Summary of the work of the Construction Bureau in 2019 and the working ideas of 2019
In the past year, under the correct leadership of the county party committee and the county government, under the careful guidance of the competent departments of higher authorities, the Construction Bureau actively coordinated relevant departments to push forward the urban and rural construction undertakings, and carefully planned around the key tasks of the XX year determined at the beginning of the year. Seriously organize and implement, continuously improve work style, strive to improve service quality, give full play to and mobilize the functions of various functional departments, and successfully complete street expansion, roadway hardening, greening, lighting, underground drainage, water supply pipelines, heating facilities renovation Infrastructure construction projects such as upgrading, riverside park westward expansion, and Xishan water source exploration, shantytown renovation, and mud house renovation have also made great progress. The annual work situation is reported as follows:
I. Main work completion urban infrastructure construction
1. “Three Supply and Two Treatments”: The feasibility study report, special plan, environmental assessment and preliminary design have been completed, and land approval is being processed, and construction is being prepared.
2. Expansion of Jiangpan Park: Complete 15,000 square meters of the first phase of the Riverside Park West Expansion Project. The main projects include squares, porches, flower stands, sketches, street lamps, garden lights, nursing homes, public toilets, flower beds, marble floors, etc. It has been basically completed, and some squares have been paved for XX years. This year, the investment was about 4 million yuan.
3. Water supply: In order to let the people of Xunke County eat the qualified water and completely solve the problem of water pollution, it is planned to build the Xishan water source in the upper reaches of the city. The site selection and exploration, the use of 4 eyes and 9 eyes have been completed. Well work and other work, the feasibility study report can be completed in the near future. The design of water supply capacity, the recent 14,000 tons / day, the long-term 22,000 tons / day, the planned investment of 34 million yuan, is expected to be completed and put into use at the end of XX.
Pipe network reconstruction project: Renovation of 5.2 km of 5 sections of street and community pipe network, and maintenance of more than 20 pipe networks, greatly reducing the phenomenon of running and dripping.
4. Comprehensive market: Complete the relocation of the morning market and Hong Kong street market, move to the new integrated market, solve the traffic congestion on Tongjiang Street and the fire hazard in Hong Kong Street.
5. Drainage: A total of 4915 meters of new main drainage lines will be laid throughout the year, 550.5 meters of rainwater pipelines will be added, 1789.8 meters of rainwater pipelines will be rebuilt, 104 new inspection wells will be added, and 145 newly added rainwater outlets will be newly built. There were 57 rainwater inspection wells and completed an investment of 751.97 million yuan. Invested 540,000 yuan to complete the leveling and fence project of the sewage treatment plant. The annual discharge of sewage is 15 million tons. From the beginning of the year to the end of October, the collection of paid use of drainage facilities reached 80% of the annual charging task. More than 50 pumping trucks were dispatched during the rainy season to solve the problem of flooding in some residents during the rainy season.
6. Heating: Blue Sky Thermal Company invested 21 million yuan to complete the new pipe network of 11 kilometers and transform the first-level pipe network by 5 kilometers.
7. Road: Successfully complete the expansion of Tongjiang Street, Traffic Street and National Defense Road, and expand the road area of 20,500 square meters to basically solve the traffic congestion phenomenon. Renovation of 6 outdoor stairs of Tongjiang Street, newly laid crow's foot sidewalk board of 29,500 square meters, marble road along the stone 7000 extended meters, tree strip stone 4,920 pieces, 4 new sculptures, built pve guardrail 350 meters, the city appearance has been Great change. Six 9132 square meters of hardened roadway, repairing more than 20 damaged roads, 1070 square meters, and transforming 6 bridges and culverts, greatly facilitating residents' travel and vehicle driving safety.
8. Greening: In order to improve the greening quality of our county, we planted 26,700 trees, such as cloves, sugar maple, cutting maple, eucalyptus, purple leaf, and Yanfulai, and planting 30,000 flowers in the main streets such as Tongjiang Street. . Two small scenic spots have been added. Plants, green spaces and trees have been planted. Stone tables and stone benches have been installed to harden the ramps, making it easy for casual people to rest. In order to increase the green land rate and green coverage area, 9270 square meters of green land will be built in Tongjiang Street, and 5,000 tree seedlings will be planted outside the city.
