branch pipes, 143 sets of rain cover frame replacement, river snoring and foreign transport floating. 882 cubic meters. A total of 992 trees in the greening area, 25,783 trees in the street, 25,101 in the shrubs, 60,101 in the shrubs, 9,19753.7 square meters in the pruned plants, 129,891 square meters in the mowed lawn, 20109.5 cubic meters in watering, 206 classes in the sprinklers, 880 kg in fertilization, replacement Flower 70480 pots.

2, work hard to focus on special projects

1) Cooperate with the completion of the 2019 street and road improvement project survey and engineering project work. According to the application of the district and the review of the city platform, 13 non-municipal roads such as Hehui Street and Nandonggua City, and 13 non-municipal roads such as Yunnan Road and Hongmiao Alley have been newly rebuilt. The total cost of painting is 8.525 million yuan. The current remediation project has been officially launched and the project is scheduled to be completed by the end of September.

2) Complete the renovation of the drainage pipe network of Fenghuang Street and Fenghuang East Street. Among them, the Fenghuang Street pipe network was replaced with a diameter of 500cm, a supervisor of 124 meters, a 400cm main pipe of 82 meters, a branch pipe of 156 meters, and a total of 26 wells and rainwater wells. The Fenghuang East Street pipe network was replaced with a total of 185 meters in diameter and 400 meters in diameter. The branch pipe is 73.9 meters, and 38 wells and rainwater wells have been reconstructed.

3) Implement new projects on the roads of Jinyin Street and Changjiang New Village. A total of 2,159 square meters of roadway was completed, and 601 square meters of concrete pavement was completed. The road was replaced by 850 meters, 12 wells were upgraded, 10 rainwater wells were built, and 36 meters of branch pipes were laid. In order to meet the city's re-consultation meeting, in mid-March, the organization's maintenance company completed the new project of the Yangtze River New Village road in one week. The project has a total of 305 square meters of sidewalks, milling and laying 325 square meters of roadway and 115 meters of replacement road teeth.

4) Actively do a good job in winter and spring planting and transplanting and new model roads. According to the winter and spring planting planting plan issued by the city's greening department, combined with the new model horse road seedlings migration work, do a good job in the relevant transplant plan, and carry out a large number of seedling replanting for the main and secondary trunk roads and square gardens of the missing plants. Among them, the road is mainly replanted with Nanrui Road, Jiangbeibei Road, Sanpailou Street, Xikang Road, Huyu Road, Huyu North Road and Zhongshan North Road. The park is mainly replanted with Sanpai Building and Rubber Factory; Yangyueguang Square, especially Yangyueguang Square, has added more than 20 varieties such as camphor and metasequoia on the original basis, which has improved the grade. As of mid-May, the task of replanting has been exceeded, and 660 large trees, 91,237 bushes, 1,836 square meters of lawn and ground cover, and 70,480 pots of grasses have been planted.

5) Seriously grasp the disease prevention and control work. Due to the phenomenon of “warm winter” this year, the average temperature is high, and various germs and pests are fierce, which has brought difficulties to this year's plant protection work. Therefore, in the daily maintenance inspections, I increased the observation of pests and diseases, so that early detection, early warning, and early arrangements were made, so that pests and diseases did not break out in large areas in our area, ensuring plant growth and landscape effects, and not taking the citizens out of the belt. Bad influence.

3. Adjust assessment methods and increase supervision and inspection work

This year, the municipal and green maintenance assessments were adjusted on the basis of last year. On the one hand, the project has been upgraded to the content of the project, and on the other hand, the city-level professional assessment and monthly assessment have been combined to improve the maintenance assessment. The standard has expanded the number of examinations.

In the municipal area, we will increase the supervision of river cleaning work, and take the river cleaning work as a must-see project for daily inspections. We will strengthen management and measures for weak links, and urge maintenance companies to increase investment in personnel and facilities. The remaining problems of construction are tightly grasped, actively coordinated, and continuously tracked and urged to resolve.

