Contract processing and installation of newsstand contract
Contract number:
Enter into the contract:
Make a person:
Legal representative of the ordering party: Signatory:
Holder: The contact person: Contact number:
Ordering agency address: Fax phone:
Contractor:
Legal representative of the contractor: signatory:
Contractor's Business License: Production Newsletter License:
Contractor's organization address: Contact person: Contact number:
Bank Account Opening License: Bank: Account:
According to the "Contract Law of the People's Republic of China" and the relevant laws and regulations in China, according to the requirements of the provincial bureau, the two sides agreed that Party B shall undertake the processing and installation of Party A's newsstands. The contracting parties shall be based on the principle of equality, fairness and reciprocity. Enter into the following contract terms:
First target
Party B shall undertake the processing and installation contract for the newsstands required by Party A: _____ million.
Article 2 Number, specifications and prices for the production of newsstands
1,
2,
3,
Note: The entire contract processing contract is based on the unit price of each newsstand. The settlement price includes: labor, materials, packaging and transportation, installation fees, and other related taxes.
Article 3 Processing, fabrication and installation, requirements
1. The newsstand is stable and reliable after installation, and the space is fully utilized. The use area is not less than _____ square meters.
2, the use of materials: all external surfaces use more than _____mm thick stainless steel plate, the structure uses stainless steel column, stainless steel square steel skeleton, transparent part not less than _____%, use _____mm arc type hot bending plus strength plexiglass, top hard plastic The FRP stamper is formed at one time, and a newspaper newspaper rack is built in it. The attached files include: sliding windows, power wiring boards, electricity meters, blue sun panels, and a vent.
Article 4 Acceptance criteria and methods
1. After Party B prepares the finished product of the newsstand, the party will carry out the initial test and the first test will be qualified.
2. Party A's acceptance is based on the comparison of sample acceptance and finished product delivery acceptance, and random sampling can also be adopted.
Article 5 Delivery time and location and packaging and transportation requirements
1. Delivery time: Party B must guarantee all delivery before _____ year _____ month _____ day.
2. Place of delivery: Party B is responsible for sending to the designated installation location of Party A and completing the installation.
3. Packing and transportation: When delivering, Party B shall package the finished product and ensure that the letter box is not damaged during transportation. If there is damage or deformation, paint, etc., Party B shall be responsible for the warranty.
Article 6 Installation and acceptance of newsstands and after-sales service
1. Party B installs the produced newsstands;
2. The newsstands installed by Party B must be accepted by Party A. If there is any unqualified acceptance, Party B shall rectify within _____ days, and shall not rectify or rectify the unqualified Party A according to the value of the newsstand. Deducting _____% as a separate repair fee will not be returned to Party B;
3. Party B promises that the newsstand produced by Party A will be free of charge during the year due to quality problems. If it is more than _____ years or is damaged by Party A for repair, it is necessary to pay the cost;
4. Party B promises to maintain the life of the newsstand used by Party A.
Article 7 Settlement method, time limit and installation cost
1. Within 15 days after the contract signed by Party A and Party B takes effect, Party A shall pay 30% of the advance payment to the account designated by Party B.
2. Within 15 days after the delivery of Party B, Party A shall pay the Party B account an amount of 30% of the contract amount, and accumulate 60% of the contract amount.
3. Party B will complete the installation on time and within 15 days after the acceptance of Party A's acceptance, Party A will pay the 35% of the contract amount to the account designated by Party B, and accumulate 95% of the contract amount.
4. The remaining contract amount is 5% of the price, as the quality guarantee deposit reserved by Party B to Party A. After one year, there is no quality problem after Party A's normal use. Party A shall take the remaining quality deposit of Party B to Party B at one time.
Article 8 Party A's liability for breach of contract
1. Party A shall, at the time of Party B's production of the newsstand, arbitrarily change the quantity or refuse to accept the goods, and Party A shall pay the penalty amount of the contract amount of Party B _____ ;;
2. Party A fails to pay the payment to Party B according to the time limit stipulated in the contract. For each day overdue, in addition to the payment, Party B shall pay Party B a penalty of _____ 。.
Article 9 Party B's liability for breach of contract
1. Party B fails to comply with the quality requirements of Party A, conceals the defects of raw materials, uses raw materials that do not comply with the contract, cuts the materials, shoddy, shoddy, etc. Party A shall, in addition to the quality of the price, Party A shall pay the contractual payment of Party B. Deducting _____ ‰ liquidated damages;
2. Party B shall not subcontract or subcontract in any way. If subcontracting or subcontracting is found, Party A has the right to terminate the contract, and the economic losses caused by Party B shall be borne by Party B;
3. Party B fails to deliver the newsstand at the time required by the contract. For each day after the expiration of the contract, Party A shall deduct the _____ 违 liquidated damages from the payment of the contractual payment of Party B.
Article 10 Dispute Resolution
The parties choose the _____ method from the following two ways as the solution to the dispute in this contract.
1. The dispute arising from the performance of this contract shall be settled by the parties through negotiation. If the negotiation fails, it shall be submitted to the Arbitration Commission for arbitration;
2. The dispute arising from the performance of this contract shall be settled by the parties through negotiation. If the negotiation fails, the case shall be brought before the people's court.
Article 11 Supplementary Provisions
1. This contract is in quadruplicate. Each of Party A and Party B shall hold two copies, effective from the date of signature and seal by both parties. During the performance of the contract, neither Party A nor Party B shall change or cancel the contract at will.
2. In the process of contract execution, both Party A and Party B shall be subject to the written notice of the change in the number of specific newsstands, and the verbal notice shall be invalid. The changes in the specifications of the newsstand shall be subject to the mutual agreement, and the supplementary clause shall prevail. This contract is equally valid.
person A person B:
Signatory: Signatory:
Signing place: signing date: year, month and day
recommended article
- Parking contract
- House demolition entrustment contract
- Contract
- Lighter processing installation contract
- Maintenance contract
- Jingmen City residential decoration and construction project construction contract
- International tanker charter contract
- LOGO Design Registration Agreement
- Car maintenance contract
- Computer maintenance agreement
- Mud painting contract
- Contract (including transportation)
popular articles
- Repair repair contract
- The latest topic of chatting with girls
- Missing childhood sentences
- Boasting words 2019
- English inspirational maxim
- Say goodbye
- Contract
- a good sentence for the motherland
- Blessing Dad’s words
- Pump repair contract
- a famous saying that overcomes setbacks
- Sample of the processing agreement (light industry)
- 2014 encourages the words of a lost person
- Construction and installation engineering construction contract
- Print production contract
- Decoration contract demonstration text
- Sad sentence
- Funny quotes
- Dedicated good words
- Commissioned production contract model
- Save your boyfriend's words
- Philosophical words 2019
- Trusted quotes
- Putin's famous sayings
- Common English sentences
- MacArthur's famous sayings
- Processing contract model
- Lincoln's famous sayings
- Mandela’s famous words
- About building a ship contract