2019 technician personal year-end summary


XX is a fruitful year. For me personally, XX is a year of comprehensive improvement in personal professional skills. In the past year, as a technical cadre with experience in engineering construction of the Steam Turbine Engineering Department of the Yandian Engineering, I participated in the technical work of several construction teams of the steam turbine professional part or part. It is in this busy and fulfilling year that under the unique conditions of the electric power project, on the one hand, I have tested my original engineering and technical knowledge and further deepened it. On the other hand, I have initially built myself. Professional knowledge system.
I. Work Overview The technical work that I am personally responsible for throughout the XX year can be roughly divided into several time periods from the perspective of the staged construction of the project.
At the beginning of the new year of XX, the two major projects of Haikou and Baima were in the critical period of construction and construction. The entire steam engine team only had one technical cadre. As the only technical cadre of the steam engine team, I am responsible for the technical work of all the teams of the steam engine. At the same time, the preparation of more than 60 sets of construction drawings for all 21 large systems of the steam engine is also a time-critical, extremely important and extremely important task.
From the time when other technical cadres entered the site in April to August, my work focus has changed. I am mainly responsible for managing the daily construction technical work of the first class and the second class, and the staged construction tasks that have not been completed in the previous period. During this period, the tasks I was responsible for were mainly the installation of 1, 2# steam engine room steel platform, 3 high-pressure heater lifting haulage, circulating pump house driving track beam and driving installation, plant circulating water pipeline installation and pipeline work tasks. The high-pressure water supply pipeline involved in the 1# boiler water pressure test was installed.
Since August, the technical work tasks that I have taken have gradually been divested. The second task of the pipeline has completely delivered the new technical cadres transferred to the site in early September, and the tasks have been alleviated. In October of this year, I began to take over the installation technical tasks of two steam-powered water pumps. In the face of new work tasks, my professional skills accumulated into a new stage. Up to now, my work focuses on the installation of two steam-driven water pump sets, the installation of steam pipelines, the installation of temporary pipelines, and the perfection of all the steam-water pipeline systems in charge of construction.
II. Summary of Work In the work of XX, I have never been intimidated by a series of heavy construction tasks and faced with a strange technical work. For the engineering and technical work that I am engaged in, I have always held the view that I despise it from the consciousness. After all, these works have mature construction experience to draw on. It is a lot of engineering and technical personnel like me who are working together. The work; but in terms of work methods and strategies, I take a prudent attitude, because from the work practices of these systems, valuable experience can be accumulated and learned from the details of the work.
Every job that I handed over to the team leader is regarded as a valuable opportunity for personal work experience. Successful completion of the task is my only goal. It is my only work attitude to do my best to solve the construction problem. Every project that I am responsible for has been involved in the whole process, and I have full control over the construction points of the unit project and the sub-project. Take the installation of the steel platform of the steam engine room and the installation of the circulating water pipe as an example. These two construction tasks are the earliest unit projects carried out by the steam turbine team. During the construction of these two projects, I often rush between the main building and the circulating water pipe ditch. Check the implementation of the construction project points, and discuss and solve the construction difficulties with the construction team leader. It is precisely because I really put myself into the construction process, I have mastered the span of the steel platform column, the verticality and the elevation control of the steel column node installation, the quality control of the connection, the installation quality control of the circulating water pipe, etc. Series construction points.
To say that bitterness and tiredness, every employee on the construction site must have a deep understanding, and as a team technician, I have a taste for the taste of the scorpion. At the busiest time of construction, I have nearly 20 construction teams running every day. From the 61-meter boiler to the circulating pump house, I have to run several times a day. There is only one reason - I am an engineering technician. Because of the work needs, with the high temperature of more than 40 degrees in summer, I also discussed and solved the difficulties in the construction of circulating water pipes together with the construction team leader in the hot sun, and checked the construction quality. Since I entered the construction site this year, I have only taken five days off in more than 300 days. The rest of the time, like the workers of the steam engine team, I work overtime every day for the smooth operation and power generation of the company’s first 600mw unit. Happiness is busy, rain or shine, cold and heat do not invade.
As a staff member of a modern large-scale enterprise, as a new era of engineering and technical personnel, in addition to hard work and hard work, I am constantly summing up and making continuous progress. The conventional construction process has long been memorized in the depths of my mind. The new problems and difficulties encountered in the construction process are the key points I have summarized. During the busiest period of the project, all the things in the day cannot be solved on the same day. I will classify these things and plan them. Because my only engineering experience before the Luzhou project was the 135mw project of Panzhihua, I had insufficient work experience and encountered many problems. I have made timely corrections to my own shortcomings and mistakes, and for the facts that have been established, the approach I take is to treat it positively, analyze the reasons from my own shortcomings and mistakes, and summarize the lessons learned. It becomes its own wealth.
In addition to technical work, I also held the position of the general branch of the project team and the branch of the installation team, and also the head of the Qinghaigang of the steam engine team. Participating in youth activities is my consistent goodness. I actively participated in every activity of the Youth League Committee and performed my duties well in the activities of the Youth League Committee. In the youth activity section, my only regret is that due to the busy work, I failed to carry out the activities of the steam turbine team as much as possible in the original plan. In XX, the steam engine construction site publicity task was not completed very well. This is the defeat of my project.
III. Summary I have always adhered to such a philosophical statement - Tian Xingjian, the gentleman is self-improving, I have always asked myself for the standards of a good engineering and technical personnel, and I have progressed because of this requirement. The glory of the company requires us to create with hard work. The development of the individual needs to be achieved with hard work. For these lofty goals, I have been working tirelessly and hard. In the future work, I will continue to guard against arrogance, arduous struggle, and work closely with everyone in the big family of the company, to use their splendid youth to achieve the company's take-off, to write their own with no regrets. Chapter.