In terms of greening, for the green belt of Jinshengda Market section of Jiangdong Road, and the greening of Sanpianlou Street, the people are trampled on the destruction phenomenon, and they are appealing within the scope of their ability. Through media cooperation, the maintenance of the facilities is achieved and certain effects are achieved.

4, do a good job in preventing flood prevention

According to the requirements of the Municipal Municipal Platform and the Greening Department of the Landscape Bureau, the anti-Taiwan anti-mite plan was formulated, the duties were strengthened, the key anti-Taiwan anti-smashing road sections, emergency measures and rescue teams were clarified, and the organization provided a guarantee for the anti-Taiwan flood prevention work. At the same time, we must do a good job in the implementation of anti-Taiwan flood control to ensure the safety of facilities. Since March, arrange maintenance companies to carry out

The self-examination work was carried out in advance, and safety hazards were eliminated in time. Self-examination and self-correction work was carried out on public green spaces such as street trees, squares and gardens under the jurisdiction. Up to now, in terms of greening, 41 species of dead trees have been felled, 53 strains have been repaired, 435 strains have been cleaned, 253 strains have been pruned, and 72 trees have been pruned. On the municipal side, check the seven hydrological survey points in the district one by one to ensure that the facilities are in good condition, urge the implementation of the report personnel, prepare emergency plans and emergency preparations, and respond to emergencies at any time; the municipality should increase the number of hinges in flood-prone areas. The number of fishing trips, when the rainfall is large, send people to the road to inspect and do the drainage work.

Do a good job in facility supervision

1. Do a good job in the supervision of digital information cases

Complete the received city information management case on time. Do timely registration, sorting, dispatching, supervising, and selling cases. In the first half of the year, 776 cases were completed, including 576 municipalities and 200 greenings.

2. Grasp the supervision of key projects

Assist in the rapid completion of tree transplanting and green space occupation in the Northern Link of the Inner Ring. Do contract signing, cost negotiation and payment for municipal and green supporting projects. In the process of implementation, the company dispatched special personnel to coordinate and supervise on the spot, tracked the whole process, and completed the task safely and high-quality. In the early stage, more than 300 large trees were transplanted, and the flowering shrubs and green land were about 10,000 square meters. Since our service was in place, we got the city. The leadership of the construction committee praised.

3. Do a good job in the examination and approval of administrative licenses

Upon completion of the administrative licensing task, the preliminary application for greening projects was completed in accordance with the law. In the first half of the year, a total of 66 cases were completed, and the implementation of the basic components was basically implemented. At the same time, the greening supervision after approval is mainly carried out: the tree cutting of the infrastructure site of the South Medical University, the planting of the 3503 factory, the trees along the northern line of the fast inner ring, the green land migration, and the tree cutting of the community service buildings in the Ninghai Road street. Acting according to the requirements of the permit, and can protect the urban greening results, the government is satisfied, the applicants are satisfied and the unit leaders are satisfied. In particular, the transplanting street trees involved in the construction of the fast inner ring model road project, we arrange to replant to other roads as the street trees, the flower shrub plate to move nearby, the effect is fast, the effect is good, and a successful method for the future road reconstruction tree transplanting.

4. Stop the illegal activities in the destruction of facilities in a timely manner

Timely stop the illegal activities of the municipal facilities and ensure that the municipal facilities are in good condition. Through inspections and public reports, 22 incidents of violations were discovered and investigated, such as greening: Suning Yinhe ruined green, district real estate bureau and sanitation in temporary green sheds, Longjiang development ruined green pavement in Longyuan West Road, a property The intermediary in Xikang Road privately cut trees, the Provincial Sports Bureau service center to eradicate the lawn construction parking lot, Huilin Green State property to eliminate green lawns at its door. Municipal aspects: Milan Development Company illegally occupied roads in thick-loaded lanes, private city sewage discharge blocked school gate sewers, provincial-level organs of Kuling Road, newly occupied and damaged roads, and private excavation, chaos, and disorder of other pipeline units After a satisfactory solution, some units paid the fees and some units wrote the inspection.

