Work Summary > Technical Work Summary

Summary of equipment maintenance work


Continuing 2011, still working, but there are new changes. However, after 365 days, it was safe and smooth.

In charge of the daily management of boilers, central air conditioning, purification stations, water source pumping stations. Organize the preparation and review of equipment maintenance, spare parts and materials planning in the work. At the same time, in charge of inventory materials management, engineering materials planning procurement management.

Boiler management: The winter heating was completed at the end of February. All four operators obtained the operation certificate, and the boiler and HVAC pipeline obtained the use certificate issued by the Municipal Bureau. In March, normal maintenance is carried out according to the maintenance instructions provided by the manufacturer. The various procedures are perfect. The boiler was operated for three months, 902 hours, and consumed 210 tons of coal.

Central air-conditioning management: Summer refrigeration and air-conditioning began to be commissioned and sent air-conditioning at the end of June. Two operators were inspected. The other four technicians assisted the manufacturer in the operation training of the operators. At the same time, the equipment and pipeline defects were repaired and rectified and improved. Normal working condition. The refrigeration system runs for two months and consumes 122,600kwh

Purification station management: The water treatment system of the purification station is an important process of life supply, and the operation is basically normal. Consult and propose a purification process improvement plan for reference during decision making.

Water source pump station management: This station is the source of the company's production and living water supply, focusing on routine maintenance and repair work, and the operation is basically normal. Implement the management system of “avoiding peak electricity”. More than 90% of the water source pump is guaranteed to operate in the “Valley”. The annual electricity consumption is 183,952kwh, which saves about 57,000 yuan compared with the white shift system.

Inventory management: The company's material inventory management was put into use at the beginning of the year, equipped with a full-time management staff and an operator. Basically established a logistics management program, the materials are sent and received to store various types of reporting systems, the establishment of various types of ledgers, the establishment of materials procurement, warehousing, and approval systems, basically entering a normal state. The initial inventory of the annual materials was 830,000 yuan, with a total storage of 4.56 million yuan, a total of 4.2 million yuan, and a ending stock of 1.19 million yuan.

Engineering material management: Engineering A supply is the company's larger capital flow and logistics operation. Equipped with a full-time management staff to carry out the implementation and procurement of the project. Work under the company's existing system. The basic supply of engineering materials is guaranteed. among them:

Steel: The purchase volume is 7725.779 tons, and the amount of funds is 33.78 million yuan;

Cement: The purchase volume is 10,574.91 tons, and the amount of funds is 3.6 million yuan.

Equipment maintenance and spare parts planning management: Regular maintenance and maintenance of the operating equipment under its jurisdiction, spare parts planning is fully prepared, and maintenance is carried out in a timely manner.

Several specific tasks:

Organize the implementation of laboratory equipment / laboratory equipment materials planning, responsible for the procurement of equipment, instruments, freight elevators and fan installation, to ensure that the temporary laboratory moved into the new inspection building on schedule. A total of 113,220 yuan for laboratory cabinets, fans, etc., 150,239 yuan for sample preparation equipment, and 41,500 yuan for freight elevators, totaling 304,959 yuan. Some instruments are temporarily purchased when needed.

Under the situation of the national energy conservation and emission reduction giant regulation, the situation of cement supply shortage has been overcome, and the supply of cement for construction, especially for cement construction, has been basically guaranteed.

In terms of steel procurement, the supplier is adjusted in time according to the company's capital flow situation, taking into account the demand variety, price, transportation cost, etc., and some varieties are directly purchased from the factory to meet the project needs and reduce capital occupation.

Institutionalization and standardization of management: strengthening the establishment and improvement of the system; clarifying job responsibilities; strengthening the awareness of process discipline and work discipline;

Equipment maintenance and repair system: enhance the maintenance of the plan; have a reasonable spare parts inventory.

Safety management work: carry out good team safety activities for the established team; assign relevant technical personnel to carry out safety activities for unemployed workers.

Rationality of the plan: the project plan is in place; the spare parts materials for production are accurately planned; the procurement is timely; the stock is reasonable.

The air-conditioning system gradually promotes automation and unattended management to reduce manpower consumption;

Water source pumping station management, try to study energy-saving operation, at the same time, consider the production needs of the large-scale plant, need to build an independent duty room or staff lounge outside the station;

Standardize the logistics management program, establish a reasonable and advanced management platform, improve the orderly management of materials, establish a reasonable inventory, and save production costs;

The purification station process needs to be further improved to ensure the quality of domestic water and try to improve the quality of life of employees.

Reasonably arrange the number of relevant posts, improve the quality of employees, establish an efficient operating mechanism, and rationally save human resources.

Strengthen the improvement of their own quality and continue to learn without slackening.

Through continuous learning of technical business knowledge in an unfamiliar position, the basic rules of the management category have been basically mastered, and the work has a certain foundation.

At the same time, by studying the theory of scientific development concept, we try our best to improve our political literacy, and recognize the situation, grasp the direction and the belief of the party in the specific work and practice of the company's development and construction, and strive to be a qualified Technicians and a responsible grassroots manager.

Always remember: Integrity, responsible for the company, responsible for yourself!

In the above-mentioned job report, leaders at all levels should be reviewed. Inappropriate, I hope to correct.

Thank you!