9. Lighting: Complete the street lamp time-sharing transformation and rationalize the district power supply project. The street lights in the town were turned into six areas, which solved the problem of long power supply lines, high loss and high line loss. The street lamp line in the town is divided into 18 loops, and the street lamp power supply is divided into multiple time periods to control, which greatly provides the use efficiency of the street lamp. Tongjiang Street re-installed street lights 60盏, traffic lights added 60 new street lights, other streets and community courtyards added 12 miles, and Jiangpan Park added 2 solar lights. Support the construction of new countryside, install 110 solar street lamps and 18 garden lights for the second village. The street lights in the town were fully maintained 4 times, and the lighting rate was 96%.
Construction market
1. Relocation work: In the year of XX, 5 demolition and relocation permits were issued, and 197 relocated households were demolished. The demolition area was 19,732 square meters. There was no demolition and petition.
2. Construction market management: Strictly implement the “Architectural Law” and “Heilongjiang Construction Market Management Regulations”, and strictly manage the construction market according to law. There are a total of 23 projects under construction, with an area under construction of 223,900 square meters, of which 5 carry-over projects have a carry-over area of 28,900 square meters, and 18 new additions have reached an area of 195,000 square meters. In addition to the completion of bidding for 3 projects before XX, the remaining 15 projects have completed project bidding, of which 4 projects are open tenders, and 11 other projects are invited for bidding, and 7 are completed according to regulations. For project supervision and bidding, the bidding rate and filing rate of the bidding project shall be 100%.
3. Project quality supervision: All the 18 projects under construction in the county are registered, and the supervision work plan is issued according to the regulations, and the supervision coverage rate is 100%. Five complaints were handled, and the results were all satisfied by the public. Seriously implement the "Regulations on the Supervision and Administration of Construction Project Quality", strictly control the project approval, materials, quality, and no engineering quality accidents.
4. Safety production: Standardized management shall be implemented in strict accordance with the requirements of the “Construction Standard Atlas of Construction Site Safety Inspection of Heilongjiang Province Construction Site”. The overall construction safety production situation of the county remained stable. There were no major construction safety accidents in the construction industry of the county, and the general accident rate was zero.
City management
1. Urban planning: In order to build the landscape and landscape city of Xunke County, this year, the provincial planning and design department was hired to carry out a new round of urban overall planning and revision work for our county. At the same time, it also carried out control detailed planning and constructive detailed planning work. The preparation work, feasibility study and demonstration and preparation work have been completed. This year, our county adopted the form of film development. The county government set up a planning management committee and held regular planning approval meetings. This year, a total of 14 203,800 square meters of construction land was approved for approval, requiring a novel design and uniform color tone. Strictly plan the approval procedures, implement the “one book and two certificates” issuance system, establish and improve the tracking and supervision of construction projects, ensure the accuracy and operability of planning and design, ensure the conservation and rational use of urban land, and make urban construction. Activities are carried out in a coordinated, healthy and orderly manner in strict accordance with the requirements of the overall urban planning. This year, the construction of new buildings in the urban planning area of Qioke Town was completed at 124,400 square meters. Completed the treatment of urban sewage system in border towns and the site selection and mapping of sewage treatment plants and garbage treatment plants of 30,000 square meters, and completed the mapping of 34,000 square meters of Xishan water source. The project construction volume filed 110 volumes and provided 36 file visits. At present, a total of 8 illegal buildings have been investigated and handled, and the court has been applied for demolition.