Check, made a guarantee, achieved management purposes, and guaranteed the integrity of the facility.

5, for the people to do practical things, do a good job

Complaints and complaints within the jurisdiction of 73 cases, to achieve the implementation of the pieces, can not be resolved to explain to the complainant, at the same time, enthusiastically solve the greening, municipal difficulties and problems encountered by the people. There are mainly roads and trees affecting housing problems. Mogan Road, Ninghai Road, Qiling Road and other main roads and community residents have large trees affecting residents' lives and the dangers of dangerous trees and dangerous trees. The migration of ginkgo in the backyard of an old man in Zizhulin In the home of a resident of Daijiaxiang, the trees fell on the wall and other issues were resolved in a timely manner. As the service is timely and in place, our work is well received by the client.

This year, a total of 9 proposals from the NPC and CPPCC representatives were handled, and 5 proposals were reviewed. Regarding the problems reflected in the proposal, actively contact with the maintenance company, understand the situation, and jointly resolve the solution, timely arrange and deal with the problems that can be solved, and explain the problems that are not under our jurisdiction, and all of them are satisfied.

6. Actively cooperate with the city platform to do all kinds of supervision work.

Completed 77 supervisions for the approval of the Municipal Public Utilities Bureau, mainly including the renovation of the Fenghuang East Street drainage network, the water and electric access of the Leo Building, the construction of the new city sewage pipe, and the construction of the Fujian Road auction advertising space. , on-site signs, construction period, excavation area and other aspects of supervision, regulate its construction behavior.

Strengthen internal management

1. In line with the reform of the new round of income distribution system, we actively contacted the competent department of professional titles and put ourselves in the interests of the employees. At the beginning of the year, we completed the appointment of the professional and technical positions of the firm, so that employees can be employed according to the implementation of the work reform. The professional and technical positions employed are cashed. We also work hard for employees who are temporarily unable to be appointed due to job setting and other reasons.

Prepare a special report, report to the title office, and actively strive to adjust the position of the firm. In the first half of the year, the registration of economic professional title examinations was completed.

In 2019, in accordance with the requirements of the district government and the construction bureau, the company closely focused on the goals and tasks of the year, strengthened management, further strengthened the supervision and assessment of facility maintenance, and worked hard to improve the level of facility management, and completed the first half of the year. work tasks.

First, the main work completed throughout the year

Do a good job in maintenance management

1, better complete daily maintenance tasks

By the end of May, the municipal government had repaired 15135 square meters of roadways, 11115 square meters of sidewalks, 2804 meters of roads along the road, 81.7 kilometers of dredging supervisors, 46.59 kilometers of branch pipes, 143 sets of rain cover frame replacement, river snoring and foreign transport floating. 882 cubic meters. A total of 992 trees in the greening area, 25,783 trees in the street, 25,101 in the shrubs, 60,101 in the shrubs, 9,19753.7 square meters in the pruned plants, 129,891 square meters in the mowed lawn, 20109.5 cubic meters in watering, 206 classes in the sprinklers, 880 kg in fertilization, replacement Flower 70480 pots.

2, work hard to focus on special projects

1) Cooperate with the completion of the 2019 street and road improvement project survey and engineering project work. According to the application of the district and the review of the city platform, 13 non-municipal roads such as Hehui Street and Nandonggua City, and 13 non-municipal roads such as Yunnan Road and Hongmiao Alley have been newly rebuilt. The total cost of painting is 8.525 million yuan. The current remediation project has been officially launched and the project is scheduled to be completed by the end of September.

2) Complete the renovation of the drainage pipe network of Fenghuang Street and Fenghuang East Street. Among them, the Fenghuang Street pipe network was replaced with a diameter of 500cm, a supervisor of 124 meters, a 400cm main pipe of 82 meters, a branch pipe of 156 meters, and a total of 26 wells and rainwater wells. The Fenghuang East Street pipe network was replaced with a total of 185 meters in diameter and 400 meters in diameter. The branch pipe is 73.9 meters, and 38 wells and rainwater wells have been reconstructed.

