Xxxx year is about to pass. According to the unified arrangement of the supervision department, I will summarize the work of 200* annual work. From January to March, I am in the supervision station of the left bank diversion tunnel project department, responsible for the work of the c-standard supervision station, March 20 On the day of the work, transfer to the left bank underground plant project department, responsible for the three major cave room supervision station, the supervision project is the left bank underground power plant project, I will briefly summarize the three aspects

During the first quarter of the work during the diversion tunnel, the main project of our project was the excavation and support treatment of the atomization area of ​​the excavation support of the excavation support of the left-wall c-guide diversion tunnel, and the diversion section of the diversion tunnel was The tail water combined section is downstream, which is part of the permanent project. The design requirements are high. The requirements for the appearance of the flatness are within 3mm. Because I have accumulated some construction experience in the lining construction of the left bank of the Xiaowan Hydropower Station, according to these construction units. The technicians worked together to carefully study the measures to prevent the occurrence of cracks. For the design requirements of the appearance quality of the concrete, the steel mold trolley was optimized and improved, and the sealing measures for the excessive feeding window were put forward. The quality has been gradually improved, and the construction progress is also controlled within the planning node.

On March 20 this year, I officially transferred to the underground plant project department. Since the Xiluodu Hydropower Station underground powerhouse project is one of the largest underground powerhouses in the world, as a hydraulic engineer, I am proud to participate in the construction. I am both proud and deeply felt. Responsibility is great, only hard work, continuous study, can adapt to the work requirements of the plant project

1 Coordinating the working relationship of the employees in the station, managing the work in the station to ensure the effective operation of the supervision station

2 Coordinating external working relationships, such as between the construction units of the adjacent sections of the interior of the owner's design supervision department to ensure normal construction.

6Approving the monthly progress plan of the supervision project, the construction operation guide, reviewing the plan for the use of the plan for the distribution of materials, participating in or presiding over the supervision project, reviewing the various measures of the project, and proposing pre-examination

In response to the above work, under the correct guidance of the project department leaders, I worked with the colleagues in the station to complete the tasks well in the project safety control and other project supervision and control, to achieve the expected goals.

The year xxxx is the first year since the commencement of the Xiluodu project. It is also the first year of the underground powerhouse project. It is difficult to start all things. This year's work, especially since the transfer to the underground powerhouse, is deeply stressful. There are several aspects. It has a shortpart:

In terms of quality control, there is still a gap between the quality of the excavation and the quality of the Three Gorges underground power station. Further measures are needed to increase supervision, ensure that the construction quality meets the design requirements, and the owners are satisfied, so that the supervision department leaders can be assured.

In terms of internal management, especially the collection and collection of anchor spray support data, the requirements of the owner and the completion acceptance requirements still need to be further improved.

The professional and technical level needs to be improved, and the management knowledge needs to be carefully studied to meet the management requirements of the small owner's supervisor.

The first year of excavation will be ushered in the construction of the underground powerhouse project. It is also a key year for the construction of the plant. The management site has many points, such as the construction of the rock wall crane beam anchorage and other quality control points. Expanded one after another, everything is pre-emptive

Actively collect relevant information, study and study the construction technology of rock anchor beam in advance, and propose a plan for quality control management

Seriously think about the management work in the station next year, we must fully mobilize the enthusiasm of everyone's work, brainstorming, and work together to get the job done.

Strengthen communication and communication with owners' design, strengthen internal management, strengthen image collection and external publicity work, and fully demonstrate the performance of supervision stations

Strengthening the study, especially the theoretical study of the supervision engineer's knowledge, plans to participate in the national supervision engineer exam next year, and strive to improve their business level

When people reach middle age, they feel more time-honored, and they will go away in a year. And for the ringing New Year’s bell, I think of a sentence: I don’t work hard today, I’m trying to find a job tomorrow, I hope to be in the comrades next year. With the help, the work will be completed better, and the leaders of the supervision department will be satisfied.