2. Environmental sanitation:
In order to improve the overall level of environmental sanitation facilities, establish and improve the mechanism of garbage collection, separation, recycling and harmless treatment, and construct a garbage transfer station, garbage collection house and garbage separation plant in the west of Sunjia Highway North Plains Slaughter Plant. It has divided the cleaning and cleaning team, and implemented the management methods of fixed sections, fixed personnel and fixed responsibilities. It is responsible for cleaning and cleaning all the road sections that have been divided, and the road hygiene has reached the standard of “seven nets and five nos”. The road surface area is about 520,200 square meters, and the system is cleaned once a day and cleaned for four hours. The public toilets are cleaned twice. Up to now, the garbage has been cleared and transported by more than 30,600 cubic meters. In the spring, the total amount of snow and ice is 22,000 cubic meters, and the weeds are cleared and 58 vehicles are collected. The sanitation fee is 185,000 yuan. Backfilling 120,000 cubic meters of deep pits on both sides of the second water source has created a good environment for the economic development of our county.
Real estate industry
1. Housing transactions: 735 households purchased for personal housing, with an area of 61,000 square meters, 250 mortgages, an area of 20,900 square meters, a loan amount of 270.8 million yuan, and 389 households for sale and purchase. The total annual fee is 517,000 yuan. .
2. Housing security work: The area of shanty towns for demolition is 52,000 square meters, the construction area is 120,000 square meters, and the investment is 150 million yuan. The construction of low-rent housing was 20,800 square meters, and 259 low-rent housing units were sold, and 28 households were rented in kind. The low-rent housing rental subsidy work won the special subsidy for low-rent housing security of 10.24 million yuan to the state in accordance with the principle of insurance coverage. The rental subsidy is in the declaration stage and the task is completed before the end of December.
3. Pre-sale of commercial housing: Continue to strengthen the management of pre-sale of commercial housing and the inspection of the pre-sale of commercial housing in the development and construction units, and increase the propaganda of relevant policies. Handled 10 copies of residential registration for 87,000 square meters.
4. Collection of property maintenance funds: collection of property maintenance fund of 100,600 yuan.
The construction of villages and towns should earnestly grasp the construction and management of villages and towns, steadily promote the transformation of rural mud houses and dangerous houses, strictly control all links, and ensure that all constructions are carried out in a healthy and orderly manner.
1. Progress in the renovation of rural mud houses and dilapidated houses. In XX, a total investment of XX million yuan, the removal of mud houses of 17,600 square meters, completed the transformation of 340 households, added energy-saving housing of 26,500 square meters, housing brick and tile rate increased by 1.96 percentage points over the previous year.
2. Construction of supporting facilities in the new countryside. Vigorously carry out comprehensive improvement of the village environment, and strive to increase investment to improve the living environment. At present, the village has more than 80,000 trees planted in the village, investing 240,000 yuan, and a green area of 3,600 mu. It is steadily promoting the work of firewood and landfill. On the basis of this, we have increased the control of livestock and poultry pollution, continued to implement livestock and poultry captivity and construction of animal manure treatment points; established four cultural complexes with an investment of 1.4 million yuan, and the construction has been completed; completed the maintenance of existing street lamps in various towns and towns in our county. Replacement work; road hardening, side ditch hardening work progress steadily, this year, the side ditch hardening completed more than 14,000 meters, the rainwater pipeline 2 km, the road hardened 20.5 km; 150 additional garbage bins; 5 new cultural station activity rooms, There are 15 “six-in-one” offices in the new countryside.
3. Management of village and town planning and construction. The survey of the status quo of a town and four villages has been completed, and the construction planning of the two villages has been completed. A comprehensive survey and registration of the basic conditions of the villages in the county has been carried out.
4. Construction of small towns: Xunhe Village, a provincial demonstration village, this year, 48 households were rebuilt with mud and grass houses, 2,976 square meters of mud house were demolished, and 3,744 square meters of energy-saving houses were added; maintenance and replacement of damaged street lamps 86, set up New solar street light 50盏; side ditch hardened 2100 extended rice; built rainwater pipeline XX extended rice, rainwater seepage well 16; replacement iron fence 5000 extended rice, added 40 garbage bins, equipped with two garbage trucks; construction commercial residence There is a building of more than 7,000 square meters in a comprehensive building, 44 households with peasant residential buildings, and the farmers in the mud-grass house are purchased at the cost price. The project has been completed and is in the process of completion and acceptance.
