The year-end summary of the 2019 work of the Land and Resources Bureau and the work ideas of 2019
In 2019, under the correct leadership of the flag committee, the flag government and the Municipal Bureau of Land and Resources, the xxxx Land Resources Bureau closely followed the central work of the flag committee and the flag government and the overall deployment of the Municipal Land and Resources Bureau, and earnestly performed the functions of the land and resources department. Responsibilities, highlighting key points, grasping key points, strengthening measures, and vigorously implementing them, all work have achieved good results.
I. Work completion in 2019
Focusing on the central work of the flag committee and the flag government and the overall development of the whole banner, actively integrate and fully perform the service work.
First, actively strive for and actively coordinate and do a good job in pre-examination and approval of key construction projects. Focusing on the "industrial strong flag" strategy of the flag committee and the flag government, we actively provide land acquisition services and land use security, intervene in advance, take the initiative to participate, and provide full service. We have successively participated in the CLP Wind Power Project, Chifeng Longyuan Wind Power Project, and Chifeng Xinsheng Wind Power Project. The project approval and tracking services were carried out for 14 construction projects including Qilu Lead-Zinc Plant, Shanchuan Lead-Zinc Plant, Kunchang Lead-Zinc Plant, Kunming Steel Shuangqiang Lead Smelter, Quanning Road Reconstruction, and 305 Line Reconstruction and Expansion. According to the law, x hectares of land supply ensured the smooth implementation of major industrial projects and key infrastructure projects.
The second is to do a good job of land acquisition and storage in Xicheng District according to the law, and provide land security for the construction of Xicheng District. Improve land acquisition procedures, standardize land acquisition behaviors, improve the transparency of land acquisition work, and cooperate closely with relevant units to publicize laws, regulations, and policies for land-expropriated farmers, and do patience and meticulous ideological work, and strive for their understanding and support for the construction of Xicheng District. Xicheng District's x-mu land acquisition mission was successfully completed.
The third is to effectively strengthen the management of resource assets and fully implement the system of bidding and auction for construction land. In the whole year, a total of four phases of construction land use were listed, and the state-owned land use rights were successfully transferred. The state-owned land area was transferred to x square meters, and the land transfer fee was obtained.
The fourth is to strengthen land price management and actively carry out urban benchmark land price renewal work. According to the relevant file requirements, the urban benchmark land price update work of 12 townships in the township of Sumu Town was completed, and the refinement standards were set for the land type, service life, regional location and floor area ratio of the benchmark land price.
Strengthen measures, pay close attention to implementation, and earnestly do a good job in farmland protection
Review and approve land for project approval according to law. Strictly in accordance with the overall land use planning, annual land use plan and national industrial policy, review and review the land use conditions and land use scale of the project, and perform the procedures for approval and approval of land use according to the procedures.
Seriously implement basic farmland protection measures. The basic level of farmland protection responsibility was signed at all levels, and the basic farmland protection work was included in the target management of relevant functional departments and grassroots land and resources offices, and strict assessment standards and assessment methods were formulated. Regular and irregular inspections of basic farmland protection shall be carried out, and units with problems shall be urged to implement rectification. The dynamic monitoring and management of basic farmland was strengthened, and the changes in basic farmland were grasped in time. Due to strict management and measures in place, the basic farmland protection rate has reached 100%.
Further improve the implementation, initiation and declaration of land consolidation projects. First, do a good job in the implementation management of two land consolidation projects in Erdenzi Village, Wudunghai Town, and Gaorihan Sumu Blackfish Bubbles. The total construction scale of these two projects is 1177.59 hectares with a total investment of 19.34 million yuan; It is necessary to do a good job in the construction preparation work of the Baiyintaohaisumuta land reclamation project approved by the project. The construction scale of the project is 1021.83 hectares, and the approved budget is 13.8 million yuan. The third is the completion of the bridgehead, the five points, and the Wudeng set. The on-site reconnaissance, planning, design and declaration of the three land consolidation projects of the sea, with a total construction scale of 2,240 hectares and a total budget of 36.7 million yuan.