3) Implement new projects on the roads of Jinyin Street and Changjiang New Village. A total of 2,159 square meters of roadway was completed, and 601 square meters of concrete pavement was completed. The road was replaced by 850 meters, 12 wells were upgraded, 10 rainwater wells were built, and 36 meters of branch pipes were laid. In order to meet the city's re-consultation meeting, in mid-March, the organization's maintenance company completed the new project of the Yangtze River New Village road in one week. The project has a total of 305 square meters of sidewalks, milling and laying 325 square meters of roadway and 115 meters of replacement road teeth.

4) Actively do a good job in winter and spring planting and transplanting and new model roads. According to the winter and spring planting planting plan issued by the city's greening department, combined with the new model horse road seedlings migration work, do a good job in the relevant transplant plan, and carry out a large number of seedling replanting for the main and secondary trunk roads and square gardens of the missing plants. Among them, the road is mainly replanted with Nanrui Road, Jiangbeibei Road, Sanpailou Street, Xikang Road, Huyu Road, Huyu North Road and Zhongshan North Road. The park is mainly replanted with Sanpai Building and Rubber Factory; Yangyueguang Square, especially Yangyueguang Square, has added more than 20 varieties such as camphor and metasequoia on the original basis, which has improved the grade. As of mid-May, the task of replanting has been exceeded, and 660 large trees, 91,237 bushes, 1,836 square meters of lawn and ground cover, and 70,480 pots of grasses have been planted.

5) Seriously grasp the disease prevention and control work. Due to the phenomenon of “warm winter” this year, the average temperature is high, and various germs and pests are fierce, which has brought difficulties to this year's plant protection work. Therefore, in the daily maintenance inspections, I increased the observation of pests and diseases, so that early detection, early warning, and early arrangements were made, so that pests and diseases did not break out in large areas in our area, ensuring plant growth and landscape effects, and not taking the citizens out of the belt. Bad influence.
More articles on the 2019 district construction work summary>>
Civil Affairs Bureau Office 2010 Summary Environmental Protection Bureau 2019 Work Summary County Product Quality Supervision and Inspection Institute 2019 Annual Work Summary Highway Toll Station 2019 Annual Work Summary Township Social Affairs Office 2019 Work Summary City Planning Administration 2019 Safety Production Work Summary Food Bureau 2019 Annual work summary Environmental Protection Bureau 2019 work summary [return to the administrative logistics work summary column list]

3. Adjust assessment methods and increase supervision and inspection work

This year, the municipal and green maintenance assessments were adjusted on the basis of last year. On the one hand, the project has been upgraded to the content of the project, and on the other hand, the city-level professional assessment and monthly assessment have been combined to improve the maintenance assessment. The standard has expanded the number of examinations.

In the municipal area, we will increase the supervision of river cleaning work, and take the river cleaning work as a must-see project for daily inspections. We will strengthen management and measures for weak links, and urge maintenance companies to increase investment in personnel and facilities. The remaining problems of construction are tightly grasped, actively coordinated, and continuously tracked and urged to resolve.

In terms of greening, for the green belt of Jinshengda Market section of Jiangdong Road, and the greening of Sanpianlou Street, the people are trampled on the destruction phenomenon, and they are appealing within the scope of their ability. Through media cooperation, the maintenance of the facilities is achieved and certain effects are achieved.

