Part 1: Internship report essay

From x-x to x-x, during this period, our civil engineering major went to three large construction sites in Hefei. Although our professional courses have not been opened before, we also let us each through this internship. The civil servants have benefited a lot, let us have a preliminary sense of the building, and lay a solid foundation for us to open professional courses and learn professional knowledge in the future. I am very grateful to the school for giving us this internship opportunity, so that we have the opportunity to go to the construction site to watch the internship, let us witness the construction workers how to construct the building. Each of us is very happy to have such an opportunity to learn a lot of books and not learn.

Three days to the internship on the construction site, the school used the school bus to pick up and drop off. When we arrived at the site of the construction site, I saw the students wearing safety helmets on the head; at the same time, the living area of ​​the construction site and the door of the construction area also read: Those who do not wear helmets are not allowed to enter the construction site; of course, the slogan on the protection net outside the main body of the building also reads: safety responsibility, which is more important than Taishan; thus the first problem to be noted in construction is safety. In the past, many production injuries and fatal accidents were caused by the failure of production companies to pay attention to the safety of migrant workers. These accidents have caused great damage to workers and enterprises. At the same time, in order to ensure the smooth construction and construction safety, the construction site is to use brick walls. All the vehicles and internal personnel who are in the construction can only enter and exit. We must also negotiate with the construction party in advance to negotiate with them.

When we entered the construction area, we saw the structural body of the building at a glance. At that time, the main body of the structure gave me the feeling that it was not as good as the building. This may be because it is different from the building I have seen that has been built and put into use. There is a large space in front of the main body. This site is used for stacking building materials. It can be seen that the stacked building materials are mainly steel bars, and there are no building materials such as cement, sand and stone. This is because the finished concrete has been used now. Come to pour the structure. This will ensure the quality of the concrete, reduce construction waste and reduce production costs. In the steel bar stacking area, we can see that the different types of steel bars are open, and also indicate the type of steel bars and the arrival time in front of them.

On the construction site, I saw the building materials I have never seen before. The name is not clear, it is called pressurized coagulation air mass. At present, few construction companies in Hefei use this material, compared with those traditional red bricks. This material has many characteristics that red bricks do not have: it has the function of sound insulation. With so many advantages, the price is certainly much higher than the price of those red bricks. Although this material occupies a large volume, it is very light. A person with great strength can lift it up with one hand.

During the three-day internship, each of us learned a lot of knowledge. The following are the lessons I learned through the three-day internship: the base plate and the foundation beam reinforcement; the wall reinforcement; the construction column Bundling of steel bars; beam reinforcement; banding of band hoops.

1. Foundation floor and foundation beam reinforcement:

1. Press the rebar position line to pop the bottom layer of the bottom plate. According to the force of the bottom plate, it is determined in which direction the steel bars of the lower layer are below the steel bar. Under normal circumstances, the short-term reinforcing bars are first laid, and then the long-term reinforcing bars are laid.

2. Place the mortar cushion for the concrete protection layer of the bottom plate. The thickness of the cushion is equal to the thickness of the protective layer. The distance can be reduced by about 1m, and even the mortar block can be replaced by iron.

3. If the base plate has a foundation beam, it can be bundled and formed, then installed in place, or tied in place according to the beam position line.

4. If the bottom plate steel bar has a lashing joint, the lap length and the lap joint position of the steel bar shall conform to the requirements of the construction specification, and the steel wire for the steel lap joint shall be fastened at the center and at both ends. If welded joints are used, the joint position shall also comply with the construction specifications in addition to the specimens to be taken in accordance with the welding regulations.

5. According to the good wall and column position line, the wall and column into the foundation of the ribs are firmly tied, the depth of the insertion should meet the design requirements, the length of the shovel should not be too long, and the upper end should take measures to ensure the vertical ribs Not skewed, dumped, or displaced.