Solidly carry out cadastral management work and vigorously consolidate the business foundation
First, establish and improve the land registration procedures, charging standards and other systems, and do a good job in initial land registration and land registration. In the whole year, 1,462 state-owned land use certificates were issued and approved, of which 388 were leased, 20 were transferred, 897 were transferred, and 157 were allocated. 455 collective land use certificates were issued, 15 other rights certificates were issued, 12 “five shortages” certificates were issued, and 123 pieces were issued for land use.
The second is to carry out the second land survey work in a solid manner. Leading organizations and working institutions have been set up, work plans have been formulated, operational teams have been clearly defined, and rural land use status surveys, rural land tenure change surveys, and urban cadastre surveys have been actively organized. At present, the field investigation work of 12 townships in the whole town of Sumu has been completed.
The third is to strengthen the archives of land registration materials and other cadastre results materials. A total of 865 new archives were collected throughout the year, and 783 volumes were missing. Seriously carry out public enquiry on land registration information, and accept more than 570 public enquiries by units and individuals throughout the year, and issue 186 pieces of certification materials.
Comprehensively strengthen mine management and promote steady development of resource development
The first is to strengthen the management of mining rights. In the whole year, a total of 46 mining rights applications were accepted, of which 17 were newly established, 22 were continued, 7 were changed, the price of mining rights was x000 yuan, the royalties of mining rights were x million yuan; 20 applications for exploration rights were accepted, of which one was newly established. , continued 10 pieces, changed 9 pieces.
The second is to comprehensively carry out the dynamic management of reserves. In accordance with the relevant archives requirements, the investigation of the current status of mineral resources utilization, the field verification of mining rights, and the verification and testing of mineral resources reserves were carried out.
The third is to seriously carry out the annual inspection of "two powers." The annual inspection of 105 mining enterprises and 109 exploration rights in the whole flag was carried out, and the annual inspection rate reached 100%. Combined with the annual inspection work, the resource compensation fee is 471,900 yuan.
The fourth is to strengthen the protection of geological heritage and the declaration of geological parks. The China University of Geosciences was hired to demonstrate the declaration of the autonomous region-level geological park on the Bronck geological heritage.
The fifth is to promote the integration of resources and the revision of mineral resources planning. Focus on the integration of the Wutonghua lead-zinc mining area. At present, the Department of Land and Resources has approved the scope of the integrated mining area. Focus on the revision of mineral resources planning, report to the flag government to solve the required funds, and have completed the field survey and geological data collection work, the preparation of texts and drawings is underway.
Do a good job in the prevention and control of geological disasters to ensure the safety of people's lives and property
First, the establishment of a three-level geological disaster liaison system for the flag, township and village, and improved the geological disaster group monitoring and prevention, monitoring and forecasting system.
The second is to formulate the Emergency Plan for Sudden Geological Disasters of Wengniute Banner, and establish and improve the emergency response mechanism for sudden geological disasters.
The third is to seriously carry out the investigation of hidden dangers of geological disasters. Under the leadership of the geological environment experts of the Inner Mongolia Geological Environment Monitoring Institute, we went deep into the 12 townships of Sumu Town and six state-owned farms to carry out geological disaster investigations. In the past two months, a total of 43 geological hazard points were identified, including 4 ground collapses, 16 collapses, and 23 earth and rock flows.
In 2019, under the correct leadership of the flag committee, the flag government and the Municipal Bureau of Land and Resources, the xxxx Land Resources Bureau closely followed the central work of the flag committee and the flag government and the overall deployment of the Municipal Land and Resources Bureau, and earnestly performed the functions of the land and resources department. Responsibilities, highlighting key points, grasping key points, strengthening measures, and vigorously implementing them, all work have achieved good results.
I. Work completion in 2019
Focusing on the central work of the flag committee and the flag government and the overall development of the whole banner, actively integrate and fully perform the service work.
First, actively strive for and actively coordinate and do a good job in pre-examination and approval of key construction projects. Focusing on the "industrial strong flag" strategy of the flag committee and the flag government, we actively provide land acquisition services and land use security, intervene in advance, take the initiative to participate, and provide full service. We have successively participated in the CLP Wind Power Project, Chifeng Longyuan Wind Power Project, and Chifeng Xinsheng Wind Power Project. The project approval and tracking services were carried out for 14 construction projects including Qilu Lead-Zinc Plant, Shanchuan Lead-Zinc Plant, Kunchang Lead-Zinc Plant, Kunming Steel Shuangqiang Lead Smelter, Quanning Road Reconstruction, and 305 Line Reconstruction and Expansion. According to the law, the land supply is x hectares, ensuring the production of the whole flag.