The provincial-level pilot village Xinglong Village of Ganzizi Township has completed 60 rural housing renovations; newly built solar streetlights 7盏; widened hardened pavements with two thousand extension meters, side ditch hardened 1000 extended meters, and replaced iron fences 900 meters; The square is 1600 square meters.
Spiritual civilization actively carried out various spiritual civilization establishment activities, and successfully held a special performance of the party committee of the "Red Onyx" Art Festival Construction Bureau. In the system, the best unit review activities of “paying attention to people's livelihood and service development” were carried out, and party members and cadres were organized to carry out the “xxxx” responsibility area, social aid activities and charity activities, and practice the scientific development concept. Constantly strengthen team building, carry out various business theory studies and professional technical knowledge training activities, and establish a strong urban and rural construction team to ensure the smooth implementation of various tasks.
Second, the deficiencies and problems in the work Through the joint efforts of the overall staff, the SIPO has better completed the various work plans at the beginning of the year and the various tasks arranged by the county party committee and the county government, but there are still some deficiencies in the work. Problems to be solved:
Urban construction and development are not balanced, and urban infrastructure construction cannot be timely matched, which restricts the development of urban construction to a certain extent.
Difficulties in moving and urban management are difficult. The difficulty of mobilization and the passive price of passive relocation have become a major problem restricting urban development; the imperfect urban management system has seriously affected the image of the city.
The renovation of shanty towns and the renovation of rural mud houses and dangerous houses need to be further promoted.
Construction market management needs to be further standardized, and safety production and engineering quality supervision should be further strengthened.
Third, XX year key work plan
Urban and rural construction projects in XX, including road engineering, underground drainage works, landscaping projects, park expansion projects, and urban and rural planning. It is now described as follows:
Urban construction work
1. Road: Broaden the national defense road, the southern section of the traffic street, lay the sidewalk board, curb stone, and cancel the open ditch.
2, landscaping: the actual extension of the riverside park, the county standard, music fountain at the entrance of the customs, greening and lighting around the experimental country.
3. The exterior decoration of the Tongjiang Street building. Bare land management, tree slabs are surrounded by trees and stones, and white pebbles or tree pits are placed inside the tree pits.
4. Drainage: The drainage main line of the town is 3441 extended meters, with an estimated investment of 3.63 million yuan.
Renovation of shanty towns: plans to demolish 73,000 square meters of bungalows, 150,000 square meters of new buildings, of which 693 sets of low-rent housing units are 34,600 square meters.
Rural construction work plans to transform 500 mud houses and dangerous houses, with a construction area of 32,500 square meters, and an investment of 31.2 million yuan, of which 2.5 million yuan will be won.
Urban planning and urban management
1. Complete the overall planning and revision work of the border towns and cities
2, complete the control detailed planning 2 square kilometers at the same time do a good job in the economic development zone and industrial park control detailed planning, an area of 1 square kilometers.
3. Strengthen the approval and filing management of municipal engineering pipelines. Municipal engineering pipeline projects such as heating, water supply, electric power, telecommunications, broadcasting, television, etc. must be approved by the planning and construction department before construction, and the construction drawings will be filed after completion.
4. The city management changed to the direction of business management and established a cleaning company.
The "three for two treatments" work fully fulfilled its duties, fully promoted the "three supply and two governance" work, and strived to start construction of sewage and garbage control projects as soon as possible.
Xunke County Construction Bureau
November 9, XX
I. Main work completion urban infrastructure construction
1. “Three Supply and Two Treatments”: The feasibility study report, special plan, environmental assessment and preliminary design have been completed, and land approval is being processed, and construction is being prepared.
2. Expansion of Jiangpan Park: Complete 15,000 square meters of the first phase of the Riverside Park West Expansion Project. The main projects include squares, porches, flower stands, sketches, street lamps, garden lights, nursing homes, public toilets, flower beds, marble floors, etc. It has been basically completed, and some squares have been paved for XX years. This year, the investment was about 4 million yuan.