2. Wall lashing:

1. Eject the wall and door and window hole position line on the floor concrete, and correct the pre-embedded ribs again. If there is displacement, handle it carefully according to the negotiation regulations. The wall formwork should adopt the “jumping mode” to facilitate the construction of steel bars.

2. First tie 2 to 4 vertical ribs, and draw the cross-bar markings, then tie the two transverse ribs at the lower part and the chest, and draw the vertical ribs. In general, the transverse ribs are outside, and the vertical ribs are in the inside, so the horizontal ribs are tied first and then the horizontal ribs are tied. The spacing and position of the horizontal and vertical ribs should meet the design requirements.

3. All steel crossings should be tied point by point, and the length and position of the laps should meet the requirements of the design drawings and construction specifications.

4. To ensure the correct position of the door and window opening, mark the elevation line on the vertical rib of the hole. The door and window openings shall be tied to the beam reinforcement according to the design requirements, and the length of the anchor into the wall shall meet the design requirements.

5. The seismic structural reinforcement and anchorage length of each connection point shall be tied according to the design requirements. For example, the longitudinal stress-bearing steel bar of the first-level column extends into the depth of the basement wall; the anchorage length of the end of the wall and the junction of the inner and outer walls is stressed, and attention should be paid when tying.

6. Cooperate with other types of work to install pre-embedded pipe fittings, reserved openings, etc., the location and elevation should meet the design requirements.

From June 3rd to June 5th, during this period, our civil engineering major went to three large construction sites in Hefei. Although our professional courses have not been opened before, we also let us each through this internship. The civil servants have benefited a lot, let us have a preliminary sense of the building, and lay a solid foundation for us to open professional courses and learn professional knowledge in the future. I am very grateful to the school for giving us this internship opportunity, so that we have the opportunity to go to the construction site to watch the internship, let us witness the construction workers how to construct the building. Each of us is very happy to have such an opportunity to learn a lot of books and not learn.

Three days to the internship on the construction site, the school used the school bus to pick up and drop off. When we arrived at the site of the construction site, I saw the students wearing safety helmets on the head; at the same time, the living area of ​​the construction site and the door of the construction area also read: Those who do not wear helmets are not allowed to enter the construction site; of course, the slogan on the protection net outside the main body of the building also reads: safety responsibility, which is more important than Taishan; thus the first problem to be noted in construction is safety. In the past, many production injuries and fatal accidents were caused by the failure of production companies to pay attention to the safety of migrant workers. These accidents have caused great damage to workers and enterprises. At the same time, in order to ensure the smooth construction and construction safety, the construction site is to use brick walls. All the vehicles and internal personnel who are in the construction can only enter and exit. We must also negotiate with the construction party in advance to negotiate with them.

When we entered the construction area, we saw the structural body of the building at a glance. At that time, the main body of the structure gave me the feeling that it was not as good as the building. This may be because it is different from the building I have seen that has been built and put into use. There is a large space in front of the main body. This site is used for stacking building materials. It can be seen that the stacked building materials are mainly steel bars, and there are no building materials such as cement, sand and stone. This is because the finished concrete has been used now. Come to pour the structure. This will ensure the quality of the concrete, reduce construction waste and reduce production costs. In the steel bar stacking area, we can see that the different types of steel bars are open, and also indicate the type of steel bars and the arrival time in front of them.

On the construction site, I saw the building materials I have never seen before. The name is not clear, it is called pressurized coagulation air mass. At present, few construction companies in Hefei use this material, compared with those traditional red bricks. This material has many characteristics that red bricks do not have: it has the function of sound insulation. With so many advantages, the price is certainly much higher than the price of those red bricks. Although this material occupies a large volume, it is very light. A person with great strength can lift it up with one hand.

Part 2: Internship report essay

As the first reception department of the hotel, the front desk is the first department to influence and serve the guests. The efficiency of a hotel and the creation of profits basically start here. I hope that the internship report of this university student hotel can be used as a reference model.