4, do a good job in preventing flood prevention

According to the requirements of the Municipal Municipal Platform and the Greening Department of the Landscape Bureau, the anti-Taiwan anti-mite plan was formulated, the duties were strengthened, the key anti-Taiwan anti-smashing road sections, emergency measures and rescue teams were clarified, and the organization provided a guarantee for the anti-Taiwan flood prevention work. At the same time, we must do a good job in the implementation of anti-Taiwan flood control to ensure the safety of facilities. Since March, arrange maintenance companies to carry out

The self-examination work was carried out in advance, and safety hazards were eliminated in time. Self-examination and self-correction work was carried out on public green spaces such as street trees, squares and gardens under the jurisdiction. Up to now, in terms of greening, 41 species of dead trees have been felled, 53 strains have been repaired, 435 strains have been cleaned, 253 strains have been pruned, and 72 trees have been pruned. On the municipal side, check the seven hydrological survey points in the district one by one to ensure that the facilities are in good condition, urge the implementation of the report personnel, prepare emergency plans and emergency preparations, and respond to emergencies at any time; the municipality should increase the number of hinges in flood-prone areas. The number of fishing trips, when the rainfall is large, send people to the road to inspect and do the drainage work.

Do a good job in facility supervision

1. Do a good job in the supervision of digital information cases

Complete the received city information management case on time. Do timely registration, sorting, dispatching, supervising, and selling cases. In the first half of the year, 776 cases were completed, including 576 municipalities and 200 greenings.

2, grab

Good supervision of key projects

Assist in the rapid completion of tree transplanting and green space occupation in the Northern Link of the Inner Ring. Do contract signing, cost negotiation and payment for municipal and green supporting projects. In the process of implementation, the company dispatched special personnel to coordinate and supervise on the spot, tracked the whole process, and completed the task safely and high-quality. In the early stage, more than 300 large trees were transplanted, and the flowering shrubs and green land were about 10,000 square meters. Since our service was in place, we got the city. The leadership of the construction committee praised.

3. Do a good job in the examination and approval of administrative licenses

Upon completion of the administrative licensing task, the preliminary application for greening projects was completed in accordance with the law. In the first half of the year, a total of 66 cases were completed, and the implementation of the basic components was basically implemented. At the same time, the greening supervision after approval is mainly carried out: the tree cutting of the infrastructure site of the South Medical University, the planting of the 3503 factory, the trees along the northern line of the fast inner ring, the green land migration, and the tree cutting of the community service buildings in the Ninghai Road street. Acting according to the requirements of the permit, and can protect the urban greening results, the government is satisfied, the applicants are satisfied and the unit leaders are satisfied. In particular, the transplanting street trees involved in the construction of the fast inner ring model road project, we arrange to replant to other roads as the street trees, the flower shrub plate to move nearby, the effect is fast, the effect is good, and a successful method for the future road reconstruction tree transplanting.

4. Stop the illegal activities in the destruction of facilities in a timely manner

Timely stop the illegal activities of the municipal facilities and ensure that the municipal facilities are in good condition. Through inspections and public reports, 22 incidents of violations were discovered and investigated, such as greening: Suning Yinhe ruined green, district real estate bureau and sanitation in temporary green sheds, Longjiang development ruined green pavement in Longyuan West Road, a property The intermediary in Xikang Road privately cut trees, the Provincial Sports Bureau service center to eradicate the lawn construction parking lot, Huilin Green State property to eliminate green lawns at its door. Municipal aspects: Milan Development Company illegally occupied roads in thick-loaded lanes, private city sewage discharge blocked school gate sewers, provincial-level organs of Kuling Road, newly occupied and damaged roads, and private excavation, chaos, and disorder of other pipeline units After a satisfactory solution, some units paid the fees, some units wrote inspections, made guarantees, achieved management purposes, and ensured the integrity of the facilities.

5, for the people to do practical things, do a good job

Complaints and complaints within the jurisdiction of 73 cases, to achieve the implementation of the pieces, can not be resolved to explain to the complainant, at the same time, enthusiastically solve the greening, municipal difficulties and problems encountered by the people. There are mainly roads and trees affecting housing problems. Mogan Road, Ninghai Road, Qiling Road and other main roads and community residents have large trees affecting residents' lives and the dangers of dangerous trees and dangerous trees. The migration of ginkgo in the backyard of an old man in Zizhulin In the home of a resident of Daijiaxiang, the trees fell on the wall and other issues were resolved in a timely manner. As the service is timely and in place, our work is well received by the client.

