Power plant personal expertise summary


I graduated from xxx University in xxx, and my major is power plant thermal power engineering, college culture. Up to now, he has worked in the boiler operation and value-long jobs of xx Power Generation Co., Ltd. and xx Co., Ltd. for 9 years. Looking back on the past nine years of inauguration, the results have been very fruitful. Whether it is from the political quality, cultural cultivation or business level, there has been a lot of work. Now it has leapt to a new level in ideological and political, theoretical level and work level.

Ideological and political aspects. Adhere to the four basic principles, resolutely support the leadership of the Communist Party of China, earnestly study Deng Xiaoping Theory, adhere to the "xxxx" important thinking and the "xx big" spirit, and always maintain the spirit of advancing with the times. I have a strong sense of professionalism, responsibility, and a sense of mission in my work, and I love my job. Over the years, I have always placed my study in an important position, and worked hard to improve my overall quality. The modest teachers and masters have learned professional skills and successfully fulfilled the requirements of their duties. As a long-term value, I practiced and asked others to achieve the spiritual realm that they first met. The laws and regulations that require others to abide by themselves must be followed first. Always ask themselves as an excellent grassroots technician, regulate their own words and deeds, and abide by the state. The laws and regulations, never doing things that violate the law and discipline, have done what a qualified citizen should do.

Professional and technical aspects. I participated in the construction, installation, commissioning and trial operation of the new power plant; presided over the preparation of the boiler and coal handling professional operating procedures, accident handling procedures and other technical files; training new employees for the power plant; leading the value of the personnel in the power plant economy Great achievements in operation and environmental protection indicators; effective prevention of power plant accidents, command and handling of power plant accidents; active participation in power plant management and advice, greatly promoted power plant management level; participated in power plant technical transformation work; And in the various assessments have also achieved great results.

Comprehensive, full participation in the construction, installation and commissioning, trial operation of the xxx power plant. In the work, I can find some problems and put forward my own corrective opinions. I am mainly responsible for the installation and commissioning of coal handling and boiler equipment in power plants. I will study the construction, construction and acceptance of the company in light of the actual situation with reference to the study of electric power construction and acceptance technical specifications. Technical specifications and various test and acceptance forms, thus effectively ensuring the smooth progress of construction and acceptance of power plants.

During the professional work of the boiler, I was appointed by the manager of the public works department as the person in charge of the boiler profession. In the case of tight time, heavy tasks, and lack of relevant information from the manufacturers, based on their own work experience and knowledge, they have completed many important tasks in the boiler operation profession. Drawing the drawings of each boiler system, presided over the preparation of "Boiler Accident Treatment Regulations", "Boiler Operation Regulations", "Boiler Operator Job Responsibilities and Safety Regulations". A lot of work has been carried out on the calculation of boiler coal consumption, consumption of limestone powder, consumption of light diesel oil and ash content. While doing the above work, take some time to insist on tracking the installation and construction of the boiler every day at the project site, and find some problems in time and report to the leaders of the public works department. Several of the above-mentioned boiler operation projects I have done have a major impact on boiler operation and safe production, and have been verified in several years of operational practice. In the absence of professional and technical personnel in the coal transportation profession, the work progress is blocked. I think from the overall situation, I am anxious to lead the initiative, give up the boiler profession that I have been engaged in and love, and ask the manager to ask the coal transportation professional to be responsible for all the work. Carry out. After obtaining the manager’s consent, they immediately worked overtime to write the “Coal Operation Rules”, “Dust Removal, Ash Removal and Dust Removal Operation Regulations”, “Coal Treatment Accident Treatment Regulations”, coal handling equipment number, coal transportation and dust removal and ash removal. A lot of work has been done, such as the record of slag handover and the preparation of the work log of the electrostatic precipitator. The completion of the above work is also of great significance and confirmed for the operation and safe production of the coal handling profession.

When the professionals of the company's plan to send thermal power plants to the xx power plant training, I once again stood in the front and was designated as the leader of the training staff. Before training at the xx power plant, I completed a lot of work including training schedules, training schedules for xx power plants, detailed training content for each major, training cost estimates, training contracts, rules and regulations during training, and attendance during training. The above work has been affirmed by the leaders at all levels of the company. After arriving at the xx power plant, I fulfilled the duties of the leader, strictly managed and actively coordinated the various departments of the xx power plant, so that all members learned and played a great role in the future work practice. In addition, I was also responsible for the training of coal handling operators at the xxx power plant, training four people who had not previously engaged in coal handling to become qualified coal handling operators.