The smooth implementation of industry projects and key infrastructure projects.The second is to do a good job of land acquisition and storage in Xicheng District according to the law, and provide land security for the construction of Xicheng District. Improve land acquisition procedures, standardize land acquisition behaviors, improve the transparency of land acquisition work, and cooperate closely with relevant units to publicize laws, regulations, and policies for land-expropriated farmers, and do patience and meticulous ideological work, and strive for their understanding and support for the construction of Xicheng District. Xicheng District's x-mu land acquisition mission was successfully completed.
The third is to effectively strengthen the management of resource assets and fully implement the system of bidding and auction for construction land. In the whole year, a total of four phases of construction land use were listed, and the state-owned land use rights were successfully transferred. The state-owned land area was transferred to x square meters, and the land transfer fee was obtained.
The fourth is to strengthen land price management and actively carry out urban benchmark land price renewal work. According to the relevant file requirements, the urban benchmark land price update work of 12 townships in the township of Sumu Town was completed, and the refinement standards were set for the land type, service life, regional location and floor area ratio of the benchmark land price.
Strengthen measures, pay close attention to implementation, and earnestly do a good job in farmland protection
Review and approve land for project approval according to law. Strictly in accordance with the overall land use planning, annual land use plan and national industrial policy, review and review the land use conditions and land use scale of the project, and perform the procedures for approval and approval of land use according to the procedures.
Seriously implement basic farmland protection measures. The basic level of farmland protection responsibility was signed at all levels, and the basic farmland protection work was included in the target management of relevant functional departments and grassroots land and resources offices, and strict assessment standards and assessment methods were formulated. Regular and irregular inspections of basic farmland protection shall be carried out, and units with problems shall be urged to implement rectification. The dynamic monitoring and management of basic farmland was strengthened, and the changes in basic farmland were grasped in time. Due to strict management and measures in place, the basic farmland protection rate has reached 100%.
Further improve the implementation, initiation and declaration of land consolidation projects. First, do a good job in the implementation management of two land consolidation projects in Erdenzi Village, Wudunghai Town, and Gaorihan Sumu Blackfish Bubbles. The total construction scale of these two projects is 1177.59 hectares with a total investment of 19.34 million yuan; It is necessary to do a good job in the construction preparation work of the Baiyintaohaisumuta land reclamation project approved by the project. The construction scale of the project is 1021.83 hectares, and the approved budget is 13.8 million yuan. The third is the completion of the bridgehead, the five points, and the Wudeng set. The on-site reconnaissance, planning, design and declaration of the three land consolidation projects of the sea, with a total construction scale of 2,240 hectares and a total budget of 36.7 million yuan.
Solidly carry out cadastral management work and vigorously consolidate the business foundation
First, establish and improve the land registration procedures, charging standards and other systems, and do a good job in initial land registration and land registration. In the whole year, 1,462 state-owned land use certificates were issued and approved, of which 388 were leased, 20 were transferred, 897 were transferred, and 157 were allocated. 455 collective land use certificates were issued, 15 other rights certificates were issued, 12 “five shortages” certificates were issued, and 123 pieces were issued for land use.
The second is to carry out the second land survey work in a solid manner. Leading organizations and working institutions have been set up, work plans have been formulated, operational teams have been clearly defined, and rural land use status surveys, rural land tenure change surveys, and urban cadastre surveys have been actively organized. At present, the field investigation work of 12 townships in the whole town of Sumu has been completed.
The third is to strengthen the archives of land registration materials and other cadastre results materials. A total of 865 new archives were collected throughout the year, and 783 volumes were missing. Seriously carry out public enquiry on land registration information, and accept more than 570 public enquiries by units and individuals throughout the year, and issue 186 pieces of certification materials.