Foshan Electronic Hotel, as the first hotel to be established as a reform and opening-up, has advanced equipment and accommodation conditions at that time. As an important commercial and industrial city in China, Foshan has enough business guests. From the statistics of electronic hotels, 80% of the guests are representatives of enterprises or business groups in Foshan, and a large part of them are long-term selected electronic hotels. As a hotel, we have a long-term cooperation agreement with the hotel. The accommodation of these business guests has become an important profit point for business hotels such as electronic hotels.

The front desk work is mainly divided into reception and room sales, check-in, check-out and fee settlement, guest Q&A and service request processing, telephone transfer, taxi call service and airline ticket booking service. In addition, the front desk serves as the department directly contacted by the guests, so many of the guests' requests are not directly presented to the floor attendant, but the department they are the first to contact - the front desk, so the front desk also serves as the coordination center of the entire hotel. One point, especially in the electronic hotel.

The front desk of the electronic hotel is divided into three classes: morning shift, middle shift and overnight class, which are rotated and are closed every week. In addition to the overnight class, there are three people in the morning and middle classes. One of them is a full-time cashier, and the other two distribute the remaining work according to the actual workload. Such an arrangement is relatively lenient, and it can be allocated as one person for cash collection in the case of heavy workload, one person to register for sales, and the other for other services and contact work. Moreover, it can also alleviate the pressure of the cash register, so that the cash register can be clear-cut and not wrong. The most important thing is that this kind of work can quickly let new people gain experience. When the workload is small, they will be guided by the classmates. When the workload is large, they can absorb more experience and grow rapidly.

Since this kind of basic is not in the state of fine management, the responsibility of the individual is very unclear. The unclear responsibility directly leads to the unclear power. When there is a problem, it will naturally push each other. This problem cannot be solved through education and training. . Pushing each other is inherently human nature.

Therefore, it is necessary to solve such problems. One person, one position, such management methods have been applied in many world-renowned hotels for many years, and have been passed to China for some time. From the experience of various places, this can effectively improve the efficiency of reception and other work at the front desk, and can give the guests a neat and orderly feeling. According to the relevant content of consumer psychology, we know that an orderly environment will give people a sense of quality improvement, and they will have a sense of superiority, which will naturally deepen their affection for business units. At this time, with the quality of room service, the hotel is The status in the eyes of the guests will increase rapidly.

In addition, the electronic hotel has already had a suitable room display and processing system, but it has not been well applied.

For this problem, I made a simple analysis.

The main approach has the following two points.

1. Re-plan the process from check-out to ok room, try to absorb the actual experience of the room and front desk staff, and make the most efficient operation process and division of responsibility.

2, from check-out to the room attendant to do the house, after the room foreman ward rounds to determine whether you can set up an ok room, this operation is to avoid the above situation.

In addition, since the front desk staff has been using the pen and paper records for room management for a long time, strengthening the use of computers may require more training and regulations. This conversion can be a bit more difficult. However, I believe that as long as the management is willing to do so, employees can improve their work efficiency, and naturally they will receive good results.

problem:

After the check-out in the room, the general room attendant needs 20-30 minutes to make the house. This speed is random, and the time required for the house is different.

However, due to the current operation process: the guest check-out - room check wine - room state ok room - ready for new guests.

In many cases, the choice of guests is concentrated, mainly because the choice of guests has convergence, so the occupancy rate and new customer update rate of some rooms are very high, this phenomenon is caused by guest habits, house prices, seasons. A lot of conditions are decided together.

In our current operation process, the room attendant is not allowed to set aside time to do the house. It is often said that the room is opened when the room is not finished, and then the room attendant often complains. This situation is not conducive to the improvement of room service quality.

Therefore, I propose that the existing electronic room display monitoring system must be used effectively and effectively.