3. Water supply: In order to let the people of Xunke County eat the qualified water and completely solve the problem of water pollution, it is planned to build the Xishan water source in the upper reaches of the city. The site selection and exploration, the use of 4 eyes and 9 eyes have been completed. Well work and other work, the feasibility study report can be completed in the near future. The design of water supply capacity, the recent 14,000 tons / day, the long-term 22,000 tons / day, the planned investment of 34 million yuan, is expected to be completed and put into use at the end of XX.
Pipe network reconstruction project: Renovation of 5.2 km of 5 sections of street and community pipe network, and maintenance of more than 20 pipe networks, greatly reducing the phenomenon of running and dripping.
4. Comprehensive market: Complete the relocation of the morning market and Hong Kong street market, move to the new integrated market, solve the traffic congestion on Tongjiang Street and the fire hazard in Hong Kong Street.
5. Drainage: A total of 4915 meters of new main drainage lines will be laid throughout the year, 550.5 meters of rainwater pipelines will be added, 1789.8 meters of rainwater pipelines will be rebuilt, 104 new inspection wells will be added, and 145 newly added rainwater outlets will be newly built. There were 57 rainwater inspection wells and completed an investment of 751.97 million yuan. Invested 540,000 yuan to complete the leveling and fence project of the sewage treatment plant. The annual discharge of sewage is 15 million tons. From the beginning of the year to the end of October, the collection of paid use of drainage facilities reached 80% of the annual charging task. More than 50 pumping trucks were dispatched during the rainy season to solve the problem of flooding in some residents during the rainy season.
6. Heating: Blue Sky Thermal Company invested 21 million yuan to complete the new pipe network of 11 kilometers and transform the first-level pipe network by 5 kilometers.
7. Road: Successfully complete the expansion of Tongjiang Street, Traffic Street and National Defense Road, and expand the road area of 20,500 square meters to basically solve the traffic congestion phenomenon. Renovation of 6 outdoor stairs of Tongjiang Street, newly laid crow's foot sidewalk board of 29,500 square meters, marble road along the stone 7000 extended meters, tree strip stone 4,920 pieces, 4 new sculptures, built pve guardrail 350 meters, the city appearance has been Great change. Six 9132 square meters of hardened roadway, repairing more than 20 damaged roads, 1070 square meters, and transforming 6 bridges and culverts, greatly facilitating residents' travel and vehicle driving safety.
8. Greening: In order to improve the greening quality of our county, we planted 26,700 trees, such as cloves, sugar maple, cutting maple, eucalyptus, purple leaf, and Yanfulai, and planting 30,000 flowers in the main streets such as Tongjiang Street. . Two small scenic spots have been added. Plants, green spaces and trees have been planted. Stone tables and stone benches have been installed to harden the ramps, making it easy for casual people to rest. In order to increase the green land rate and green coverage area, 9270 square meters of green land will be built in Tongjiang Street, and 5,000 tree seedlings will be planted outside the city.
9. Lighting: Complete the street lamp time-sharing transformation and rationalize the district power supply project. The street lights in the town were turned into six areas, which solved the problem of long power supply lines, high loss and high line loss. The street lamp line in the town is divided into 18 loops, and the street lamp power supply is divided into multiple time periods to control, which greatly provides the use efficiency of the street lamp. Tongjiang Street re-installed street lights 60盏, traffic lights added 60 new street lights, other streets and community courtyards added 12 miles, and Jiangpan Park added 2 solar lights. Support the construction of new countryside, install 110 solar street lamps and 18 garden lights for the second village. The street lights in the town were fully maintained 4 times, and the lighting rate was 96%.
Construction market
1. Relocation work: In the year of XX, 5 demolition and relocation permits were issued, and 197 relocated households were demolished. The demolition area was 19,732 square meters. There was no demolition and petition.