Comprehensively strengthen mine management and promote steady development of resource development
The first is to strengthen the management of mining rights. In the whole year, a total of 46 mining rights applications were accepted, of which 17 were newly established, 22 were continued, 7 were changed, the price of mining rights was x000 yuan, the royalties of mining rights were x million yuan; 20 applications for exploration rights were accepted, of which one was newly established. , continued 10 pieces, changed 9 pieces.
The second is to comprehensively carry out the dynamic management of reserves. In accordance with the relevant archives requirements, the investigation of the current status of mineral resources utilization, the field verification of mining rights, and the verification and testing of mineral resources reserves were carried out.
The third is to seriously carry out the annual inspection of "two powers." The annual inspection of 105 mining enterprises and 109 exploration rights in the whole flag was carried out, and the annual inspection rate reached 100%. Combined with the annual inspection work, the resource compensation fee is 471,900 yuan.
The fourth is to strengthen the protection of geological heritage and the declaration of geological parks. The China University of Geosciences was hired to demonstrate the declaration of the autonomous region-level geological park on the Bronck geological heritage.
The fifth is to promote the integration of resources and the revision of mineral resources planning. Focus on the integration of the Wutonghua lead-zinc mining area. At present, the Department of Land and Resources has approved the scope of the integrated mining area. Focus on the revision of mineral resources planning, report to the flag government to solve the required funds, and have completed the field survey and geological data collection work, the preparation of texts and drawings is underway.
Do a good job in the prevention and control of geological disasters to ensure the safety of people's lives and property
First, the establishment of a three-level geological disaster liaison system for the flag, township and village, and improved the geological disaster group monitoring and prevention, monitoring and forecasting system.
The second is to formulate the Emergency Plan for Sudden Geological Disasters of Wengniute Banner, and establish and improve the emergency response mechanism for sudden geological disasters.
The third is to seriously carry out the investigation of hidden dangers of geological disasters. Under the leadership of the geological environment experts of the Inner Mongolia Geological Environment Monitoring Institute, we went deep into the 12 townships of Sumu Town and six state-owned farms to carry out geological disaster investigations. In the past two months, a total of 43 geological hazard points were identified, including 4 ground collapses, 16 collapses, and 23 earth and rock flows.
Strengthen administrative law enforcement, and further improve the order of land and resources management
Strengthen the publicity and education of the legal system of land and resources. With the aim of improving the awareness of the land resources of the broad masses of cadres and the awareness of the legal system of land and resources, we will earnestly carry out the publicity and education of the legal system of land and resources. First, in accordance with the requirements of the "five-five-year" law-enforcement work plan, earnestly grasp the law-enforcement education of system cadres and workers, further improve the legal knowledge of the broad masses of cadres and workers, enhance the concept of the legal system, and achieve knowledge, law-abiding, and strict law enforcement; The publicity and education activities of the land and resources legal knowledge of the two levels of cadres at the rural level, effectively enhance the initiative and enthusiasm of grassroots cadres and people for legally managing land, legally using land and consciously protecting land resources; the third is the opportunity of "World Earth Day" and "Land Day" We launched a wide-ranging publicity campaign on “Strengthening the Red Line of Cultivated Land, Saving Intensive Land Use, Building a New Mechanism for Safeguarding and Promoting Scientific Development”, distributing more than 10,000 promotional materials, hanging more than 500 promotional slogans, and accepting more than 380 consultations.
Strengthen the law enforcement supervision of land and resources. First, in accordance with the principle of “prevention of prevention, early detection, early suppression”, establish a long-term mechanism for law enforcement supervision, improve the joint case handling mechanism, innovate work measures, strengthen social supervision, and realize the transformation of law enforcement supervision from passive coping to active attack. From the post-crisis investigation to the pre-emergency prevention and transformation, from single operation to multi-sector joint operations; the second is to carry out various special clean-up operations, and strictly investigate various illegal land and mineral resources violations. In terms of land, the focus is on the follow-up treatment of the 100-day land law enforcement operation. 13 cases of land violations were investigated and dealt with in the whole year, and 5 cases were handed over to the courts. In terms of mineral resources, the “review” action was taken to rectify the mineral resources development order. Taking the opportunity to conduct a pull-net inspection of all mines and mines in the whole flag, and carried out a comprehensive clean-up of illegal and illegal activities such as unlicensed exploration and mining, super-layer cross-border mining, and destruction of wasteful resources. In the whole year, 5 cases of violations of mineral resources were investigated and investigated, including 1 undocumented exploration, 2 unlicensed mining, and 2 illegal transfers.
