Work Summary > Technical Work Summary

Road and bridge construction technology summary


XX is about to pass, reviewing the work of this year is busy and fulfilling. As the saying goes, there is a gain in working hard. Although there are some mistakes in this year's work, it has also gained a lot, unconsciously. It also improves its own work ability and business quality.
During the XX year, the site protection measures were strengthened during the Spring Festival in strict accordance with the company's rules and regulations and leadership arrangements. The personnel were in place; the division of labor was clear; the handover was recorded. It ensures safety and no accidents, and no loss of theft. During the on-site maintenance time, the machinery was carefully checked, hidden dangers were discovered in time, and key maintenance was carried out in advance. The primary vibrating screen bearing was replaced; the baffle in the drum was reinforced to replace some of the severely worn screws; the base of the mixing pot reducer was reinforced; the screws in the partially worn mixing pan were replaced; The cutter head has been adjusted to extend the use time and save costs.
Due to the fact that most of the construction site is not long during the discharge period, the conversion frequently increases the workload of the mixing building. This year's maintenance tasks were successfully completed with a small amount of personnel. Especially in the case that the current is unstable when the drum deformation motor is discharged, there is a phenomenon of stalling. When the discharge speed is affected, the adjustment of the drum is adjusted and the drum adjustment law is ensured to ensure the discharge speed.
In the daily work, I do more things, do more things, and diligently exchange ideas with workers. Strive to improve their own quality and moral cultivation.
Summarizing the work in this year is considered to be more serious and responsible, but each person has limited ability to work. Self-evaluation is not ideal for this year's work. It does not meet the requirements of his own requirements. Some of the work in the industry has caused the leaders to worry. This should not be the case. I must correct the work. I am willing to take the road and bridge as my home, contribute to the development of Luqiao Company, and do my best to strive for an honest and excellent Luqiao people.

recommended article

popular articles