This year, a total of 9 proposals from the NPC and CPPCC representatives were handled, and 5 proposals were reviewed. Regarding the problems reflected in the proposal, actively contact with the maintenance company, understand the situation, and jointly resolve the solution, timely arrange and deal with the problems that can be solved, and explain the problems that are not under our jurisdiction, and all of them are satisfied.

6. Actively cooperate with the city platform to do all kinds of supervision work.

Completed 77 supervisions for the approval of the Municipal Public Utilities Bureau, mainly including the renovation of the Fenghuang East Street drainage network, the water and electric access of the Leo Building, the construction of the new city sewage pipe, and the construction of the Fujian Road auction advertising space. , on-site signs, construction period, excavation area and other aspects of supervision, regulate its construction behavior.

Strengthen internal management

1. In line with the reform of the new round of income distribution system, we actively contacted the competent department of professional titles and put ourselves in the interests of the employees. At the beginning of the year, we completed the appointment of the professional and technical positions of the firm, so that employees can be employed according to the implementation of the work reform. The professional and technical positions employed are cashed. We also work hard for employees who are temporarily unable to be appointed due to job setting and other reasons.

Prepare a special report, report to the title office, and actively strive to adjust the position of the firm. In the first half of the year, the registration of economic professional title examinations was completed.

2. This year is the year of implementation of the reform of the income distribution system of public institutions. The industrial reform involves the vital interests of the employees, and the policies are strong and the situation is complicated. On the basis of earnest study on the work reform archives, we carefully carried out the basic work, and reported it after repeated verification. The first round of fund transfer work was completed and approved at the end of April and reissued in place. The normal promotion work in the next step has also been completed, waiting for the approval of the superiors.

3. According to the archives regulations of the relevant departments, earnestly do a good job in the calculation of the base of the new round of pension insurance and unemployment insurance, and check the data, and complete the report on time. At the same time, earnestly do a good job in the annual inspection, change of labor and social security certificates and the registration of social insurance registration certificates.

4. Complete the Spring Festival, Lantern Festival, Labor Day, Dragon Boat Festival and other festivals as well as summer labor insurance, high temperature fees and other welfare expenses, welfare products procurement and distribution.

5. Do a good job in financial management, complete the accounts of revenue and expenditure, reflect financial information in a timely and accurate manner, and provide decision-making basis for leaders. Actively contact the settlement center to make timely accounting work. Do a good job in financial accounting, timely collect and allocate relevant construction funds, maintenance funds and special funds. In the first half of the year, a total of 2.749 million yuan was collected for Huyi Road, Zhongshan North Road, New Model Fan Road, and MRT, and the maintenance fund was 12.55 million yuan, and the special fund was 5,276,800 yuan.

6. Strictly follow the regulations of the District Finance Bureau and the District Price Bureau, do a good job of extra-budgetary administrative fees, and cooperate with the Construction Bureau to complete the annual inspection of the XX annual price charge permit and obtain a perfect score.

7. Actively carry out propaganda work, strive to expand unit visibility, timely report maintenance and supervision information, and complete 16 pieces of information in the first half of the year, 4 of which were accepted by Drum Tower Information and 6 were accepted by the city platform website. At the same time, in order to better display the results of our work, we also actively contacted the advertising company at the beginning of the year, and selected some of the contrast photos of some XX streets and lanes, with text, designed and produced 1000 promotional brochures, and brothers. The exchanges between the unit and the relevant units of other provinces and cities have played a good role in publicity.

Fourth, vigorously carry out public greening

1, using a variety of forms, widely publicized

This year, we set up the Green Mould City as an entry point, adopting various forms, widely publicizing and launching, creating an atmosphere in which the whole people participate in creating a green mold city.

On the eve of Arbor Day, Bao Yongan, secretary of the district party committee, led the leaders of the district committee, district people's congress, district government, district CPPCC and district Jiangdong New District Administrative Committee, District Construction Bureau, and Jiangdong Sub-district Office to come to Longteng Street in Jiangdong New District. Obligation to plant trees. A total of more than 70 plants were planted.