Attach great importance to the work of letters and visits, and timely and steadily handle and resolve the reports sent by the people.
problem. Since the beginning of the year, a total of 58 letters have been received from the people, and 274 batches of 486 people have been interviewed by the people. The rate of letters and visits is 100%. The Zongzong has been confessed, and the pieces have echoes, which played a positive role in maintaining social stability and promoting economic development.Promote "four constructions" and comprehensively enhance the image of the land and resources department
First, strengthen the building of party style and clean government. Seriously summed up the experience and lessons of the party's work style and clean government in the national land department. At the beginning of the year, the level of responsibility for building a clean and honest government was signed at all levels, and a system of punishing and preventing corruption with equal emphasis on education, system and supervision was constructed. Strengthen financial management and supervision, further improve the Wenzhouqi Land and Resources Bureau important matters review system, strengthen the collective decision-making mechanism, and strive to curb the occurrence of corruption from the source.
The second is to strengthen the construction of cadres. Through active activities to rectify the work and create the "people's satisfaction with the land resources unit team" activities, the ideological and political quality of the cadres and workers of the whole system has been greatly improved. Regularly organize cadres and workers to conduct business knowledge training, and organize business knowledge examinations, and the business quality of system-wide cadres and workers has been significantly improved. Established an implementation supervision mechanism for system implementation, major issues, and key tasks, and vigorously promoted the effective implementation of various systems and the completion of major tasks.
The third is to strengthen the construction of service windows. This year, the bureau has strengthened the construction of the administrative examination and approval service center window as the number one project. On the basis of simplifying the procedures, optimizing the work flow and standardizing the examination and approval authority, the Office further improved the window working mechanism and ensured the administrative examination service window. The specification runs in an orderly manner. This year, the bureau has determined the "two-concentration" and "four-open" window construction mode, that is, the administrative approval authority of the department is concentrated in one share room, and the stock room construction system is centralized in the administrative examination service center window; Basis, charging standards, consultation telephone, supervision and reporting on the online wall, clear the responsibility and responsibility of the review and approval of the responsible persons in each link, so that the pre-conditions are open at the time of acceptance, the information before the examination is open, the approval process is open, and the approval is approved. The results are public. In order to improve the efficiency of the work, the number of workers in the service window of the bureau increased from 3 to 6 people. At the same time, the hardware investment was increased, the computer was replaced by more than 80,000 yuan, and the special printer for issuing certificates was equipped. A field surveying vehicle.
The fourth is to strengthen the construction of grassroots land and resources. First, the work responsibilities, work systems, and work processes of the grassroots land and resources offices have been standardized and further clarified. The second is to formulate and issue the annual assessment rules of the grassroots country resources, and to refine the responsibilities of the grassland protection, cadastre and mining management, law enforcement supervision, etc., which have the content and standards. have goal.
Summarizing the work throughout the year, we mainly have the following experiences: First, the flag committee and the flag government attach great importance to the management of land and resources and the city bureau's strong support for our work, which provides a strong backing for us to carry out various tasks. The second is to properly handle the protection and protection, law enforcement and services, the relationship between the overall and the local, and create a good external environment for us to carry out the management of land and resources. Thirdly, through the activities of rectifying the work and creating the “people's satisfaction with the land resources unit team” activities, it has greatly enhanced the endogenous motivation for us to carry out the management of land resources.
While affirming the achievements and summing up the experience, we are also clearly aware that there are still some gaps and shortcomings in our work and the requirements of the flag committee, the flag government and the superior authorities. It is mainly reflected in the fact that violations of laws and regulations on land and resources still occur from time to time. The strength and means of investigating illegal land use and illegal exploitation of mineral resources must be further strengthened; the collection and management of mineral resources compensation fees is still extensive, and methods and procedures need to be further improved. The ideological style, work style and the new situation, new tasks and new requirements faced by the minority comrades at the grassroots level are still incompatible with each other. The overall quality of the team must be further improved; the management system of the grassroots land resources is Some problems in office conditions and office expenses have not been fundamentally resolved, and the construction of soft and hard bodies at the grassroots national level must be further strengthened. For these problems, the Office will try to solve them.
