2019 annual personal work summary
First, Fuxia line work
The work of signing the change of class ii of Fuxia Line was lagging behind, which led to our passive signing work. In the hardship of signing, I learned a lot of lessons and summarized the experience. The signing work must be very familiar with the information and construction site that has been signed. In the process of dealing with the supervision, design unit and the owner, there is sufficient courage to indicate that the construction work cannot be carried out according to the actual situation of the construction site. After communicating with the design unit, it is proposed to change, and it is necessary to reasonably recognize the number of projects added by the change in a timely manner, and also communicate with the accounting department to ensure that the signing items in the signed materials are reasonable and effective, so that the true meaning is achieved. We changed the purpose of the claim in the second operation.
The completion data of the Fuzhou-Xiamen line has been collected from the previous period to the completion of the group, the transfer, so that I have a strong feelings for the completion of the Fuxia line, and also benefited a lot. Completion data mainly include construction completion report, project summary, engineering quantity table, construction and delivery form, design change notice, track section, inspection lot, on-site data, test data, material certificate, mechanical manual, engineering log, unit project acceptance record. The table consists of the contents, and the information is divided into the original and the copy according to the requirements of the owner and the line takeover unit. During the handover of the completion data, I accepted the education of the regular army of Nanchang Bureau, Xiamen Works Section and China Railway First Bureau, and knew the integrity and importance of the archives.
In the technical work, I am very fortunate to have access to the technical standards of the Fuzhou-Xiamen passenger line. For a technician who is in a good position, the high standard construction process and strict acceptance requirements are challenges to me. . The loading and unloading work of the loading and unloading team seems to be simple. In fact, the long-track car must first communicate with the on-site technician before loading the car, check the rail section table, and then follow the track design description, line description and seamless line layout requirements. Carry out the loading, keep abreast of the progress of the track laying in front, and timely issue the loading list to meet the requirements of the track laying.
Second, Xiamen-Shenzhen line work
The material plan of the special line of the second line of the Yingxia line, the US oil tank special line, due to my unclear drawing of the road map, the sleeper without the pillow area will be deducted, resulting in the second back of the sleeper from the scene back to the track base. As a technician , I did not master the drawings and standards, which caused inconvenience to the on-site construction, which was enough to explain the rigor of technical work. Cross-construction of the second transfer line of Yingxia Line, the construction of the existing line and the new line, only 9km of track laying, all construction procedures and technical information must be kept up to date, not to be sloppy, it can be said that the sparrow is small and dirty All.
Third, the requirements in the future work
With the experience and lessons of the Fuxia line, in the future work, I am full of confidence in myself, and there is no rule. I have the following requirements: I will carefully study the normative standards and related archives, and master the professional knowledge. Improve your ability to work, strengthen your sense of responsibility, and complete the work of leadership arrangements in a timely manner.
In short, in the future work, I will continue to summarize and reflect, constantly spur myself and enrich the energy, and better improve their own quality and business level.
recommended article
- Summary of Year-end Work of Power Supply Bureau
- Tietong Communication's personal technical title assessment work
- Car maintenance team metallurgical year-end summary
- Personal expertise summary
- Summary of year-end work of technicians
- Summary of the teaching of the fifth grade information technology course
- Summary of Dengmai Village's work on high-tech industry development
- High-end Commodity Technology Department personal year-end summary
- Nanjing Auto Repair Association's 2004 work summary 05 years of work
- Professional technical summary
- Personal professional technical summary essay
- Summary of professional technical work of substation operation
popular articles
- Strong words
- Deaf people jingle 2019
- English famous words
- The latest high school inspirational maxim
- Summary of professional technical work
- Factory technician personal work summary
- Teacher's famous saying
- Bing Xin’s famous words
- Summary of information technology work
- Describe the fast time sentence 2019
- Thanks to the friend's words 2019
- Qq space mood phrase
- Technical management work summary
- Summary of professional and technical work since taking office
- Du Yuexi's famous sayings
- 2014 information technology teaching and research group work summary
- Classical life motto
- Tao Xingzhi's famous sayings
- I want to say something to the teacher.
- Summary of 2019 technical staff business work
- Sad love sentence 2019
- Injured sentence
- College entrance examination inspirational quotes
- Korean swear words
- Summary of year-end work of technicians
- Summary of professional technical work
- 2014 is very touching words
- a good saying that loves labor
- Taizai’s famous sayings
- Summary of energy saving and emission reduction work in 2019