On the afternoon of March 10, the District Greening Committee, District Construction Bureau, Hunan Road Street, District Municipal Facilities Comprehensive Maintenance Management Office, Wanrong Company, Gulou Park, Wulongtan Park and other units held "You and I participated in the Shanxi Road Plaza". "Promoting the Green Mould City." The propaganda and consultation activities, promoting the "Green Nanjing, Ecological Drum Tower" construction achievements, in recent years, the implementation of the national voluntary tree planting campaign results, urban greening, voluntary tree planting scientific knowledge, policy and regulation publicity. It also carried out the recognition and approval of green registration, the drum team's cultural performance activities, and distributed promotional materials such as paper cups, umbrellas, and roof greening manuals. The answer was more than 600 pots. The atmosphere was warm, the people participated actively, the interaction was frequent, and the gifts were in short supply.

Striving for a national model city is not only the central task of the government, but also the common aspiration of all the people. The citizens of the Gulou District have taken action and participated in the creation. The street set up or adjust the regional greening association to conduct publicity and consultation in the center of the jurisdiction. The community publishes blackboards, bulletin boards, and slogans, enriches the greening and environmental protection volunteer team, signs the approval and adoption agreement, and residents can sign up for tree-planting greens, or give flowers and bonsai loose soil, or clean up.

Litter of green land. In order to express the determination to participate in the creation, the cadres and urban management team members of the Hunan Sub-district Office solemnly signed their own names on the banner of “Creating a Green Model City and Building a Green Center in the Eastern City”. The banner is in Shanxi Road Plaza, in Dingjia. The bridges, Gaoyunling, Wuzhixiang, Hubei Road, Dafangxiang and other communities take turns, and residents from all walks of life help the old and the young to sign on the banners.

In order to push the creation of the Green Mould City to the grassroots level, on the afternoon of April 13th, in the Fenghuang New Village Community of Mozhen Street in Gulou District, the Party Leaders of the District Letters and Calls Bureau, the Party Members of the District Green Committee and all the Party members of the Community Party Branch acted together. The "Party Members' Dedication Day" was held. During the event, all the comrades signed their own names on the banner of “Creating a Green Model City and Building a Green Center in the Eastern City”, expressing their confidence and determination to serve the people and participate in the creation of a green model city. 60 party members and activists,

Under the technical guidance of the comrades of the Green Committee, pruning flower shrubs, spherical trees, hedges, cleaning up litter and garbage in the green space, not afraid of dirty, not afraid of being exhausted, everyone’s face is covered with sweat. Received praise and praise from the public. In this activity, a total of 30 flower shrubs, 4 spherical trees, 70 meters of hedges, 1,500 square meters of sanitation and other sanitation were cleaned, and 3 vehicles were cleared.

2. Key projects, orderly advancement

This year, the old town has a total of seven green spaces, including 1,200 square meters of Gulou Street. The 5,600 square meters of the South Zu Shi has completed the first phase of the greening project, and the second phase will increase the large trees, lighting facilities, leisure sitting stools, management rooms and so on. The construction of the Bazishan Park has been basically completed, and it will be open to visitors in May. The central gate green space is 6,100 square meters, which has also been opened. The green area of ​​the night market, the green land of Fujian Road, and the green area on the north side of the west side of Chahar Road are undergoing examination and approval procedures. Jiangdong New District completed 4,332 square meters of new green space and 204 large trees. The comprehensive rectification of Wulongtan Park is being carried out intensively. The old lock dragon bridge is demolished, the main body of the new lock dragon bridge is basically completed, the sewage interception project is progressing in an orderly manner, and the new scheme of Xi Damen is being refined. Vertical greening planted Yunnan Huangxin, climbing Tengwei, climbing the wall to measure 7210 strains. Roof greening plans to build 10,000 square meters this year, with emphasis on the surrounding of Gulou Square and TV Tower. The selection survey, program design and budget estimates have been completed.