2. Construction market management: Strictly implement the “Architectural Law” and “Heilongjiang Construction Market Management Regulations”, and strictly manage the construction market according to law. There are a total of 23 projects under construction, with an area under construction of 223,900 square meters, of which 5 carry-over projects have a carry-over area of 28,900 square meters, and 18 new additions have reached an area of 195,000 square meters. In addition to the completion of bidding for 3 projects before XX, the remaining 15 projects have completed project bidding, of which 4 projects are open tenders, and 11 other projects are invited for bidding, and 7 are completed according to regulations. For project supervision and bidding, the bidding rate and filing rate of the bidding project shall be 100%.
3. Project quality supervision: All the 18 projects under construction in the county are registered, and the supervision work plan is issued according to the regulations, and the supervision coverage rate is 100%. Five complaints were handled, and the results were all satisfied by the public. Seriously implement the "Regulations on the Supervision and Administration of Construction Project Quality", strictly control the project approval, materials, quality, and no engineering quality accidents.
4. Safety production: Standardized management shall be implemented in strict accordance with the requirements of the “Construction Standard Atlas of Construction Site Safety Inspection of Heilongjiang Province Construction Site”. The overall construction safety production situation of the county remained stable. There were no major construction safety accidents in the construction industry of the county, and the general accident rate was zero.
City management
1. Urban planning: In order to build the landscape and landscape city of Xunke County, this year, the provincial planning and design department was hired to carry out a new round of urban overall planning and revision work for our county. At the same time, it also carried out control detailed planning and constructive detailed planning work. The preparation work, feasibility study and demonstration and preparation work have been completed. This year, our county adopted the form of film development. The county government set up a planning management committee and held regular planning approval meetings. This year, a total of 14 203,800 square meters of construction land was approved for approval, requiring a novel design and uniform color tone. Strictly plan the approval procedures, implement the “one book and two certificates” issuance system, establish and improve the tracking and supervision of construction projects, ensure the accuracy and operability of planning and design, ensure the conservation and rational use of urban land, and make urban construction. Activities are carried out in a coordinated, healthy and orderly manner in strict accordance with the requirements of the overall urban planning. This year, the construction of new buildings in the urban planning area of Qioke Town was completed at 124,400 square meters. Completed the treatment of urban sewage system in border towns and the site selection and mapping of sewage treatment plants and garbage treatment plants of 30,000 square meters, and completed the mapping of 34,000 square meters of Xishan water source. The project construction volume filed 110 volumes and provided 36 file visits. At present, a total of 8 illegal buildings have been investigated and handled, and the court has been applied for demolition.
2. Environmental sanitation:
In order to improve the overall level of environmental sanitation facilities, establish and improve the mechanism of garbage collection, separation, recycling and harmless treatment, and construct a garbage transfer station, garbage collection house and garbage separation plant in the west of Sunjia Highway North Plains Slaughter Plant. It has divided the cleaning and cleaning team, and implemented the management methods of fixed sections, fixed personnel and fixed responsibilities. It is responsible for cleaning and cleaning all the road sections that have been divided, and the road hygiene has reached the standard of “seven nets and five nos”. The road surface area is about 520,200 square meters, and the system is cleaned once a day and cleaned for four hours. The public toilets are cleaned twice. Up to now, the garbage has been cleared and transported by more than 30,600 cubic meters. In the spring, the total amount of snow and ice is 22,000 cubic meters, and the weeds are cleared and 58 vehicles are collected. The sanitation fee is 185,000 yuan. Backfilling 120,000 cubic meters of deep pits on both sides of the second water source has created a good environment for the economic development of our county.
Real estate industry
1. Housing transactions: 735 households purchased for personal housing, with an area of 61,000 square meters, 250 mortgages, an area of 20,900 square meters, a loan amount of 270.8 million yuan, and 389 households for sale and purchase. The total annual fee is 517,000 yuan. .