Part 3: Internship Report Fan Wen 1. Internship Overview:

In October 20xx, our civil engineering major conducted engineering geology internship. Engineering geology internship is a very important practical part of the whole engineering geology teaching, which enables students to learn in the field of geological phenomena based on the study of curriculum theory knowledge. On-the-spot investigation and on-the-spot practice, gain perceptual knowledge and consolidate and deepen the curriculum theory, combine theory with practice, and lay a certain foundation for the application of relevant geological data in the design and construction after graduation.

2 Internship purpose

Understand the basic address concepts, understand the basics, and learn the basic skills. Through a brief field address internship, consolidate the content of the "Engineering Geology" that has been studied, and deepen the understanding of the relevant content of the course; in addition, through the internship to cultivate the love of nature, cultivate the sentiment, and improve the interest in the science of address: at the same time fully realize The importance of geological practice to geological science. At the same time, cultivate students' hard work, hard work, discipline, solidarity and other good qualities and enhance the collective concept, master the field operation skills and the ability to write internship reports, sum up the connection between the internship and our major.

3 Internship content:

Changle Crater

The Changle crater, 18 million years ago, is the Cenozoic Tertiary basalt crater. The crater is conical, the stone is reddish-brown, and the momentum is extremely spectacular. Tens of thousands of hexagonal stone columns, from the bottom of the mountain to the top of the mountain, are inserted into the sky.

This crater is a basalt plug filled in a volcanic cylinder. After more than 2 million years of long-term weathering and erosion, it is stripped out of the ground. The columnar joints of the rock bolt develop and radiate, converge upward and spread downward, visually recording the volcano at that time. The natural landscape of the eruption shows the magic of nature. According to the research of the Institute of Geology of the Chinese Academy of Sciences, the crater is the volcanic crater of the Tertiary basalt, dating back more than 18 million years. Its discovery has a great reference value for geophysical and seismic science research. One-color red-brown prismatic stone, pointing to the sky, all the excavated people show obvious eruption texture, which indicates that it is caused by volcanic eruption. Dozens of mountain huts within nearly 100 square kilometers constitute a magnificent ancient volcano. group.

Shandong Shanwang National Geological Park

Shandong Shanwang National Geological Park is located about 22 kilometers east of Linyi County, Shandong Province, with an area of ​​about 13 square kilometers. The internship-related Daquan Geological Park is located in the Linyi sag in the Luzhong uplift area. The park consists of two sub-small basins, namely the Jiejiahe Basin and the Baojiahe Basin. The periphery is composed of low hills composed of basalt. The terrain is undulating. For seasonal rivers. The Geopark features the world-famous Sanwang ancient fossils and volcanic landscapes that reflect its formation.

The park is rich in various geological relics. The first is the 18th century Mesozoic sedimentary rock formation in the Middle Miocene. The sedimentary thickness is about 25 meters. It has a standard layer profile and has become an international Miocene organism. An important basis for building a hierarchy. Because the layer is as thin as paper, it is slightly weathered, that is, the layers are lifted up, just like a book page, which is likened to the "Wan Juan Book" by the ancients. A large number of fossils of paleontology are contained in it. In particular, the location of the layered section of the Shanwang Formation is composed of the early Niushan Formation basalt, the Tertiary Miocene lacustrine sedimentary rocks, the Quaternary loess and the late volcanic rock immersion. Second, various volcanic geological phenomena such as ancient volcanic cones and lava flow characteristics formed by volcanism during the Cenozoic period, such as Huangshan, Lushan, Momashan and Lingshan, are typical ancient craters, so they are also studying the Cenozoic volcanic rocks. The ideal place. In particular, the rubbing Mashan basalt columnar joints, the diameter is nearly 80cm, the scale is grand, and the momentum is spectacular. On the west side of the Lushan Mountain, the volcanic action formed a high platform, which formed a natural landscape after long-term weathering and erosion. People called it "stone building".

recommended article

popular articles