Personal professional technical summary essay
Time flies, the years are like a shuttle, and I have graduated in the blink of an eye for more than four years. In these four years, I have worked in three jobs. In the course of my work, I not only deepened my understanding of the original learning knowledge, but also had a better understanding of the knowledge that was not touched or touched in previous books.
After graduation, I first went to work at xx Cement Group xx. Xx Industrial Company is a wholly-owned subsidiary of xx Cement Group. Its main business includes engineering construction, kiln masonry and equipment maintenance, bag dust collector manufacturing and installation. As a technician in engineering management, I first received training in welder training for bag dust collectors. Through the training, I learned the expertise of making bag-type dust collector process, production points, installation points and so on. Followed by equipment engineers to learn materials, calculations, equipment manufacturing monitoring, material selection and other knowledge. In the end, it is possible to help select the selected equipment model and design the appropriate dust collector model according to customer needs. In the two years of xx, I was mainly responsible for bag dust collector work, including dust collector material quantity control, bag dust collector quality inspection, and after-sales problem solving. He has repeatedly stopped workers from taking over and holding steel plates and other materials. He has checked the quality problems several times and ordered the workers to rework to ensure the quality of the equipment is qualified. The quality of our company's products is qualified, the after-sales service is convenient and timely, and the sales of dust collectors have grown substantially for two consecutive years. At the same time, in the work of overhauling cement equipment every year, it is responsible for the work of people, machinery, materials and statistics on the equipment. After several inspections, I found that the maintenance content and maintenance costs of many projects were relatively stable. Advising the chief of the technical department on the standard project standard charges. After obtaining the consent of the leader, the documents for the standard charging of the project were prepared according to the previous data, such as: installation and repair of the coal nozzle; rotary kiln door repair; dust collector maintenance and many more. It has completely solved the cumbersome matters of technicians, machines and materials in all projects for a long time, and signed and approved the charges by the technicians of Party A, and solved the problem that the technicians were wrong due to the large number of statistics during the maintenance period. Received praise from the leadership. In the two years from XX to XX, due to work hard, and in the spare time to participate in the management group library and other reasons, the company won the title of “Group Young Advanced Individual” in the 03-XX year. He was awarded the title of “Tangshan Youth Volunteer”.
After the contract expires, I feel that the state-owned enterprises are inefficient and the methods are slow to improve. Therefore, I refused the company renewal contract.
My second job is the equipment engineer at the back of Enma Microelectronics Co., Ltd. When I entered the company, it happened that the company invested $2 million to introduce advanced plating equipment from the Netherlands. I was assigned to the electroplating shop and worked with several colleagues to install and commission the machine with a foreign equipment engineer at the Dutch meco machine. After more than three months of installation and commissioning, finally, the machine got the desired effect. We also know nothing about the ability to operate the machine, and with the help of the equipment supplier, develop a detailed machine maintenance plan. I also trained several operators and equipment technicians according to the requirements of the leaders. With the help of several colleagues, I summarized the relevant specifications in equipment maintenance according to the problems in the operation of the machine and the company's 5s requirements: A series of ppt files such as "Precautions for Maintenance", "Standards for Storage of Potion", "Specifications for Maintenance Clothing", "Specifications for Handover Matters", "Standards for Storage of Parts", "Emergency Measures for Accidents", "Specifications for Tool Storage". Some of them have now become training materials for technicians entering the back of the package. At work, I always try hard to learn and summarize. At the beginning of the factory, I found that the factory that has not been put into use is also lighting up for 24 hours, and the idea of opening the lights at intervals is proposed to the company. 150,000 yuan in electricity bills. The company gave me material rewards; in the quality slogan contest, I won the award for excellence. Today, those slogans are still hanging in the company corridors, canteens and other places.
My third job is an engineer at Gaode Equipment Installation Engineering Co., Ltd. Responsible for secondary distribution and distribution of the company's amd project. In a relatively short period of time, I was familiar with the operations of on-site management and material procurement, and completed the project. And in time to deal with several issues during the warranty period, get the customer's approval.
After working for several years, I found that my work is relatively broad, I know more theory, and my eyes are wider. This is my strength. However, I have found more of my own deficiencies. I have not thoroughly studied the work, the specific business is not familiar enough, and does not have the requirement of “one specialization and many abilities”. In the future, I will work hard, actively study business, strive to be professionally proficient, be competent in many aspects of work, and make my own contribution to society.