2. Housing security work: The area of shanty towns for demolition is 52,000 square meters, the construction area is 120,000 square meters, and the investment is 150 million yuan. The construction of low-rent housing was 20,800 square meters, and 259 low-rent housing units were sold, and 28 households were rented in kind. The low-rent housing rental subsidy work won the special subsidy for low-rent housing security of 10.24 million yuan to the state in accordance with the principle of insurance coverage. The rental subsidy is in the declaration stage and the task is completed before the end of December.
3. Pre-sale of commercial housing: Continue to strengthen the management of pre-sale of commercial housing and the inspection of the pre-sale of commercial housing in the development and construction units, and increase the propaganda of relevant policies. Handled 10 copies of residential registration for 87,000 square meters.
4. Collection of property maintenance funds: collection of property maintenance fund of 100,600 yuan.
The construction of villages and towns should earnestly grasp the construction and management of villages and towns, steadily promote the transformation of rural mud houses and dangerous houses, strictly control all links, and ensure that all constructions are carried out in a healthy and orderly manner.
1. Progress in the renovation of rural mud houses and dilapidated houses. In XX, a total investment of XX million yuan, the removal of mud houses of 17,600 square meters, completed the transformation of 340 households, added energy-saving housing of 26,500 square meters, housing brick and tile rate increased by 1.96 percentage points over the previous year.
2. Construction of supporting facilities in the new countryside. Vigorously carry out comprehensive improvement of the village environment, and strive to increase investment to improve the living environment. At present, the village has more than 80,000 trees planted in the village, investing 240,000 yuan, and a green area of 3,600 mu. It is steadily promoting the work of firewood and landfill. On the basis of this, we have increased the control of livestock and poultry pollution, continued to implement livestock and poultry captivity and construction of animal manure treatment points; established four cultural complexes with an investment of 1.4 million yuan, and the construction has been completed; completed the maintenance of existing street lamps in various towns and towns in our county. Replacement work; road hardening, side ditch hardening work progress steadily, this year, the side ditch hardening completed more than 14,000 meters, the rainwater pipeline 2 km, the road hardened 20.5 km; 150 additional garbage bins; 5 new cultural station activity rooms, There are 15 “six-in-one” offices in the new countryside.
3. Management of village and town planning and construction. The survey of the status quo of a town and four villages has been completed, and the construction planning of the two villages has been completed. A comprehensive survey and registration of the basic conditions of the villages in the county has been carried out.
4. Construction of small towns: Xunhe Village, a provincial demonstration village, this year, 48 households were rebuilt with mud and grass houses, 2,976 square meters of mud house were demolished, and 3,744 square meters of energy-saving houses were added; maintenance and replacement of damaged street lamps 86, set up New solar street light 50盏; side ditch hardened 2100 extended rice; built rainwater pipeline XX extended rice, rainwater seepage well 16; replacement iron fence 5000 extended rice, added 40 garbage bins, equipped with two garbage trucks; construction commercial residence There is a building of more than 7,000 square meters in a comprehensive building, 44 households with peasant residential buildings, and the farmers in the mud-grass house are purchased at the cost price. The project has been completed and is in the process of completion and acceptance.
The provincial-level pilot village Xinglong Village of Ganzizi Township has completed 60 rural housing renovations; newly built solar streetlights 7盏; widened hardened pavements with two thousand extension meters, side ditch hardened 1000 extended meters, and replaced iron fences 900 meters; The square is 1600 square meters.
Spiritual civilization actively carried out various spiritual civilization establishment activities, and successfully held a special performance of the party committee of the "Red Onyx" Art Festival Construction Bureau. In the system, the best unit review activities of “paying attention to people's livelihood and service development” were carried out, and party members and cadres were organized to carry out the “xxxx” responsibility area, social aid activities and charity activities, and practice the scientific development concept. Constantly strengthen team building, carry out various business theory studies and professional technical knowledge training activities, and establish a strong urban and rural construction team to ensure the smooth implementation of various tasks.
Second, the deficiencies and problems in the work Through the joint efforts of the overall staff, the SIPO has better completed the various work plans at the beginning of the year and the various tasks arranged by the county party committee and the county government, but there are still some deficiencies in the work. Problems to be solved:
Urban construction and development are not balanced, and urban infrastructure construction cannot be timely matched, which restricts the development of urban construction to a certain extent.
