Secretarial knowledge > Conference speech

City Appearance "** Cup" Competition Assessment Standard



City Appearance "XX Cup" Competition Assessment Standard
1. Construction site management The construction of urban infrastructure must be set up with corresponding signs and traffic diversion measures. 2 points were found, and 1 site that did not meet the requirements was found to be deducted 1 point.
Responsible department: Municipal Construction Management Office Responsible Unit: All construction units
2, car capacity car all the running vehicles in the city, the car capacity is neat, the car body is not damaged, count 5 points, found a dirty car deduction of 0.5 points. .
Responsible department: Comprehensive department responsible unit: XX head office
3, municipal facilities for all types of municipal, transportation facilities, paint, repair, remediation, to meet the standard and cleanliness standards, counted 3 points, found that one place does not meet the standard, deducted 0.5 points.
Responsible department: XXX responsible unit: XXX
4. Bus 101 road: XX Road - → XX Road - → Huancheng North Road - → XX Road - → XX North Road - → XX Road)
For the city bus, taxi car appearance, car interior sanitation, 1 point, found a car tolerance or poor car hygiene, deducted 0.5 points.
Responsible department: Comprehensive department responsible unit: XXX company
5, urban entrances and exits open view, clean and tidy, green and tidy beautiful, coordinated buildings, no accumulation of garbage, street trees, street lights, billboards and environmental coordination, 4 points, 4 spot checks, poor environment, each deducted 1 point.
Responsible department: Comprehensive department responsible unit: XX
6, the entrance and exit facilities management equipment, the signs are obvious, the road is smooth, no littering, no road occupation, accounting for 4 points. Check 4 entrances and exits and find 1 problem, deduct 1 point.
Responsible department: XXX responsible unit: XXXX
7, urban lighting project
7-1 Lighting layout All kinds of lighting are rich and colorful, the color is well matched, the overall effect is good, 4 points, the effect is not good, appropriate deduction points.
Responsible department: Comprehensive department responsible unit: XXXXX
7-2 city street lamp loading rate meets the requirements, count 1 point, the lighting rate is over 98%, 1 point, the road surface is bright, 1 point.
Responsible department: XXXX department responsible unit: XXXXX
7-3 Lightbox Advertising
A outdoor advertising light box is neat and beautiful, the picture is clear, the content is healthy and civilized, counting 1 point. The public buildings along the main roads of B city, such as street buildings and large-scale commercial and entertainment facilities, are brightly lit, enriching the night view of the city, counting 2 points, and finding 1 defective, deducting 0.2 points.
Responsible department: Comprehensive department responsible unit: XXXX
8. Sewage treatment Large and medium-sized cities must construct sewage treatment projects. The completed projects should be in normal operation. Small cities should carry out preparatory work for the preliminary period of the project, counting 2 points, and failing to meet the requirements without scoring.
Responsible department: XXXX department responsible unit: sewage treatment plant
9. Construction of gas projects accelerates the construction of gas projects and increases the gasification rate. The gasification rate is over 85%, accounting for 1 point.
Responsible department: XXX responsible unit: XXX head office
10. Urban water supply has accelerated the construction of water supply projects, and the water supply penetration rate has increased significantly from the previous year, accounting for 2 points.
Responsible department: XXX responsible unit: XXX head office
11, comprehensive impression points
A opened the "69116" convenience service hotline, counting 5 points. Otherwise count 0 points.
B set up a hotline command center and set up a secondary network with 2 points, otherwise 0 points.
C has a dedicated office space and full-time staff, count 2 points, otherwise the main 0 points.
D Command Center's hardware facilities are perfect, the response is fast, and the field is fast, with 4 points, otherwise the appropriate deduction points.
E has perfect rules and regulations, and strictly abides by, counts 2 points, otherwise counts 0 points.

recommended article

popular articles