Car maintenance contract
GF-92-0304
Repairee ___ Signing place _____________
First, the vehicle model:
┌────┬─────┬─────┬───────┬─┬──┬────┐
│车种 │ │牌照号│ │发│Model│ │
├────┼─────┼─────┼───────┤┤├┼┼────┤
│Car Type │ │Bottom Number │ │ Machine │ No. │ │
└────┴─────┴─────┴───────┴─┴──┴────┘
Second, the vehicle handover period:
┌────────────────┬──────────────────┐
│ Send repair │ Pick up │
├──┬───┬───┬────┼─────┬────┬──┬────┤
│ Date│ │ 方││ │ Date │ │ Way │ │
├──┼───┴───┴────┼─────┼────┴──┴────┤
│Location│ │Location │ │
└──┴────────────┴─────┴────────────┘
Third, maintenance categories and projects:
┌──────────────────────────────────┐
│ │
│ │
│ │
└──────────────────────────────────┘
Estimated total repair amount _____
Fourth, the material supply method:
V. Quality assurance period:
The repair vehicle shall be responsible for the maintenance quality problem within ___ days or within ___km from the date of delivery.
Sixth, acceptance criteria and methods _________________
7. Settlement method and term:
Cash _____ Transfer _____ Bank Transfer _____ Term ____
8. Liability for breach of contract and amount ________________
9. If a guarantee is required, a separate contract guarantee is attached as a copy of this contract.
X. Ways to resolve contract disputes: economic contract arbitration ___ court lawsuit ___
XI. Other terms agreed by the parties ______________
┌────────────────┬─────────────────┐
│Renovation unit name │Repair unit name │
│Unit Address: │Unit Address: │
│ Legal representative: │ Legal representative: │
│Representative │Representative │
│Phone Electric Hang │Phone hang │
│ Account Bank Account No. │ Account Bank Account │
│Postal code │Postal code │
│ │ │
└────────────────┴─────────────────┘
Description:
1. The scope of the written contract signed by the contractor and the repairee: the overhaul of the automobile, the major assembly overhaul, the secondary maintenance and the maintenance fee of more than one thousand yuan.
2. This contract is officially in duplicate, and is signed and approved by the contractor.
3. This contract maintenance fee is the estimated cost. At the time of settlement, the maintenance time and bill of materials shall be settled according to the actual amount incurred.
4. In the course of repair, the repairer shall notify the repairing party in writing when other faults need to be added to the maintenance project and extend the repair period. The repairer must give a written reply within ___ days after receiving the notice. Otherwise it is considered consent.
5. When the contractor and the repairee sign this contract, they shall be based on the provisions of the “Regulations on the Implementation of the Automobile Maintenance Contract”.
Note: This contract is in one copy. Each of the contractor and the repairee is responsible for each of the maintenance departments.
Producer
Repairee ___ Signing place _____________
First, the vehicle model:
┌────┬─────┬─────┬───────┬─┬──┬────┐
│车种 │ │牌照号│ │发│Model│ │
├────┼─────┼─────┼───────┤┤├┼┼────┤
│Car Type │ │Bottom Number │ │ Machine │ No. │ │
└────┴─────┴─────┴───────┴─┴──┴────┘
Second, the vehicle handover period:
┌────────────────┬──────────────────┐
│ Send repair │ Pick up │
├──┬───┬───┬────┼─────┬────┬──┬────┤
│ Date│ │ 方││ │ Date │ │ Way │ │
├──┼───┴───┴────┼─────┼────┴──┴────┤
│Location│ │Location │ │
└──┴────────────┴─────┴────────────┘
Third, maintenance categories and projects:
┌──────────────────────────────────┐
│ │
│ │
│ │
└──────────────────────────────────┘
Estimated total repair amount _____
Fourth, the material supply method:
V. Quality assurance period:
The repair vehicle shall be responsible for the maintenance quality problem within ___ days or within ___km from the date of delivery.
Sixth, acceptance criteria and methods _________________
7. Settlement method and term:
Cash _____ Transfer _____ Bank Transfer _____ Term ____
8. Liability for breach of contract and amount ________________
9. If a guarantee is required, a separate contract guarantee is attached as a copy of this contract.
X. Ways to resolve contract disputes: economic contract arbitration ___ court lawsuit ___
XI. Other terms agreed by the parties ______________
┌────────────────┬─────────────────┐
│Renovation unit name │Repair unit name │
│Unit Address: │Unit Address: │
│ Legal representative: │ Legal representative: │
│Representative │Representative │
│Phone Electric Hang │Phone hang │
│ Account Bank Account No. │ Account Bank Account │
│Postal code │Postal code │
│ │ │
└────────────────┴─────────────────┘
Description:
1. The scope of the written contract signed by the contractor and the repairee: the overhaul of the automobile, the major assembly overhaul, the secondary maintenance and the maintenance fee of more than one thousand yuan.
2. This contract is officially in duplicate, and is signed and approved by the contractor.
3. This contract maintenance fee is the estimated cost. At the time of settlement, the maintenance time and bill of materials shall be settled according to the actual amount incurred.
4. In the course of repair, the repairer shall notify the repairing party in writing when other faults need to be added to the maintenance project and extend the repair period. The repairer must give a written reply within ___ days after receiving the notice. Otherwise it is considered consent.
5. When the contractor and the repairee sign this contract, they shall be based on the provisions of the “Regulations on the Implementation of the Automobile Maintenance Contract”.
Note: This contract is in one copy. Each of the contractor and the repairee is responsible for each of the maintenance departments.
Producer
recommended article
- Maintenance contract
- Parking contract
- Car maintenance contract
- Lighter processing installation contract
- LOGO Design Registration Agreement
- Jingmen City residential decoration and construction project construction contract
- Contract
- Computer maintenance agreement
- International tanker charter contract
- Mud painting contract
- House demolition entrustment contract
- Contract (including transportation)
popular articles
- Sad sentence
- a famous saying that overcomes setbacks
- a good sentence for the motherland
- Blessing Dad’s words
- Construction and installation engineering construction contract
- Mandela’s famous words
- MacArthur's famous sayings
- Common English sentences
- Processing contract model
- Putin's famous sayings
- Decoration contract demonstration text
- Funny quotes
- Missing childhood sentences
- Lincoln's famous sayings
- Repair repair contract
- Contract
- Print production contract
- Trusted quotes
- Boasting words 2019
- Dedicated good words
- Sample of the processing agreement (light industry)
- Pump repair contract
- 2014 encourages the words of a lost person
- Say goodbye
- Commissioned production contract model
- Save your boyfriend's words
- The latest topic of chatting with girls
- About building a ship contract
- Philosophical words 2019
- English inspirational maxim