Fan Wen Daquan > Contract Model > Contract Model

Heald frame contract model


Client: _____ Textile Equipment Factory

Contractor: _____ Electroplating Factory

1. Processed items, product names, specifications ____ quantity ____ price, delivery date:

┌──┬──────┬───┬────┬────┬────┬─────┐

│Project│Product Name, Regulation│Unit│ Quantity│ Unit Price│ Total Price│ Delivery Date│

│ │格│ │ │ │×├──┬──┤

│ │ │ │ │ │ │ 季季│二季│

│ │ │ │ │ │ │ │ degree │ degree │

├──┼──────┼───┼────┼────┼────┼──┼──┤

│ galvanized │ comprehensive frame 1600mm to │ only │100,000 │ 0.15 │15,000 │ 50,000 │ 50,000

│ │上│ │ │ │ │ │ │ │

├──┼──────┼───┼────┼────┼────┼──┼──┤

│Quenching │ Full │ │ │100 million │ 0.11 │110000 │500,000 │500,000 │

├──┼──────┼───┼────┼────┼────┼──┼──┤

│ │ │ │ │ │ │ │ │ │

├──┼──────┴───┴────┴────┴────┴──┴──┤

│Total │ 拾贰万千千元│

└──┴───────────────────────────────┘

2. Quality standard: Party B shall process according to the technical requirements and quality standards specified by Party A's drawings. The processing parts provided by Party A during the processing and transportation process are allowed to damage ___, but the damaged parts must be returned to Party A.

3. Raw material supply: The zinc block for processing is supplied by Party A.

4. Delivery method: Party B is responsible for the round-trip transportation, and the freight is borne by Party B.

5. Quality acceptance method: After completion of processing, Party A shall accept the quality according to the quality standard.

6. Settlement method: through bank collection.

7. Liability for breach of contract: Party A entrusts Party B to process galvanizing, quenching, etc. Party B shall complete the work according to the specified date; Party B shall bear Party A's economic losses within the time limit, and shall pay a fine of ___ per day for the total value of processed products. Party A fails to deliver Party B's processed goods according to the specified time and quantity, thus causing Party B's loss of work stoppage and compensation shall be based on actual losses.

Party A: ______ Textile Equipment Factory Party B: ____ Electroplating Factory

Legal representative: Legal representative:

Address: _______ Address: _______

Bank account number: ______ Bank account number: _____

____year month day

recommended article

popular articles