Second, the focus of work in 2019
In 2019, the bureau will focus on the following aspects:
First, follow-up work was carried out in a solid manner around the second land survey. Work together with the construction unit to complete the “second adjustment” work with quality and quantity. On the basis of comprehensively clarifying the type, quantity, distribution and ownership of land use, we will conscientiously do a good job in the revision and overall certification of land use planning.
The second is to vigorously promote land development and consolidation. Vigorously carry out investigations on land development and preparation of reserve resources, deepen the potential of land resources, carefully compile land development and planning and design, actively declare land development and consolidation projects at the national and autonomous regional level, and earnestly do a good job in the construction of land development and consolidation projects that have been approved for project approval. .
The third is to do a good job in urban land operations. Give full play to the functional role of the land and resources department in managing and managing land, actively carry out land acquisition and storage, and strive to promote the industrialization and urbanization of xxxx.
The fourth is to regulate the order of the land market. We will fully implement the industrial land auction, auction and transfer system, strictly implement the lowest price standard for industrial land transfer, and fully integrate industrial land allocation into the land tangible market. Strengthen the post-approval supervision, improve the efficiency of land use, and carry out inspections on the performance of land transfer contracts.
The fifth is strict mineral management. Focus on the intensive use of mineral resources, scientifically and rationally allocate resources, establish and improve the system of paid use of mineral resources, and improve the comprehensive development of resources. We will rectify and standardize the order of mineral resources development, do a good job of resource integration, and improve resource utilization efficiency. Focusing on expanding the source of resource compensation fees and fees, we will explore new ways to collect compensation fees according to the consumption of resources. Fully implement the mine ecological deposit system and establish and improve the responsibility mechanism for mine environmental management and restoration.
The sixth is to strengthen law enforcement inspections. In the aspect of law enforcement supervision, we will focus on dynamic inspections. Adhere to the principle of combining prevention, pre-existing prevention and post-investigation, further improve the comprehensive flagship land and resources law enforcement monitoring network, increase the intensity of land and mineral resources law enforcement inspections, highlight centralized inspections of key project areas and mining areas, and Take precautionary measures to effectively curb the occurrence of illegal and illegal land and resources.
Seven is to strengthen file management. With the goal of upgrading the file standards, we will strive to improve the level of file management. Do a good job in improving, sorting and archiving the results of cadastral surveys in a timely manner to maintain the current situation. Strengthen the collection, collation and archiving of mineral resources management to maintain continuity and integrity.
recommended article
- The industrial economic situation of our city this year and the expected next year
- Summary of the first half of the work of the Quality Management Association
- Summary of the work of the Industry and Commerce Bureau
- Summary of internal work in 2019
- Summary of the administrative work of the Enterprise Management Division
- Summary of publicity report work
- Summary of the ideological and political construction work of the leading group
- Summary of the work of administrative clerk in 2019
- Township People's Government Work Plan for 2019
- Summary of administrative work in 2019
- Administrative logistics year-end summary
- Hotel annual work summary
popular articles
- Logistics work summary essay
- Tao Xingzhi's famous sayings
- Deaf people jingle 2019
- Summary of logistics staff work
- Summary of the work of the Women's Commission in 2019 and work in 2019
- College entrance examination inspirational quotes
- English famous words
- Du Yuexi's famous sayings
- Injured sentence
- Qq space mood phrase
- Teacher's famous saying
- 2014 Kindergarten Logistics Summary
- 2014 is very touching words
- Thanks to the friend's words 2019
- General affairs logistics work summary
- Taizai’s famous sayings
- Summary of the personal year-end work of the Administration Department
- a good saying that loves labor
- Korean swear words
- Classical life motto
- Bing Xin’s famous words
- I want to say something to the teacher.
- Strong words
- The latest high school inspirational maxim
- Describe the fast time sentence 2019
- Summary of the year-end work of the Administration Department
- Summary of corporate administrative personal work in 2019
- Summary of the logistics work of the agency in 2019
- Summary of personal work in the administrative office
- Sad love sentence 2019