Difficulties in moving and urban management are difficult. The difficulty of mobilization and the passive price of passive relocation have become a major problem restricting urban development; the imperfect urban management system has seriously affected the image of the city.
The renovation of shanty towns and the renovation of rural mud houses and dangerous houses need to be further promoted.
Construction market management needs to be further standardized, and safety production and engineering quality supervision should be further strengthened.
Third, XX year key work plan
Urban and rural construction projects in XX, including road engineering, underground drainage works, landscaping projects, park expansion projects, and urban and rural planning. It is now described as follows:
Urban construction work
1. Road: Broaden the national defense road, the southern section of the traffic street, lay the sidewalk board, curb stone, and cancel the open ditch.
2, landscaping: the actual extension of the riverside park, the county standard, music fountain at the entrance of the customs, greening and lighting around the experimental country.
3. The exterior decoration of the Tongjiang Street building. Bare land management, tree slabs are surrounded by trees and stones, and white pebbles or tree pits are placed inside the tree pits.
4. Drainage: The drainage main line of the town is 3441 extended meters, with an estimated investment of 3.63 million yuan.
Renovation of shanty towns: plans to demolish 73,000 square meters of bungalows, 150,000 square meters of new buildings, of which 693 sets of low-rent housing units are 34,600 square meters.
Rural construction work plans to transform 500 mud houses and dangerous houses, with a construction area of 32,500 square meters, and an investment of 31.2 million yuan, of which 2.5 million yuan will be won.
Urban planning and urban management
1. Complete the overall planning and revision work of the border towns and cities
2, complete the control detailed planning 2 square kilometers at the same time do a good job in the economic development zone and industrial park control detailed planning, an area of 1 square kilometers.
3. Strengthen the approval and filing management of municipal engineering pipelines. Municipal engineering pipeline projects such as heating, water supply, electric power, telecommunications, broadcasting, television, etc. must be approved by the planning and construction department before construction, and the construction drawings will be filed after completion.
4. The city management changed to the direction of business management and established a cleaning company.
The "three for two treatments" work fully fulfilled its duties, fully promoted the "three supply and two governance" work, and strived to start construction of sewage and garbage control projects as soon as possible.
Xunke County Construction Bureau
November 9, XX
recommended article
- City Statistics Bureau study practice activities analysis check order
- Food and Drug Administration Medical Device Special
- Summary of the work of the State-owned Assets Supervision and Administration Commission
- Summary of the development work of the quota society in 2019
- Construction Environmental Protection Bureau work summary
- 2019 township economic affairs service center work
- Establish a safety production demonstration township summary report
- Summary of the work of leading cadres of the legal system
- Summary of the work of the deputy chief of the street and work in 2019
- Summary of the annual work of law enforcement according to law
- Summary of the special rectification work of county fertilizer quality
- County Bureau of Commerce in-depth study and practice of scientific development concept
popular articles
- Space mood phrase
- Not afraid of failure
- Respect the teacher's famous words
- Non-mainstream sentence 2019
- 2014 motivational phrase
- Encourage words 2019
- Summary of the comprehensive management work in 2019
- 2014 civilized unit establishment summary
- Life motto
- Motivate employees
- Relieved words
- Distressed sentence 2019
- Good sentence excerpt 2019
- Summary of the work of the Association for Science and Technology in 2019
- Grateful mother's words
- Philosophical words 2019
- Summary of discipline inspection and supervision work in 2019
- Weibo's famous sayings
- Summary of the work of letters and visits in 2019
- Summary of county discipline inspection work in 2019
- Summary of personal work of the post office in 2019
- Parental love
- Hyun dance family impression sentence
- Legal maxim
- Summary of new rural construction work
- Report on the Democratic Life of Party Members in October 2019
- Blessing phrase
- Summary of the Party's Work Style and Clean Government Construction in 2019
- What I said to my father 2019
- Spring Festival blessing