Work Summary > Technical Work Summary

Geological technician work summary


My name is xxxx, xxxx I passed the college entrance examination in July, and I was admitted to the Department of Geological Engineering of xx University. He graduated smoothly in June XX, and joined the work in September of the same year. He was assigned to the Xxxx branch of Western Mining Co., Ltd., and it has been in the past year. In this short period of time, with the help of the company's leaders and colleagues, in accordance with job responsibilities and behavioral norms, we worked hard to do our job and earnestly completed the tasks assigned by the leadership. There has been a great improvement in the ability to work.

Being positive in thinking, we can conscientiously implement the party's basic principles and policies, actively learn political theory, adhere to the four basic principles, abide by the law and abide by the law, love the post and dedication, and have a strong sense of responsibility and dedication. Actively learn professional knowledge, work attitude is correct, serious and responsible, with good ideological and political quality, ideological quality and professional ethics.

In terms of work attitude and hard work, I love my job, be able to take every job correctly and seriously, and be able to actively find my own deficiencies and learn to supplement in time.

In the life, we will carry forward the fine tradition of hardship, simplicity, hard work, and willingness to help others. We will always be honest, be diligent and diligent, unite our colleagues, be pragmatic and realistic, be optimistic, and always maintain a rigorous and serious work attitude and meticulous work. style.

In terms of work ability and professional knowledge, I came to the company for more than a year, mainly to the internship of Huaye Second Mine. My internship in the second mine is mainly divided into three departments. They are the excavation workshop, the measurement office and the geological office. In the excavation workshop and measurement office, I mainly understand learning, and most of the time I work in the geological office. During the internship of Huaye No. 2 Mine, under the enthusiasm of the leaders and colleagues, and detailed explanations, they also understood and participated in some specific work. Although the work was trivial, it was very rewarding. There are mainly the following aspects:

Responsible for the organization and management of relevant geological technology: often go deep into the underground site, master the geological conditions of the underground, identify the geological factors affecting production and construction, compile the original geological catalogue and drilling catalogue, report all relevant geological conditions in time, and ensure the normal connection of production; Collect geological data of exploration and mining face, timely understand geological conditions, conduct in-depth investigation and research on production, and solve problems.

During my work, I don't miss it, don't waste every opportunity to exercise, speed up the constant updating of my knowledge and improve my own quality. At the same time, use spare time to ask leaders and colleagues about mine geological and mining knowledge, and strive to combine geology and mining to become a geological person suitable for mine work.

1. During the internship, often go down the well to record and sample the tunnel recording and production of prospecting holes. Indoors, sort out the downhole cataloging materials. As a geological technician, I completed all the work on time according to the needs of production.

1. Production prospecting: In the past year, in order to meet the needs of mining and continue to develop and extend on the basis of geological prospecting, various pit exploration projects and drilling were carried out to further identify or determine the shape and quality characteristics of ore bodies and the upgrading of reserves. engineering. Thereby providing detailed geological basis for mine mining and guiding construction. Through the production of prospecting design, original cataloging, comprehensive cataloging, sampling and other work, has submitted 2,642 middle section 20-31 line, 15-07 line, yard engineering, 2582 mid-slope ramp development, 035 line and other production prospecting materials.

2. Reserve verification: Inspected the middle ditch-fault ditch mining area, using autocad, mapgis and other software to take charge of the verification of reserves, and participated in the preparation of the reserve verification report. I learned a lot during the entire inspection and reserve report writing process.

3. Deep and peripheral prospecting: further explore the small ore bodies in the edge and deep, and cooperate with engineers to strengthen the peripheral exploration. In order to meet the needs of mine production and development, we continue to expand our geological reserves.

4. According to the existing data, determine the exploration type and exploration network degree, summarize the previous exploration results of the deposit and the comparison of exploration and mining, and use the experience of typical deposits according to the scale of the deposit, the complexity of the shape, and the stability of the thickness change. The geological factors such as the complexity of the structure and the uniform distribution of the useful components in the ore are used to classify the difficulty of ore exploration. Determine the reasonable exploration type and exploration network, can correctly arrange geological exploration projects, achieve effective mineral reserves, and meet the needs of mining design. Provide geological basis for the rational development and utilization of the deposit.

5. Loss of losses: prevent mining from abandoning poverty; strengthen construction management and mine management to prevent the loss of mineral resources caused by blind development; accurately control the spatial distribution of ore bodies and the changes in ore quality, and supervise the ore quality of each mining site. And the quality, timely grasp the implementation of the production and mining plan and the quality of the stope, strictly control the waste rock mixing and ore grade in the ore, so that the ore loss and depletion indicators are reduced to a predetermined level.

6. In August XX, participated in the high-level forum of the prospecting and prospecting prospects of the Xitieshan lead-zinc mine.

7. Assisting colleagues in the establishment of a digital mine model, the reference and application of mine digital software will promote the change of technology and management methods of mining enterprises, which is expected to be completed by the end of October.

Second, the problems still exist in the work

Since I was engaged in geological work, I have felt that the work is busy and the responsibility is great. When big things and small things are pressed on the body, I always pay attention to this one, but I ignore the one. It is a bit heavy and heavy, and I can’t systematically Work, mainly in the following aspects:

1. Just after joining the work, there is not enough experience, and the understanding of the complex area of ​​the ore body is not deep enough.

2. The theoretical knowledge is not solid enough, the practical ability is poor, and the connection between theory and practice is not enough.

The above problems, although the impact on the work is not great, but I always feel that I have not fulfilled the duties of a technician, and I will try my best to do better in the future work.

In the year of internship and work, I have a systematic understanding of the genesis of the entire mine and the occurrence of ore bodies, which has a great guiding role for my future work in the mine. Also learned the calculation of reserves. I understand and master the basic process and basic work of production prospecting work, which has greatly helped me to work in the mine in the future.

Third, the future work plan

By summing up the work of the past year, despite some progress and achievements, there are still some deficiencies in some aspects, no innovative work ideas, and individual work is not perfect enough. In the future work, I will try my best to find out the shortcomings in my work so that I can overcome it in my future work. At the same time, I need to read more books, carefully study the norms and procedures, and master the professional knowledge and improve my work. Ability, strengthen the sense of responsibility for work, and do a good job in personal work in a timely manner. Constantly summarizing and introspecting, constantly urging ourselves and enriching energy, improving their own quality and business level, to adapt to the development of the times and enterprises, and progress together with the company and grow together.

recommended article

popular articles