Second, there are problems

1, the maintenance standards are not high, lack of highlights

Municipal and green maintenance is not refined enough, and the standard is not high enough; the green spots of the park are not prominent, and the phenomenon of green and green is more prominent. There is still a lack of more scientific and advanced management methods for the comprehensive management of municipal facilities, and the management level needs to be further improved.


More articles on the 2019 district construction work summary>>
Civil Affairs Bureau Office 2010 Summary Environmental Protection Bureau 2019 Work Summary County Product Quality Supervision and Inspection Institute 2019 Annual Work Summary Highway Toll Station 2019 Annual Work Summary Township Social Affairs Office 2019 Work Summary City Planning Administration 2019 Safety Production Work Summary Food Bureau 2019 Annual work summary Environmental Protection Bureau 2019 work summary [return to the administrative logistics work summary column list]

2. Insufficient facility supervision

Because the right to violate the regulations is not in our office, it has made it difficult to supervise our facilities. At the same time, due to the small number of personnel and lack of means of transportation, the scope of the facilities is large, the scope is wide, the battle line is long, the work efficiency is affected, and the illegal road occupation and private excavation of some road sections and parts are still partially existed. occur.

3. Service awareness needs to be strengthened

In the work, we should further strengthen the service awareness, change the work style, enthusiastically serve the people, serve the enterprise, and improve the standards and quality of service.

4, the cost gap is larger

Due to the high requirements for facility maintenance management, the daily maintenance management expenses are relatively large, and the maintenance management funds issued by the superiors are all allocated to the maintenance units, and the financial funds are limited to the heads for office expenses and employee benefits. The cost gap is large.

5, insufficient staff

There are 16 staff members in our company. Because of the need for three people to borrow for a long time in other jobs, we feel that it is difficult to work in the face of the heavy management tasks within the jurisdiction. There are often places where supervision is not in place. With the escalation of the city management work, it is forced to further improve the level of facility management in our district, and the lack of manpower makes us feel that management is difficult to carry out in depth.

Third, the next step of work

1. Strengthen the training of staff business knowledge

Intensify business training, organize employees to participate in business training according to the requirements of higher authorities, organize internal business knowledge exchanges from time to time, and continuously improve the professional quality of employees, so as to facilitate the maintenance management under the new situation.

2. Strengthen the process monitoring of maintenance management

Further strengthen the inspection work at the maintenance site and implement process monitoring. Check the maintenance plan reported by the maintenance company every month, check the implementation status of the maintenance work at the maintenance site, check the actual workload, maintenance quality, implementation of safety measures, etc., combined with the monthly assessment, and the problems found in the process monitoring are monthly. Key verification in the assessment.

3. Do a good job in implementing the quality management and safety work of all kinds of special projects.

Further explore the effective supervision methods of special projects, such as what to do in the preliminary preparation; how to track the quality during the construction process; how to manage the on-site civilized construction; how to organize the data and how to complete the progress of the project. Carefully organize and implement various special projects and new projects to ensure that each link meets quality requirements and safety regulations, and arrange special personnel to conduct on-site management and coordination, and urge construction companies to strictly follow relevant technical specifications and civilized construction requirements to ensure construction. successfully launch.

4. Increase the supervision of daily facilities

Increase the intensity of daily inspections and make the responsibility concrete and clear. In the work, the area, work content, coordination tasks, etc. are respectively responsible to the people, and at the same time, strictly enforce the responsibility system of who is responsible and who is responsible. Carry out in-depth and meticulous work to ensure the integrity of the facilities. Complete the processing of urban information management case on time and improve the settlement rate.


More articles on the 2019 district construction work summary>>
Civil Affairs Bureau Office 2010 Summary Environmental Protection Bureau 2019 Work Summary County Product Quality Supervision and Inspection Institute 2019 Annual Work Summary Highway Toll Station 2019 Annual Work Summary Township Social Affairs Office 2019 Work Summary City Planning Administration 2019 Safety Production Work Summary Food Bureau 2019 Annual work summary Environmental Protection Bureau 2019 work summary [return to the administrative logistics work summary column list]