In the three-year job with a long value, the full-value staff will be actively involved in the performance appraisal of the power plant. In terms of how to improve the economic operation of power plants, after years of work experience and in-depth research, it is found that the main reason for the low utilization of thermal energy in thermal power plants is that there are various losses in the process of thermoelectric conversion, including: various heats. Loss, loss of function, power loss, loss of working fluid and consumption of electricity for the plant. In combination with the actual situation of the company, it is proposed to improve the economics of thermal power plants, and in the maintenance, operation and maintenance, find ways and take comprehensive measures to minimize these losses. At present, the main measures to improve the economic efficiency of thermal power plants are: reducing boiler smoke loss, reducing mechanical and chemical incomplete combustion losses, maintaining a high bed temperature as much as possible under the premise of desulfurization, and controlling the particle size of the incoming coal in the required range. Inside, increase the initial steam parameters and reduce the final steam parameters. In terms of environmental protection, how to reduce the so2 and nox emissions in boiler flue gas, I from the desulfurizer and coal feed particle size, desulfurizer characteristics, ca/s molar ratio, excess air ratio, bed temperature, wind speed, cycle rate, Several aspects of the effects of staged combustion, feeding mode and pressure on the desulfurization of circulating fluidized bed boilers are proposed to reduce the so2 emissions; I am from excess air coefficient, bed temperature, desulfurizer, cycle rate, furnace height The effect of fuel properties on the nox emissions of circulating fluidized bed boilers is proposed and controlled. It is precisely because of my effective methods that my leadership value has achieved good results not only in the economic assessment indicators of power plants, but also in the emission of environmentally-friendly boilers at the tail of the boiler. In addition, in the post with a long value, the prevention of power plant accidents and the command and handling of power plant accidents also performed well, and the leaders were affirmed.

Power plant management. In the work, I also actively participated in the management of the power plant, and wrote a management summary to the power plant supervisor every month. In addition, combined with the actual situation of the power plant, in the safety management, performance appraisal, staff emotions, unified responsibility, forward-looking, systematic management, raw material management, team management, put forward their own management ideas, published the "Power Plant Management Tips" article, This move was highly praised by the power plant leaders. It is also because of my participation in power plant management, which has brought a new improvement in the management of power plants.

Power plant technical transformation work. For the technical transformation work of the power plant, I also participated in the report and submitted the IE proposal. When the boiler of the power plant is started and piped every time, other parameters are met and the conditions are met, but the temperature of the main steam is delayed because the amount of water in front of the main steam valve is too small, slowing down and controlling the time during this period. , will discharge a large amount of steam in vain, such as the wrong indication of the meter or the operator misjudged

Broken, it is prone to such serious accidents as turbine water impact. The main steam trap front pipe has a small diameter and causes hydrophobic

Insufficient quantity is not safe for the production of power plants, and it is not economical. Therefore, I proposed the "#1.2 furnace main steam one front door hydrophobic pipe transformation" IE proposal and was approved by the department.

Theoretical level of learning. Practice requires theoretical guidance. Only when the theory is established can it be practiced. After work, I always realize that my knowledge is not enough. The power plant is the first line of production. Every link is full of technical content, but for ordinary operations, even if it is old. It can also be operated, but to make the work easy and understand the principles behind the operation, it must have a strong sense of urgency and perseverance to learn perseverance. In order to make myself better able to master the technical principles of my position and improve my technical level, I have been insisting on self-study for many years, reading a large number of professional works, including various standards, specifications and manuals, technical questions and answers, management, etc. books. Not only familiar with the professional knowledge of conventional thermal power plants, furnaces, electricity, chemical, coal, etc., but also rely on self-study to have a certain degree of understanding of gas turbines, waste incinerators. To enable a person who only knows his or her own professional knowledge to continue to learn and to achieve the knowledge of the various knowledge of the power plant, with the professional skills of an assistant engineer. My self-study efforts have also received good returns. In the power plant senior work exam held by the department, I achieved the first place.

Looking back on the work experience in the past few years, although I have paid a lot, even for my own career, I have sacrificed my family reunion, and I feel more comfortable in regrets. Because my own efforts have also received the due return, in the professional and technical work of the past few years, I have done more work with my own production practice in the power plant, and solved some technical problems for the unit that I worked for. Have a certain technical ability to work. But learning is endless, I will continue to learn and strive to grow into a better engineering and technical personnel.