After graduation, I first went to work at xx Cement Group xx. Xx Industrial Company is a wholly-owned subsidiary of xx Cement Group. Its main business includes engineering construction, kiln masonry and equipment maintenance, bag dust collector manufacturing and installation. As a technician in engineering management, I first received training in welder training for bag dust collectors. Through the training, I learned the expertise of making bag-type dust collector process, production points, installation points and so on. Followed by equipment engineers to learn materials, calculations, equipment manufacturing monitoring, material selection and other knowledge. In the end, it is possible to help select the selected equipment model and design the appropriate dust collector model according to customer needs. In the two years of xx, I was mainly responsible for bag dust collector work, including dust collector material quantity control, bag dust collector quality inspection, and after-sales problem solving. He has repeatedly stopped workers from taking over and holding steel plates and other materials. He has checked the quality problems several times and ordered the workers to rework to ensure the quality of the equipment is qualified. The quality of our company's products is qualified, the after-sales service is convenient and timely, and the sales of dust collectors have grown substantially for two consecutive years. At the same time, in the work of overhauling cement equipment every year, it is responsible for the work of people, machinery, materials and statistics on the equipment. After several inspections, I found that the maintenance content and maintenance costs of many projects were relatively stable. Advising the chief of the technical department on the standard project standard charges. After obtaining the consent of the leader, the documents for the standard charging of the project were prepared according to the previous data, such as: installation and repair of the coal nozzle; rotary kiln door repair; dust collector maintenance and many more. It has completely solved the cumbersome matters of technicians, machines and materials in all projects for a long time, and signed and approved the charges by the technicians of Party A, and solved the problem that the technicians were wrong due to the large number of statistics during the maintenance period. Received praise from the leadership. In the two years from XX to XX, due to work hard, and in the spare time to participate in the management group library and other reasons, the company won the title of “Group Young Advanced Individual” in the 03-XX year. He was awarded the title of “Tangshan Youth Volunteer”.
After the contract expires, I feel that the state-owned enterprises are inefficient and the methods are slow to improve. Therefore, I refused the company renewal contract.
My second job is the equipment engineer at the back of Enma Microelectronics Co., Ltd. When I entered the company, it happened that the company invested $2 million to introduce advanced plating equipment from the Netherlands. I was assigned to the electroplating shop and worked with several colleagues to install and commission the machine with a foreign equipment engineer at the Dutch meco machine. After more than three months of installation and commissioning, finally, the machine got the desired effect. We also know nothing about the ability to operate the machine, and with the help of the equipment supplier, develop a detailed machine maintenance plan. I also trained several operators and equipment technicians according to the requirements of the leaders. With the help of several colleagues, I summarized the relevant specifications in equipment maintenance according to the problems in the operation of the machine and the company's 5s requirements: A series of ppt files such as "Precautions for Maintenance", "Standards for Storage of Potion", "Specifications for Maintenance Clothing", "Specifications for Handover Matters", "Standards for Storage of Parts", "Emergency Measures for Accidents", "Specifications for Tool Storage". Some of them have now become training materials for technicians entering the back of the package. At work, I always try hard to learn and summarize. At the beginning of the factory, I found that the factory that has not been put into use is also lighting up for 24 hours, and the idea of opening the lights at intervals is proposed to the company. 150,000 yuan in electricity bills. The company gave me material rewards; in the quality slogan contest, I won the award for excellence. Today, those slogans are still hanging in the company corridors, canteens and other places.
My third job is an engineer at Gaode Equipment Installation Engineering Co., Ltd. Responsible for secondary distribution and distribution of the company's amd project. In a relatively short period of time, I was familiar with the operations of on-site management and material procurement, and completed the project. And in time to deal with several issues during the warranty period, get the customer's approval.
After working for several years, I found that my work is relatively broad, I know more theory, and my eyes are wider. This is my strength. However, I have found more of my own deficiencies. I have not thoroughly studied the work, the specific business is not familiar enough, and does not have the requirement of “one specialization and many abilities”. In the future, I will work hard, actively study business, strive to be professionally proficient, be competent in many aspects of work, and make my own contribution to society.
recommended article
- Summary of Year-end Work of Power Supply Bureau
- Nanjing Auto Repair Association's 2004 work summary 05 years of work
- Professional technical summary
- Summary of Dengmai Village's work on high-tech industry development
- Summary of the teaching of the fifth grade information technology course
- Car maintenance team metallurgical year-end summary
- Summary of year-end work of technicians
- Personal expertise summary
- High-end Commodity Technology Department personal year-end summary
- Tietong Communication's personal technical title assessment work
- Personal professional technical summary essay
- Summary of professional technical work of substation operation
popular articles
- Parental love
- Spring Festival blessing
- Blessing phrase
- Weibo's famous sayings
- Philosophical words 2019
- Encourage words 2019
- Grateful mother's words
- Summary of professional technical work
- Summary of year-end work of technicians
- Hyun dance family impression sentence
- Summary of energy saving and emission reduction work in 2019
- Distressed sentence 2019
- Factory technician personal work summary
- Motivate employees
- Technical management work summary
- Non-mainstream sentence 2019
- Space mood phrase
- 2014 information technology teaching and research group work summary
- What I said to my father 2019
- Legal maxim
- Summary of professional technical work
- Good sentence excerpt 2019
- 2014 motivational phrase
- Relieved words
- Life motto
- Respect the teacher's famous words
- Summary of professional and technical work since taking office
- Summary of 2019 technical staff business work
- Summary of information technology work
- Not afraid of failure